Tue Mar 21 16:57:44 2023, Yehonathan, shruti, Update, WOPA, LO phase lock loop TF measurement, Offset locking 6x
|
Wed Mar 22 17:54:17 2023, Yehonathan, Update, WOPA, LO phase lock loop TF measurement 7x
|
Thu Mar 23 15:41:49 2023, Yehonathan, Update, WOPA, LO phase noise curves 6x
|
Tue Mar 28 17:53:15 2023, rana, Update, WOPA, LO phase noise curves
|
Mon Mar 20 17:16:50 2023, shruti, DailyProgress, WOPA, Quantum noise locking  
|
Tue Mar 14 17:24:46 2023, shruti, DailyProgress, WOPA, Playing with polarization  
|
Mon Mar 13 15:24:22 2023, Yehonathan, Update, WOPA, Bare fiber mounting and green laser coupling
|
Mon Mar 6 16:22:41 2023, Yehonathan, Update, WOPO, Waveguide input fiber broken 
|
Mon Mar 13 09:22:43 2023, Yehonathan, Update, WOPA, Waveguide input fiber cleaved! 
|
Thu Mar 9 11:43:28 2023, shruti, Update, WOPA, Plan to couple directly into the waveguide from free space 
|
Mon Mar 6 14:45:41 2023, Yehonathan, Update, WOPA, Shopping list
|
Wed Feb 15 11:53:00 2023, Yehonathan, Update, WOPA, Green fiber mating is bad  
|
Thu Feb 16 11:26:41 2023, shruti, Update, WOPA, Green fiber mating is a little less bad, connected WG directly to fiber coupler
|
Wed Feb 22 12:23:32 2023, shruti, Update, WOPA, Attempts at improving the pumping 
|
Wed Mar 1 17:22:47 2023, shruti, Update, WOPA, Attempts at improving the pumping: WIP 
|
Mon Feb 13 14:22:11 2023, Yehonathan, Update, WOPA, Squeezing arcs measurements  
|
Mon Feb 27 20:20:57 2023, shruti, Update, WOPA, Squeezing measurements    
|
Fri Feb 24 13:58:14 2023, Radhika, DailyProgress, Emissivity estimation, 40um alumina strip cooldown   
|
Thu Feb 9 09:41:17 2023, Radhika, DailyProgress, General, Preparing north optical table for lowering 11x
|
Thu Feb 9 10:27:11 2023, Radhika, DailyProgress, General, Preparing north optical table for lowering
|
Fri Feb 10 11:09:14 2023, Radhika, DailyProgress, General, Moving Megastat back to north table  
|
Wed Feb 15 09:03:43 2023, Aidan, DailyProgress, General, Securing table to legs 
|
Tue Feb 14 19:25:59 2023, Radhika, DailyProgress, Emissivity estimation, Megastat post-transfer update; cooldown of epoxy-only Si wafer   
|
Thu Feb 9 15:14:23 2023, Yehonathan, Update, WOPA, Setting up noise RMS measurement.   
|
Mon Feb 13 11:40:41 2023, Yehonathan, Update, WOPA, Setting up noise RMS measurement.
|
Mon Feb 13 14:07:37 2023, rana, Update, WOPA, saturation in 1811 RFPD?
