Caltech Facilities has determined that the walls in the SE corner of the TCS Lab in West Bridge were water damaged during last weekend’s rain. They are going to remove the plaster from the walls and dehumidify the area for a week or so. All tables in the room are going to be covered with plastic for this process. In the short term I’ve shutdown all the equipment in the lab (including FB4). The 2-micron cavity-testing fabrication has been moved next door to the QIL. |