40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog, Page 7 of 56  Not logged in ELOG logo
    Reply  Mon Aug 28 17:11:47 2017, awade, Computing, Computing, Mapping the ATF/PSL/TCS lab 
Entry  Tue Aug 29 20:59:11 2017, awade, Jon, Lab Infrastructure, Computing, Setting up a gateway PC 
Entry  Wed Sep 6 11:50:12 2017, Jon, Lab Infrastructure, Computing, Gateway PC set up 
Entry  Wed Sep 6 11:51:40 2017, Jon, Lab Infrastructure, Computing, Gateway PC set up 
Entry  Thu Sep 21 12:25:05 2017, awade, Computing, Computing, Rebuild ws1 in ATF 
Entry  Wed Sep 27 12:41:57 2017, Jon Richardson, Lab Infrastructure, Computing, TCS Subnet Back Up 
Entry  Sun Nov 5 15:12:06 2017, rana, Summary, Computing, diaggui on Mac laptops 
Entry  Sun May 27 16:10:27 2018, awade, Computing, Computing, Accessing 3com switch from screen on mac 
Entry  Tue May 29 16:12:48 2018, awade, Lab Infrastructure, Computing, Upgraded top level QIL/PSL/TCS lab's router IMG_3440.JPG
Entry  Thu Mar 28 18:16:59 2019, Jon, Update, Computing, Cymac assembly started 
    Reply  Mon Apr 1 11:03:24 2019, Jon, Update, Computing, Cymac assembly started 
    Reply  Wed Dec 31 15:59:59 1969, Stephen, DailyProgress, Cryo vacuum chamber, Radiative Cooling of Si Mass, with worse inner shield inner surface emissivity - retry run was successful cooldown_12-21_vs_12-10.pdfMegastat_Heat_Load_Sketch.png12_21_cooldown_fit.png
Entry  Wed Nov 14 16:49:47 2018, Rahul, Update, Cryo vacuum chamber, assembly Bottom_plate.jpgtop_plate.jpg
Entry  Tue Dec 4 15:56:29 2018, Rahul, DailyProgress, Cryo vacuum chamber, O-ring which fits IMG_0170.jpgIMG_0171.jpg
Entry  Wed Dec 5 16:18:50 2018, Rahul, DailyProgress, Cryo vacuum chamber, bottom plate 
Entry  Wed Dec 5 16:49:50 2018, Rahul, DailyProgress, Cryo vacuum chamber, Schematic for the flanges Schematic_chamber.jpg
Entry  Thu Dec 6 12:44:18 2018, Rahul, DailyProgress, Cryo vacuum chamber, Fabricated parts arrived Fabricated_Cold_plate.jpg
Entry  Thu Dec 6 16:49:40 2018, Rahul, DailyProgress, Cryo vacuum chamber, Chamber and bottom plate assembly O-ring_bottom.jpgBottom_collar_assembly.jpg
Entry  Fri Dec 7 16:08:45 2018, Rahul, DailyProgress, Cryo vacuum chamber, Radiation shields  shields_1.jpgshield_2.jpgshields_bottom.jpg
Entry  Tue Dec 11 16:26:07 2018, Rahul, DailyProgress, Cryo vacuum chamber, cleaning of shields and cold plate 
Entry  Wed Dec 12 14:40:17 2018, Rahul, DailyProgress, Cryo vacuum chamber, cleaning of shields and cold plate IMG_0238.jpgIMG_0237.jpg
Entry  Fri Dec 21 15:23:02 2018, Rahul, DailyProgress, Cryo vacuum chamber, Chamber closed for 1st pump down test Picture1.jpgPicture2.jpgPicture3.pngPicture4.jpg
Entry  Fri Dec 21 16:14:42 2018, Rahul, DailyProgress, Cryo vacuum chamber, Pump down results Pressure.jpgPLot1_pressure.png
Entry  Tue Jun 18 00:43:17 2019, Duo, DailyProgress, Cryo vacuum chamber, Chamber Opening image1.jpegimage1.jpeg
Entry  Wed Oct 9 17:40:57 2019, Raymond, Chris, Duo, DailyProgress, Cryo vacuum chamber, Closing the vacuum chamber 
Entry  Thu Oct 10 17:28:33 2019, Raymond, Chris, DailyProgress, Cryo vacuum chamber, Radiation shields unpacked 6x
Entry  Fri Oct 11 17:12:26 2019, Raymond, Chris, DailyProgress, Cryo vacuum chamber, Closing the vacuum chamber IMG_0204.JPG