|
Tue Jan 31 18:10:38 2023, shruti, DailyProgress, WOPA, restarting WOPA 
|
Wed Feb 1 16:56:14 2023, shruti, DailyProgress, WOPA, shot noise measurement   
|
Tue Feb 7 11:57:19 2023, shruti, DailyProgress, WOPA, shot noise measurement 
|
Mon Feb 6 16:44:12 2023, Yehonathan, DailyProgress, WOPA, SHG measurement
|
Fri Feb 3 14:49:43 2023, shruti, DailyProgress, WOPA, Fans of the FIR Filter Box  
|
Sun Feb 5 18:05:24 2023, rana, DailyProgress, WOPA, Fans of the FIR Filter Box
|
Mon Feb 6 08:45:21 2023, shruti, DailyProgress, WOPA, Fans of the FIR Filter Box
|
Fri Feb 3 11:52:03 2023, Radhika, DailyProgress, Emissivity estimation, 40m alumina strip cooldown 6x
|
Thu Feb 2 10:55:22 2023, JC, DailyProgress, WOPA, Beam Splitter Loss    
|
Fri Jan 13 18:00:56 2023, Radhika, DailyProgress, Emissivity estimation, Bonding alumina to Si wafer with silver epoxy
|
Fri Jan 20 13:46:31 2023, Radhika, DailyProgress, Emissivity estimation, Bonding alumina to Si wafer with silver epoxy
|
Mon Jan 23 13:59:20 2023, Radhika, DailyProgress, Emissivity estimation, Bonding alumina to Si wafer with silver epoxy    
|
Thu Jan 19 13:27:40 2023, Radhika, DailyProgress, Emissivity estimation, Alumina epoxy cooldown 6x
|
Thu Jan 12 11:50:20 2023, Koji, Howto, General, How to move the large engine hoist through the narrow door
|
Thu Jan 5 19:12:32 2023, Radhika, DailyProgress, Cryo vacuum chamber, No QIL flooding; power outage effects
|
Fri Jan 6 00:41:16 2023, rana, Safety, Cryo vacuum chamber, No QIL flooding; power outage effects
|
Fri Jan 6 16:44:02 2023, Radhika, DailyProgress, Cryo vacuum chamber, Alumina strip cooldown  
|
Tue Jan 10 13:39:11 2023, Radhika, DailyProgress, Cryo vacuum chamber, Alumina strip cooldown
|
Tue Jan 10 10:27:16 2023, Aidan, Lab Infrastructure, Cleanliness, Water and ANTS!  
|
Mon Nov 7 15:20:30 2022, Radhika, Safety, Lab Monitoring, Minor flooding 11/7  
|
Thu Nov 10 09:29:30 2022, JC, Safety, Lab Monitoring, Minor flooding 11/7
|
Mon Dec 12 10:23:58 2022, JC, Safety, Lab Monitoring, Minor flooding 11/7
|
Fri Jan 6 16:34:29 2023, Radhika, Safety, Lab Monitoring, Minor flooding 11/7
|
Fri Dec 9 21:41:11 2022, Radhika, DailyProgress, Emissivity estimation, 12/9 alumina strip cooldown 6x
|
Wed Dec 14 13:45:11 2022, Radhika, DailyProgress, Emissivity estimation, 12/9 alumina strip cooldown
|
Wed Dec 14 17:02:24 2022, Chris, Computing, CDS, fb4 fixed
|
Wed Dec 14 17:11:13 2022, Radhika, Computing, CDS, fb4 fixed
|
Thu Dec 8 15:24:10 2022, Radhika, Misc, Emissivity testing, High emissivity spray coating
|
Mon Dec 5 12:49:44 2022, aaron, Misc, Equipment transfer, vacuum gauge to cryo lab   
|
Wed Oct 19 18:46:49 2022, Radhika, DailyProgress, Emissivity estimation, Alumina samples 6x
|
Fri Nov 4 18:08:27 2022, Radhika, DailyProgress, Emissivity estimation, Alumina samples 
|
Tue Nov 22 13:33:05 2022, Radhika, DailyProgress, Emissivity estimation, Alumina samples
|
Sun Nov 27 15:13:42 2022, rana, DailyProgress, Emissivity estimation, Alumina samples
|
Wed Nov 30 11:14:28 2022, Radhika, DailyProgress, Emissivity estimation, Al2O3 strip cooldown + bonding  
|
Wed Nov 30 14:23:11 2022, Radhika, DailyProgress, Emissivity estimation, Al2O3 strip cooldown + bonding  
|
Fri Oct 28 17:03:27 2022, Radhika, DailyProgress, Cryo vacuum chamber, Megastat upgrade
|
Mon Nov 7 14:36:19 2022, Radhika, DailyProgress, Cryo vacuum chamber, Megastat upgrade
|
