40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  SUS Lab eLog, Page 37 of 38  Not logged in ELOG logo
ID Dateup Author Type Category Subject Text Attachments
  1901   Fri Feb 5 14:15:22 2021 ranaDailyProgressOpticsOPO cavity lockFor the splitting, I recommend not to use
a splitter.

Instead, you can use a -10 or -20
  
  1902   Wed Feb 17 11:56:48 2021 PacoLab InfrastructureElectronicsUPDH box zero model and SR560 "lock"UPDHv3 box (serial 17142) is bogus. While
retrieving values of some of the components
to plug into working zero model, saw the
 updhv3_VGA_gain.pdfSR560_OLTFSR785_17-02-2021_164500.pdf 
  1903   Thu Feb 18 09:39:01 2021 PacoDailyProgressElectronicsPDH error signal misbehavingError signal

Upon closer inspection
the error signal seems to vary quite significantly
on the scope (scanning @ 2 Hz), sometimes
 misbehaving_pdh.mp4 
  1904   Wed Feb 24 17:42:49 2021 PacoDailyProgressGeneralDOPO locking and SHGLocking update

The plan during
these past few days has been to have fast
control loop of the cavity (locked to laser
 shg.jpg 
  1905   Thu Feb 25 10:28:07 2021 PacoDailyProgressOpticsDOPO lock enduranceTest long term stability of the DOPO cavity
lock; The cavity remained resonant overnight
(start ~ 8 PM yesterday) and lost around
  
  1906   Tue Mar 9 19:21:38 2021 PacoMiscOpticsDOPO cavity pole- Noticed that the cavity transmission
peaks @ 1064 nm were much wider than originally
estimated by the dopo cavity design
  
  1907   Tue Mar 30 15:18:06 2021 PacoLab InfrastructureEquipmentLoan2um CCD borrowedWith Aidan's assistance, I borrowed


WiDy SWIR camera (Pembroke
WiDy SWIR 640U-A) from the QIL (Attachment
 IMG_20210330_151046.jpgIMG_20210330_150958.jpg 
  1908   Wed Apr 14 16:49:30 2021 PacoMiscOptomechanicsDOPO mount v2Drew some new mounting scheme for the DOPO
cavity; main revisions with respect to the
current mount are -->
 dopo_mount_v2.pdf 
  1909   Tue May 18 10:28:50 2021 PacoLab InfrastructureEquipmentLoanheimann sensor updateHeimann (HTPA80x64d) thermopile array;

-
First test to grab frames was done in my
personal Win10 machine, with no success.
 no_light.pnglight.png 
  1910   Wed May 19 09:25:34 2021 PacoNoise HuntingDOPO316 Hz noise[Paco]

- Have been investigating 316 Hz
noise in the control signal for the DOPO
  
  1911   Thu May 20 17:09:43 2021 KojiSummaryGeneralAnother Heimann SensorAnother Heimann Sensor / Boston Electronics
delivered to Paco.
This unit (purchased May 2020/ / Delivered
 P_20210520_151126.jpg 
  1912   Wed Jun 2 18:37:09 2021 PacoSummaryCrackleVent crackle experiment[Paco, Anchal, Ian, Yehonathan]

Today, in preparation for the optical
table to come, we vented the big crackle
  
  1913   Thu Jun 10 09:59:52 2021 PacoLab InfrastructureDOPODisassembly for new optical tableToday the DOPO v0 got disassembled to make
way for the optical table swap. Most components
have been stored in the white cabinet's
 IMG_20210610_092713.jpg 
  1914   Wed Jul 7 13:05:07 2021 PacoDailyProgress1418 nm AUX ECDLNew aspheric flexures[Radhika, Paco]

Today we fired up the 1418 nm ECDL
and attempted initial adjustment of the aspheric
  
  1915   Fri Jul 9 11:40:42 2021 PacoDailyProgress1418 nm AUX ECDLNew aspheric flexures[Radhika, Paco]

We tweaked the flexure alignment
until we had a nominally collimated beam
 IMG_1773.jpeg 
  1916   Wed Jul 14 12:21:08 2021 PacoDailyProgress1418 nm AUX ECDLECDL lases... and MZ locked mid-fringe[Paco]

Worked for a few hours to get the
aspheric properly aligned. The procedure
 selfhomodyne_1418.jpg 
  1917   Wed Aug 4 11:36:30 2021 RadhikaDailyProgress1418 nm AUX ECDL1419 nm ECDL with 2um AOM tests[Radhika, Paco]

In order to transition the ECDL
laser noise characterization to a heterodyne
 rf_setup.jpgdiffraction_levels.png 
  1918   Tue Aug 10 09:51:44 2021 PacoDailyProgress1418 nm AUX ECDL1419 nm ECDL AOM diffraction at 95 MHz[radhika, paco]

