40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  TCS elog, Page 1 of 6  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  Draft   Wed Mar 29 14:21:29 2023 JCLab InfrastructureFloor workLab Preparation for floor work[Koji,Yehonathan,JC]

The lab space has been cover and protected
  
  258   Fri Mar 24 14:57:11 2023 JCLab InfrastructureFloor workLab Preparation for floor workI prepared the East Side optical table on
one half. The other half will be completely
saran wrapped. The computer desk and Crackle
 Screen_Shot_2023-03-24_at_3.15.27_PM.png5C51CF4C-0982-45A4-9FE0-A5B05DBD75CA.jpegC5974FE2-8294-4C74-9FC6-854488CF17DB.jpegEB24F74E-6B70-41C4-92CA-170C78707F81.jpeg3BEF083E-2475-4BDC-9C7C-1D6AB431E163.jpeg 
  257   Tue Feb 28 09:44:43 2023 AidanLab InfrastructureGeneralAdded lighting and tidied West DeskI added LED stip lighting above the desk
on the West wall. I also tidied that
desk up (mostly in the drawers).
 IMG_3670.jpg 
  256   Thu Jan 12 11:52:47 2023 KojiLab InfrastructureGeneralHow to move the large engine hoist through the narrow doorHow to move the large engine hoist through
the narrow door

See http://nodus.ligo.caltech.edu:8080/Mariner/122
  
  255   Wed Jul 13 15:19:49 2022 JCElectronicsGeneralDesktop Computer [JC]

The desktop computer is now running
Debian Linux
  
  254   Fri Jul 8 07:06:41 2022 JcMiscVACDewar[Stephen, JC]

Stephen and I added a new valve
to Dewar's vacuum system. This valve
 29FCB85E-0AC8-43ED-8A43-31DC04459CD4_1_201_a.jpeg 
  253   Thu Jun 23 10:53:17 2022 JCLab InfrastructureGeneralSeat For Photodiode Testing[JC, Chub, Radhika]

Chub and I ordered a few parts
from McMaster in order build a handrail-like
 62AE8A4B-F817-4A03-A2F1-AE48B97FB935.jpgIMG_1392_2.jpg 
  252   Fri May 20 16:42:47 2022 StephenThings to BuyOrderingUp to Air valve for IR Labs CryostatPurchased from Lesker, for venting of IR
Labs Cryostat:

 - P/N C35103000
  
  251   Wed May 11 19:46:21 2022 Aidan, Radhika, JordanLab InfrastructureVacuum chamberLeak cleaning on IR labs vacuum chamber - suspects[Aidan, Jordan, Radhika]

Radhika and Jordan identified some
particulates (hair and flecks of foil) on
 IMG_8812.jpgIMG_8799.jpgIMG_8789.jpgIMG_8805.jpg 
  250   Wed Apr 27 11:41:53 2022 AidanLab InfrastructureGeneralLab clean-up to get ready for PD testing in old TCS LabWe (Aidan, Koji, Radhika, Aaron) partially
tidied up the TCS Lab. The front table is
clean and ready to recieve PD tesitng optics,
 IMG_8599.jpgIMG_8598.jpgIMG_8596.jpgIMG_8595.jpgIMG_8600.jpg 
  249   Thu Aug 26 09:00:39 2021 AidanMiscFloodLab flooded from broken pipe leading to sump roomSome photos of water and clean-up.

Summary: I came into the lab around
11:30AM and found water on the floor in the
 20210825_-_TCS_Lab_Flood_-_compressed.pdf 
  248   Wed Aug 25 11:28:56 2021 AidanMiscFloodLab flooded from broken pipe leading to sump room11:29AM - Lab has flooded again this morning.
I'm calling PMA. Looks to be the same
issue as before.
  
  247   Thu Aug 12 16:13:44 2021 AidanLab InfrastructureFloodCarpentry shop removed wet plaster sections from the wall - it's drying for a few daysThe carpentry shop removed wet plaster
sections from the wall following the flood
(process was gentle scraping of wet plaster
 IMG_4139.jpg 
  246   Tue Jul 27 08:39:33 2021 AidanMiscFloodTuesday (27-Jul) morning check - lab looks okayI checked the lab this morning. It was
dry and there wall was in the same state
as yesterday.
 Image_Pasted_at_2021-7-27_08-38-2.jpegImage_Pasted_at_2021-7-27_08-38.jpeg 
  245   Mon Jul 26 16:23:03 2021 AidanMiscFloodLab flooded from broken pipe leading to sump room 