Fri Jul 29 14:27:43 2022, Stephen, DailyProgress, Cryo vacuum chamber, Progress - Heaters, RTDs, Maglite
|
Tue Aug 2 11:37:19 2022, Radhika, DailyProgress, Cryo vacuum chamber, Progress - Heaters, RTDs, Maglite
|
Fri Sep 9 12:10:29 2022, Radhika, DailyProgress, Cryo vacuum chamber, Progress - Heaters, RTDs, Maglite
|
Fri Sep 16 16:29:28 2022, Radhika, DailyProgress, Cryo vacuum chamber, Progress - Heaters, RTDs, Maglite 
|
Thu Jun 2 10:28:26 2022, Yehonathan, Update, WOPO, Installing 1811 PDs
|
Wed Jul 20 15:55:41 2022, Yehonathan, Update, WOPO, Installing 1811 PDs
|
Tue Aug 23 22:23:06 2022, awade, Update, WOPO, Installing 1811 PDs
|
Thu Aug 4 10:16:04 2022, Radhika, DailyProgress, Emissivity estimation, Megastat RTD calibration
|
Mon Jul 18 11:02:50 2022, Radhika, DailyProgress, Emissivity estimation, Plan for this week
|
Thu Jul 14 18:15:41 2022, Radhika, DailyProgress, Emissivity estimation, Undoped Si wafer cooldown in Megastat    
|
Tue Jul 5 11:58:01 2022, Radhika, DailyProgress, Emissivity estimation, Glass wafer cooldown with ceramic ball bearings 6x
|
Tue Jul 5 17:40:14 2022, Radhika, DailyProgress, Emissivity estimation, Glass wafer cooldown with ceramic ball bearings
|
Wed Jun 29 09:39:01 2022, Clare Nelle, DailyProgress, Emissivity testing, RTD Calibration Day 2
|
Fri Apr 8 14:28:05 2022, Radhika, DailyProgress, Emissivity estimation, Si wafer emissivity testing 
|
Mon Apr 11 14:50:45 2022, rana, DailyProgress, Cryo vacuum chamber, Si wafer emissivity testing
|
Fri May 27 13:30:21 2022, Radhika, DailyProgress, Emissivity estimation, Si wafer emissivity testing
|
Tue May 31 17:53:07 2022, rana, DailyProgress, Emissivity estimation, Si wafer emissivity testing
|
Thu Jun 23 11:56:21 2022, JC, Electronics, General, Equipment
|
Tue Jun 21 11:00:57 2022, Radhika, DailyProgress, Emissivity estimation, Thermal conduction through ceramic ball bearings  
|
Tue Jun 21 10:35:15 2022, Clare Nelle, DailyProgress, Emissivity estimation, RTD Calibration
|
Mon Jun 6 09:45:58 2022, Radhika, DailyProgress, Emissivity estimation, Megastat cooldown - repainted inner shield aquadag, added aquadag foil to cold plate 6x
|
Wed Jun 8 12:15:06 2022, Radhika, DailyProgress, Emissivity estimation, Megastat cooldown - repainted inner shield aquadag, added aquadag foil to cold plate
|
Thu Jun 9 10:42:26 2022, Radhika, DailyProgress, Emissivity estimation, Megastat cooldown - repainted inner shield aquadag, added aquadag foil to cold plate
|
Fri Jun 10 09:47:07 2022, Radhika, DailyProgress, Emissivity estimation, Megastat cooldown - repainted inner shield aquadag, added aquadag foil to cold plate
|
Fri Jun 10 16:23:04 2022, rana, DailyProgress, Emissivity estimation, Megastat cooldown - repainted inner shield aquadag, added aquadag foil to cold plate
|
Thu Jun 9 10:27:01 2022, Radhika, DailyProgress, 2um Photodiodes, PD testing plan in CAML lab
|
Tue Jun 7 11:50:09 2022, Radhika, DailyProgress, Emissivity estimation, Fastest cooldown + power budgets for 2" Si wafer cooldown in Megastat 
|
Mon Jun 6 14:05:08 2022, Aidan, Electronics, Purchases, Return me to WB265B: Location of Thorlabs S130C (silicon photodiode 5mW/500mW settings)  
|
Wed May 25 14:32:12 2022, Radhika, Summary, Emissivity estimation, List of Megastat upgrades for emissivity estimation
|
Thu May 26 13:12:25 2022, Radhika, Summary, Emissivity estimation, List of Megastat upgrades for emissivity estimation