We changed the setup to use a low
power amplifier rather than the 5W amp from
 rf_setup.jpg 
  1919   Tue Aug 10 11:00:43 2021 PacoDailyProgressDOPODOPO v2[paco, nina]

We started rebuilding the DOPO
in the lab even though the new optical table
  
  1920   Thu Aug 12 11:49:59 2021 RadhikaDailyProgress1418 nm AUX ECDL1419 nm ECDL AOM diffraction at 95 MHz[Paco, Radhika]

When previously trying to characterize
the AOM, we had noticed no 1st order diffraction
 zeroth_order_contour.pdffirst_order_contour.pdf 
  1921   Tue Aug 17 11:09:29 2021 ranaDailyProgress1418 nm AUX ECDL1419 nm ECDL AOM diffraction at 95 MHzShould measure the S-matrix using a bi-directional
coupler.
  
  1922   Wed Sep 1 13:12:02 2021 RadhikaDailyProgress1418 nm AUX ECDL1419 nm ECDL AOM diffraction at 95 MHz    
  1923   Thu Sep 2 17:31:38 2021 RadhikaDailyProgress1418 nm AUX ECDL1418 nm ECDL Relative Intensity NoiseI took a relative intensity noise (RIN)
measurement of the ECDL, by feeding the 0th
order output of the AOM to the SR785. The
 ECDL_RIN_02-09-2021_165151_alone.pdf 
  1924   Thu Sep 16 15:21:21 2021 PacoDailyProgress1418 nm AUX ECDLFree space AOM[Paco,  Radhika]

Uninstalled the fiber AOM and temporarily
removed the third fiber 2x2 port beamsplitter.
  
  1925   Wed Sep 22 16:44:34 2021 RadhikaDailyProgress1418 nm AUX ECDLFree space AOM[Paco, Radhika]

We had previously noticed that
the ECDL laser power seemed weaker compared
  
  1926   Mon Oct 4 17:44:34 2021 RadhikaDailyProgress1418 nm AUX ECDLFree space AOM[Paco, Radhika]

Last Friday we received a new lens
to direct the AOM 1st-order beam from
  
  1927   Tue Oct 19 13:52:03 2021 RadhikaDailyProgress1418 nm AUX ECDL1418nm ECDL Frequency noise   ECDL_diagram.pdfECDL_FNM_13-10-2021_151524.pdf 
  1928   Tue Mar 8 09:32:56 2022 PacoDailyProgress1418 nm AUX ECDL1418nm ECDL Frequency noise[Paco, Radhika]

Beatnote recovery

Restarted
ECDL characterization last Friday. After
 schematic.pngraw_bn_spectrum.pngphase_timeseries.pngecdl_freqnoise.png 
  1929   Thu Jun 23 16:34:46 2022 PacoLab InfrastructureDOPORelocated DOPO setupFollowing Koji's request, I took some
time to clear the area surrounding the crackle
chamber so it can be migrated to the former
 PXL_20220623_222426584.jpgPXL_20220623_223623414.jpgPXL_20220623_224259785.jpg 
  1930   Tue Jan 10 23:40:17 2023 KojiLab InfrastructureGeneralHeavy item transport - preparation See http://nodus.ligo.caltech.edu:8080/Mariner/121   
  1931   Thu Jan 12 11:51:49 2023 KojiLab InfrastructureGeneralHow to move the large engine hoist through the narrow doorHow to move the large engine hoist through
the narrow door

See http://nodus.ligo.caltech.edu:8080/Mariner/122
  
  1932   Thu Jul 20 12:57:38 2023 aaronMiscEquipmentLoanAOM to cryo labI returned the Gooch & Housego R26035-2-1.55-LTD
AOM (SN 216939) from DOPO table
  
  1933   Mon Sep 25 15:56:17 2023 PacoLab Infrastructure1418 nm AUX ECDL2nd ECDL housing assembledI assembled the second ECDL with a 19XX
SAF gain chip (all pins remain disconnected),
and a 14XX nm angle facet plate with a grating.
 PXL_20230925_223237259.MP.jpgPXL_20230925_223622837.MP.jpgPXL_20230925_222547746.MP.jpgPXL_20230925_223541276.MP.jpg 
  1934   Tue Oct 17 22:11:21 2023 murtazaSummarySUSTriple Suspension SimulationI attempted a matlab simulation for closing
the loops on the triple suspensions. The
system (hsts) was imported from https://git.ligo.org/jenne-driggers/SUS.
 Screenshot_2023-10-17_at_9.52.29_PM.pngScreenshot_2023-10-17_at_10.10.38_PM.pngScreenshot_2023-10-17_at_5.31.06_PM.png 
  1935   Wed Oct 18 11:51:55 2023 murtazaSummarySUSTriple Suspension SimulationCloser look at the damping siutation.
tldr: Corrected electronics gain,
Signs of filters flipped, AND THE CORRECT
 Screenshot_2023-10-18_at_12.26.44_PM.pngScreenshot_2023-10-18_at_12.28.13_PM.png 
  1936   Thu Oct 19 18:22:21 2023 murtazaSummarySUSTriple Suspension SimulationJeff
Kissel: 