    Reply  Fri Oct 11 17:33:47 2019, rana, DailyProgress, Cryo vacuum chamber, Closing the vacuum chamber 
Entry  Fri Oct 18 14:44:22 2019, Chris, Lab Infrastructure, Cryo vacuum chamber, 208V electrical service was installed in the QIL 
Entry  Mon Oct 21 17:07:17 2019, Chris, Lab Infrastructure, Cryo vacuum chamber, Cryo chamber vacuum pressure logging vac.png
Entry  Tue Nov 5 20:06:36 2019, Raymond, Update, Cryo vacuum chamber, Cooler to tank connection CoolerCartoon.pdfScreen_Shot_2019-11-05_at_20.25.54.png
Entry  Wed Nov 6 17:05:33 2019, Raymond, DailyProgress, Cryo vacuum chamber, Conflat flange tightening 
Entry  Mon Nov 11 22:19:09 2019, Raymond, DailyProgress, Cryo vacuum chamber, Changes to preserve long strap for internal chamber use ShortAdapter.png
Entry  Tue Nov 12 17:44:39 2019, Raymond, DailyProgress, Cryo vacuum chamber, Tank Update IMG_0258.JPGIMG_0257.JPGIMG_0259.JPG
    Reply  Thu Nov 21 21:58:27 2019, Raymond, DailyProgress, Cryo vacuum chamber, Tank Update IMG_0490.JPGIMG_0491.JPGDiaphragmAdapt.pdf
Entry  Wed Dec 11 15:53:48 2019, Aidan, Chris, Raymond, Howto, Cryo vacuum chamber, Procedure to record photodiode output vs temperature 
    Reply  Wed Dec 11 19:50:25 2019, rana, Howto, Cryo vacuum chamber, Procedure to record photodiode output vs temperature 
Entry  Fri Jul 17 15:54:42 2020, Stephen, Lab Infrastructure, Cryo vacuum chamber,  
    Reply  Fri Jul 24 04:46:51 2020, Stephen, Lab Infrastructure, Cryo vacuum chamber,  
Entry  Fri Jul 24 07:50:00 2020, Raymond, Update, Cryo vacuum chamber, Prototype shield panels MarinerShieldPrototype_parts.jpg
Entry  Tue Aug 4 17:08:00 2020, Raymond, Update, Cryo vacuum chamber, 19 pin MIL feedthrough and CTC100 wiring QIL_TempSensor_MIL19pinWiringDiagram.pdfexternal_tank_RTDs_1.pdfF6D69C6A-7168-4D06-B02A-E83CE8AFE524_1_105_c.jpeg
Entry  Fri Aug 7 11:50:06 2020, Raymond, Update, Cryo vacuum chamber, Tank pumpdown 6A57C6DF-0B58-413E-B9C0-797B14A10CCF_1_105_c.jpeg
Entry  Fri Aug 14 11:17:04 2020, Raymond, Update, Cryo vacuum chamber, Cooler now operational IMG-1190.JPGIMG-1187.JPGIMG-1189.JPG
Entry  Wed Sep 2 08:13:18 2020, Stephen, DailyProgress, Cryo vacuum chamber, Assembly of QIL Setup and other updates from 2020 Sep 01 photos_cit_qil_lab_cryo_shield_test_assembly_20200901.zipT2000538-v1_Part_3_Assembly_of_QIL_Test_Setup_20200901_end_result.jpgIMG_7582.JPG
Entry  Fri Sep 25 14:45:04 2020, Stephen, DailyProgress, Cryo vacuum chamber, Vibration Measurement Equipment and Shield Construction 
Entry  Fri Jan 29 10:14:16 2021, Stephen, DailyProgress, Cryo vacuum chamber, Restarting Cryo vacuum chamber effort CryoLabImages_QILelog2530.zipIMG_8019.JPGIMG_8024.JPGIMG_8020.JPG
Entry  Fri Feb 5 08:50:02 2021, Stephen, DailyProgress, Cryo vacuum chamber, Successful cooldown, cold flange without shields 7x
    Reply  Fri Feb 5 14:13:08 2021, rana, DailyProgress, Cryo vacuum chamber, Successful cooldown in  
Entry  Fri Mar 12 08:31:05 2021, Stephen, Howto, Cryo vacuum chamber, QIL Cryo setup how to videos and photo album 
Entry  Thu Apr 1 18:42:55 2021, Stephen , DailyProgress, Cryo vacuum chamber, Preparations for Q measurements  9x
ELOG V3.1.3-