Koji: QIL/TCS entrance flooding.
 IMG_3881.MOV 
  244   Tue Jun 15 08:47:27 2021 AidanLab InfrastructureGeneralCleaned up HWS table in preparation for lab moveI cleaned up the HWS table in preparation
for replacement with the 4x10 table. We still
need to move the cabinet and get the enclosure
 IMG_3056.jpg 
  243   Wed Oct 30 12:13:14 2019 JonMiscDelivery NoteNew lab hardwareIan and I moved some new hardware into
the lab, shown in the below photos. It is
from the shipment of loaned
 IMG_3782.jpgIMG_3783.jpgIMG_3784.jpgIMG_3785.jpg 
  242   Tue Sep 3 10:49:57 2019 AidanLab InfrastructureGeneralExhaust duct added for new bake area in TCS labFacilities came in on Friday and teed off
a new duct to provide exhaust for the proposed
new vacuum bake area in the TCS Lab. Photos
 IMG_1627.jpgIMG_1629.jpgIMG_1628.jpgIMG_1626.jpg 
  241   Fri Aug 16 17:05:14 2019 Edita BytyqiElectronics FLIR Images of new reflector focusing heatWe got 11 new semi-circle cut reflectors
of radius ~3.6 cm. I glued a screw to the
back of one reflector using the same epoxy
  
  240   Mon Aug 12 21:15:12 2019 Edita BytyqiElectronics Determining heater/reflector focusI took images of the heat pattern projected
on a piece of paper produced by the semi-circle
reflector. I used 108V to drive current throught
 20190812_151316.jpg20190812_151258.jpg 
  239   Fri Aug 9 20:33:11 2019 JonElectronicsRing HeaterPower-regulated heater ready to useDespite some considerable time spent,
I was not able to get the Omega SCR controllers
working. The first unit definitely arrived
 IMG_3576.jpgIMG_3577.jpg 
  238   Tue Aug 6 19:22:28 2019 JonElectronicsComputingQIL NFS server set upI've started building the NFS server
for the QIL cymac. It's sitting on the
workbench in the TCS lab next to the rack.
  
  237   Thu Aug 1 15:20:39 2019 Edita BytyqiLab InfrastructureOpticsReflector Mount and DC SupplyYesterday, we were able to take some data
using the 120 V DC power supply. The reflectors
cut at the focal point and radius were both
 20190731_170920.jpg20190801_145836.xcf20190801_145836.jpg20190801_150635.jpg20190801_145842.jpg 
  236   Mon Jul 29 18:53:16 2019 Edita BytyqiLab InfrastructureOpticsMounted Reflector and HeaterSince we set up the 2-lens system focusing
the laser beam to the CCD, the next step
was to mount the spherical reflector (31
 20190729_185214.jpg20190729_185156.jpg20190729_185153.jpg20190729_185139.jpg20190729_185112.jpg 
  235   Thu Jul 25 09:13:36 2019 JonThings to BuyGeneralNeed to Order GlovesNew gloves are ordered for the TCS and
QIL labs. They arrive tomorrow (Friday).

  
  234   Wed Jul 24 16:25:13 2019 Edita BytyqiLab InfrastructureOpticsUpdated 2-lens setupThe previous 2-lens setup focused the beam
to a tight spot, however due to the divergence
angle of the laser beam, a significant amount
 20190724_161926.jpg 
  233   Mon Jul 22 18:46:23 2019 Edita BytyqiLab Infrastructure Laser-Lens-HWS SetupToday, I set up a system consisting of
the 520 nm laser, a 2'' mirror and
two lenses of focal lengths f1 = 40 cm and
 20190722_183933.jpg20190722_183928.jpg 
  232   Mon Jul 22 18:44:53 2019 Edita BytyqiThings to BuyGeneralNeed to Order GlovesSmall/Medium size gloves need to be ordered
in order to handle the optics carefully.
  
  231   Mon Jul 22 09:44:21 2019 JonLab InfrastructureComputingInstalled Amplifying VGA SplitterThe VGA signal outputted by the multiplexer
is too weak to drive two monitors. This has
required video cables to be manually switched
 IMG_3522.jpgIMG_3421.jpg 
  230   Tue Jun 18 19:05:16 2019 JonLab InfrastructureGeneralLarge optical table cleared and set up for point absorbersAidan and I continued the lab clean-up
today. There's still more to do, but
we did fully clear the large optical table
 IMG_3421.jpg 
  229   Mon Jun 17 20:29:34 2019 JonLab InfrastructureComputingServer rack cleaned up, new workstation installedIn anticipation of the point absorber SURF
project, I cleaned up the server rack and
installed a new workstation today.
 IMG_3419.jpg 
  228   Thu May 23 11:36:49 2019 aguptaLab InfrastructureBorrowedBorrowed Label MakerI have borrowed TCS's label maker in
CTN for few days. If you need it, you can
take it from the top of blue cabinets.
  