|
Fri May 27 17:33:24 2022, Radhika, Summary, Emissivity estimation, List of Megastat upgrades for emissivity estimation   
|
Wed May 18 09:42:34 2022, Radhika, DailyProgress, Emissivity estimation, Megastat Inner Shield for emissivity estimation 9x
|
Wed May 18 21:53:31 2022, rana, DailyProgress, Emissivity estimation, Megastat Inner Shield for emissivity estimation
|
Fri May 20 11:08:16 2022, Radhika, DailyProgress, Emissivity estimation, Megastat Inner Shield for emissivity estimation
|
Mon Apr 18 12:02:36 2022, Radhika, DailyProgress, Emissivity estimation, Plan towards MCMC emissivity estimation
|
Fri Apr 22 13:58:09 2022, Radhika, DailyProgress, Emissivity estimation, Plan towards MCMC emissivity estimation 
|
Fri May 13 09:12:14 2022, Radhika, DailyProgress, Emissivity estimation, Plan towards MCMC emissivity estimation   
|
Tue May 10 14:27:26 2022, Aidan, Lab Infrastructure, Cleanliness, Ceiling tile replacement - Day 1
|
Wed May 11 15:53:06 2022, Aidan, Lab Infrastructure, Cleanliness, Ceiling tile replacement - Day 2  
|
Fri Apr 8 16:25:54 2022, Stephen, DailyProgress, 2um Photodiodes, Recovery of IR Labs dewar WIP
|
Wed Apr 20 00:12:12 2022, Yehonathan, Update, WOPO, Still figuring out the readout electronics and fixing of some stuff   
|
Thu Apr 21 10:33:33 2022, shruti, Update, WOPO, Still figuring out the readout electronics and fixing of some stuff
|
Mon Apr 25 11:08:35 2022, Yehonathan, Update, WOPO, Still figuring out the readout electronics and fixing of some stuff
|
Thu Apr 28 14:12:20 2022, Yehonathan, Update, WOPO, Still figuring out the readout electronics and fixing of some stuff  
|
Thu Apr 28 11:39:24 2022, JC, Electronics, General, Network
|
Wed Apr 20 00:00:39 2022, Yehonathan, Lab Infrastructure, General, Preparing for planned power outage
|
Fri Apr 15 13:30:41 2022, Radhika, DailyProgress, CDS, CTC100 for Megastat not responding to Telnet
|
Fri Apr 8 17:34:10 2022, Stephen, DailyProgress, Cryo vacuum chamber, Cooldown started, two copper bars; manual logging.
|
Fri Apr 15 11:44:41 2022, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown started, two copper bars; manual logging.
|
Tue Apr 5 16:47:46 2022, Radhika, DailyProgress, , Rerun of cooldown with indium gaskets in copper bar joints 9x
|
Wed Apr 6 10:31:55 2022, rana, DailyProgress, , Rerun of cooldown with indium gaskets in copper bar joints
|
Tue Apr 5 11:15:13 2022, Radhika, Things to Buy, Purchases, New optical table legs for north table
|
Tue Apr 5 12:20:09 2022, rana, Things to Buy, Purchases, New optical table legs for north table
|
Tue Apr 5 16:41:17 2022, Radhika, Things to Buy, Purchases, New optical table legs for north table
|
Mon Mar 28 14:29:22 2022, shruti, Safety, Cleanliness, Lab flooding
|
Mon Mar 28 16:09:57 2022, Aidan, Safety, Cleanliness, Lab flooding
|
Mon Mar 28 18:00:43 2022, Koji, Safety, Cleanliness, Lab flooding
|
Tue Mar 29 09:13:20 2022, Aidan, Safety, Cleanliness, Lab flooding    
|
Wed Mar 30 10:46:49 2022, Radhika, Safety, Cleanliness, Lab flooding    
|
Wed Mar 30 16:25:06 2022, Koji, Safety, Cleanliness, Lab flooding
|
Fri Apr 1 13:53:02 2022, Radhika, Safety, Cleanliness, Lab flooding
|
Mon Apr 4 17:05:20 2022, Radhika, Safety, Cleanliness, Lab flooding  
|
Sat Mar 26 12:49:18 2022, Stephen, DailyProgress, Cryo vacuum chamber, Warmup started, issue with steady state heating
|