 5CF0AAFE-354E-43B6-B40B-F457A7A7E83C.jpgasd_m1sens_to_m3.pdf 
  1937   Fri Oct 20 12:13:00 2023 murtazaSummarySUSTriple Suspension SimulationI made some changes to the plots
tldr:
 - collected the linear and angular
 m1_sens_to_m3_disp.pdf 
  1938   Mon Oct 23 16:52:54 2023 murtazaSummarySUSTriple Suspension SimulationA velocity damping filter with of the following
form: zpk(0, 2*pi*[-20, -20], 100) was applied
to the Length DOF while the remaining filters
 Screenshot_2023-10-23_at_5.10.21_PM.pngScreenshot_2023-10-23_at_5.02.45_PM.pngScreenshot_2023-10-23_at_5.04.01_PM.png 
  1939   Fri Oct 27 01:00:37 2023 murtazaSummarySUSTriple Suspension SimulationWith the following goals:

- 10x lower noise magnitude than
the current filter design in the 10-20Hz
 1027_ASDandRD_comparison.png1027_longitudinal_filter_comparison.png1027_OLTF_BodeWMargins.png1027_OLTF_comparison.png 
  1940   Sat Oct 28 22:46:55 2023 PacoLab InfrastructureEquipmentLoanThorlabs HV pzt driverI took the Thorlabs PZT driver to the 40m
for use with the BHD OMC.
  
  1941   Mon Oct 30 12:08:35 2023 murtazaSummarySUSTriple Suspension SimulationPR3 Livingston Filter
Design (LONGITUDINAL DOF)

 10_30_ASDandRD_comparison.png1030_longitudinal_filter_comparison.png1030_OLTF_BodeWMargins.png1030_OLTF_comparison.png 
  1942   Tue Oct 31 14:14:52 2023 murtazaSummarySUSTriple Suspension SimulationPR3
Livingston Filter Design (PITCH DOF)

tldr:
 10_31_PASDandRD_comparison.png1031_pitch_filter_comparison.png1031_OLTF_BodeWMargins_P.png1031_OLTF_comparison_P.png 
  1943   Fri Nov 3 16:43:26 2023 murtazaSummarySUSTriple Suspension SimulationPR3
Trial Filter Design
 PR3_Final_Design_1103.pdf 
  1944   Thu Nov 9 12:56:10 2023 murtazaSummarySUSTriple Suspension SimulationDATA
ACQUISITION (FILTER MODULES) FROM LIVINGSTON
  
  1945   Mon Nov 13 14:52:29 2023 murtazaSummarySUSTriple Suspension SimulationTriple
Suspension DAMP_OUT Spectrum (Livingston)

tldr:
 DAMP_OUT_Spectra.pdf 
  1946   Mon Nov 13 17:39:12 2023 murtazaSummarySUSTriple Suspension SimulationTriple
Suspension Test Mass Displacement Spectrum (Livingston)

[WIP]
 M1_Disp_ASD.pdf 
  1947   Tue Nov 14 16:14:11 2023 ranaMiscNoise Budgettripleswe only care about PRM, PR2, PR3, BS, SR3,
SR2, SRM, so you should eliminate all other
optics from the plots.
  
  1948   Tue Nov 14 22:18:15 2023 murtazaMiscNoise BudgettriplesThe spectra
for damp out for the following optics
- small triples {PR2, PRM, SR2,
 Small_Triples_DAMP_OUT_Spectra.pdfLarge_Triples_DAMP_OUT_Spectra.pdfBS_DAMP_OUT_Spectra.pdf 
  1949   Wed Nov 15 09:48:05 2023 ranaMiscNoise BudgettriplesCan you explain how you calibrated the
control signals into displacement units?
It would be fine to start if you could just
  
  1950   Thu Nov 16 13:15:06 2023 murtazaMiscNoise BudgettriplesSmall
Triple Suspension Trial Filter Design

tldr:
 L_smallASDnRD1115.pdfL_smallFilter1115.pdfL_smallComBodeOL1115.pdfL_smallBodeOL1115.pdf 
ELOG V3.1.3-