  227   Mon Apr 15 08:12:58 2019 aaronLab InfrastructureGeneralMeasurements for Bake StationMy preference is to have tubes back towards
the wall where possible. We might be able
to drill a large diameter hole in the table
  
  226   Fri Apr 12 17:40:58 2019 aaronLab InfrastructureGeneralMeasurements for Bake StationI drew up one way we could set up the three
available bake ovens in the TCS lab on the
single oil pump. 
 BakeStation_Page_1.jpgBakeStation_Page_2.jpg 
  225   Fri Feb 8 10:48:33 2019 AidanLab InfrastructureGeneralWater damage repair work in the TCS LabCaltech Facilities has determined that
the walls in the SE corner of the TCS Lab
in West Bridge were water damaged during
  
  224   Tue Dec 4 16:57:08 2018 AidanComputingHartmann sensorUpdated GIT version of HWS codeI changed the HWS code to the new git.ligo
HWS version.


Object files are in ~/hws
scripts
  
  223   Fri Oct 26 09:49:47 2018 AidanMiscOpticsStarting 80C cure of epoxyI've started an 80C cure of two materials
bonded by EPOTEK 353ND. The objective is
to see (after curing) how much the apparent glass
 IMG_7054.jpg 
  222   Wed Oct 17 16:17:45 2018 awade, AidanComputingDAQAdded AWC thermocouple reader back to acromag1Acromag IOC process was removed from PSL
lab acromag1 computer a few months ago. 
Aidan needs them again but it would be better
 TCSIOCFILS.tar.gz 
  221   Thu Aug 16 11:52:27 2018 AidanComputingDAQAdded AWC thermocouple reader back to acromag1
Thermcouple reader is plugged into
an Acromag ADC (10.0.1.55)
acromag1
is now reading this in:

~/modbus/iocBoot/iocTest/test_acromag.cmd
  
  220   Fri Aug 3 15:46:12 2018 Aria ChaderjianLaserGeneralAugust 3, 2018To the best of my ability, calculated the
magnification of the plane of the test optic
relative to the HWS (2.3) and input this
  
  219   Tue Jul 24 16:52:44 2018 Aria ChaderjianLaserGeneralJuly 23, 2018 and July 24, 2018Attached the grid array of the HWS.

Applied voltage (5V, 7V, 9.9V,
14V) to the heater pad and took measurements
  
  218   Mon Jul 23 10:04:19 2018 Aria ChaderjianLaserGeneralJuly 20, 2018With Jon's help, I changed the setup
to include a mode-matching telescope built
from the f=60mm (1 inch diameter) lens and
 37767216_2077953269190954_5080703241788850176_n.jpg 
  217   Fri Jul 13 16:42:50 2018 Aria ChaderjianLaserGeneralJuly 13, 2018The table is set up. The HWS and SLED were
moved slightly, and a minimal angle between
the test mirror and HWS was achieved.
  
  216   Thu Jul 12 18:48:21 2018 Aria ChaderjianLaserGeneralJuly 12, 2018The beam reflecting off the test mirror
was clipping the lens between gold mirror
and test mirror, so I reconfigured some of
  
  215   Tue Jul 10 17:49:13 2018 Aria ChaderjianLaserGeneralJuly 10, 2018Went down to the lab and showed Rana the
setup. He's fine with me being down there
as long as I let someone know. He also recommended
 IMG_4518.jpgIMG_4517.jpg 
  214   Thu Jun 21 17:12:38 2018 AidanLaserHartmann sensorTwo inch PBS from Edmund Optics - effect on ETM HWS transmissionI'm considering the 86-711 2"
532nm PBS from Edmund Optics for the ETM
HWS at the sites.
 PBS_Thorlabs_v_EdmundOptics.pdf 
  213   Wed May 30 18:59:49 2018 awadeComputingDAQFB4 ip address has changedMaybe you've resolved this now. I moved
the DHCP allocation to 10.0.1.160 and
above around that time because a bunch of
  
  212   Wed May 30 18:50:05 2018 awadeComputingDAQRebooted fb4Time was still off by nine days as of yesterday. 
I tried rebooting remotely to see if time
would correct to system clock.  It didn't
  
  211   Fri May 18 16:32:37 2018 AidanLaserHartmann sensorHWS green LED fiber launcher - D1800125-v5_SN01Title was wrong - this is actually config
[12,2,4,125]

  
  210   Wed May 16 16:47:29 2018 AidanLaserHartmann sensorHWS green LED fiber launcher - D1800125-v5_SN01Here is the output from D1800125-v5_SN01.




 HWS_LED_D1800125_V5_sn01.pdfHWS_LED_D1800125_V5_sn01.mHWS_D1800125-v5_sn01_characterize_20180516.tar 
ELOG V3.1.3-