40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  SUS Lab eLog  Not logged in ELOG logo
Entry  Tue Oct 20 20:41:59 2020, Koji, Summary, General, Delivered the instrument / components for 2um ECDL 20201020192651_IMG_0165.JPG
    Reply  Fri Nov 20 18:43:31 2020, Koji, Summary, General, Delivered the instrument / components for 2um ECDL 
Message ID: 1851     Entry time: Tue Oct 20 20:41:59 2020     Reply to this: 1865
Author: Koji 
Type: Summary 
Category: General 
Subject: Delivered the instrument / components for 2um ECDL 

I brought in the instrument and components for 2um ECDL:

1. SAF Gain chip / SAF1900S / Qty2
2. Grating / GR25-0616 / Qty2
3. 3axis piezo mount / POLARIS-K1S3P / Qty2
4. Lens / 390093-D / Qty2
5/6 Thorlabs small components / F3ES20, F3ESN1P / Qty2 ea
7 N/A
8~13 Machines Metal Components / D1900435, D1900429, D1900433, D1900432, D1900430, D1900434 / Qty 2ea
14~17 McMaster Carr fastners / 92196a192, 92196a110, 92196a079, 92196a081 / Qty 100 ea
18 Temp Controller / TED200C / Qty 2 Note One unit temporary used by 2um PD test setup
19 Laser Current Driver / LDC220C / Qty 2
20 Piezo Driver MDT694B / Qty 2

Attachment 1: 20201020192651_IMG_0165.JPG  899 kB  Uploaded Tue Oct 20 21:47:56 2020  | Hide | Hide all
20201020192651_IMG_0165.JPG
ELOG V3.1.3-