Fri Mar 18 19:34:35 2022, Radhika, DailyProgress, Cryo vacuum chamber, Megastat cooldown 3/18 - adding indium gaskets to copper bar joints 8x
|
Thu Mar 24 16:08:35 2022, Radhika, DailyProgress, Cryo vacuum chamber, Megastat cooldown 3/18 - adding indium gaskets to copper bar joints
|
Tue Feb 22 07:53:06 2022, Yehonathan, Update, WOPO, Waking up WOPO
|
Fri Feb 25 17:09:53 2022, shruti, Update, WOPO, Waking up WOPO - green beam
|
Wed Mar 2 14:38:55 2022, Yehonathan, Update, WOPO, Waking up WOPO - some more fiddling and a plan
|
Fri Mar 4 11:49:45 2022, shruti, Update, WOPO, Waking up WOPO - attempts at readout
|
Thu Mar 10 17:12:01 2022, awade, Update, WOPO, Waking up WOPO - attempts at readout
|
Wed Mar 16 12:22:44 2022, Yehonathan, Update, WOPO, Waking up WOPO - attempts at readout  
|
Tue Mar 22 09:19:38 2022, shruti, Update, WOPO, Waking up WOPO - back to green path 
|
Thu Mar 10 16:21:11 2022, Radhika, DailyProgress, Cryo vacuum chamber, Insulated outer shield cooldown started 3/10 9x
|
Mon Mar 14 14:04:54 2022, Radhika, DailyProgress, Cryo vacuum chamber, Insulated outer shield cooldown started 3/10
|
Thu Feb 24 10:44:06 2022, Radhika, DailyProgress, Cryo vacuum chamber, Double copper bar cooldown rerun started 02/23    
|
Tue Mar 1 15:59:34 2022, Radhika, DailyProgress, Cryo vacuum chamber, Double copper bar cooldown rerun started 02/23
|
Fri Mar 4 13:18:09 2022, Radhika, DailyProgress, Cryo vacuum chamber, Double copper bar cooldown rerun started 02/23  
|
Mon Feb 7 11:57:38 2022, Stephen, DailyProgress, Cryo vacuum chamber, Doubled Thermal Linkage Capacity run started 11 Feb 2022
|
Tue Feb 15 11:59:22 2022, Radhika, DailyProgress, Cryo vacuum chamber, Doubled Thermal Linkage Capacity run started 11 Feb 2022 
|
Tue Feb 15 16:54:27 2022, rana, DailyProgress, Cryo vacuum chamber, Doubled Thermal Linkage Capacity run started 11 Feb 2022
|
Wed Feb 16 11:35:18 2022, Stephen, DailyProgress, Cryo vacuum chamber, Doubled Thermal Linkage Capacity run started 11 Feb 2022
|
Mon Jan 31 15:40:21 2022, Stephen, DailyProgress, , 31 Jan Fastest Radiative Cooling run started
|
Fri Feb 4 14:00:19 2022, Radhika, DailyProgress, , 31 Jan Fastest Radiative Cooling run started   
|
Wed Feb 9 15:21:27 2022, rana, Howto, TempCtrl, plots
|
Mon Feb 7 16:06:36 2022, Stephen, DailyProgress, , 31 Jan Fastest Radiative Cooling run, ended 07 Jan
|
Fri Jan 21 13:28:48 2022, Radhika, DailyProgress, Cryo vacuum chamber, Heat transfer between grease joints and pressure joints
|
Fri Jan 21 17:32:40 2022, rana, DailyProgress, Cryo vacuum chamber, Heat transfer between grease joints and pressure joints
|
Tue Jan 25 10:24:14 2022, rana, DailyProgress, Cryo vacuum chamber, Heat transfer between grease joints and pressure joints
|
Tue Jan 25 13:15:40 2022, rana, DailyProgress, Cryo vacuum chamber, Heat transfer between grease joints and pressure joints
|
Tue Jan 25 14:01:27 2022, Stephen, DailyProgress, Cryo vacuum chamber, Heat transfer between grease joints and pressure joints
|
Fri Jan 28 10:31:15 2022, rana, Summary, Tutorial video, oh no, stap the units madness, aaaaahhhh!!! noooooo!!!!
|
Fri Jan 7 14:54:58 2022, Stephen, DailyProgress, Cryo vacuum chamber, Fastest Radiative Cooling run started 14 Jan
|
Tue Jan 18 16:11:35 2022, Stephen, DailyProgress, Cryo vacuum chamber, Status of Fastest Radiative Cooling run started 14 Jan 
|
Mon Jan 10 16:46:19 2022, Paco, Misc, Equipment transfer, 2 inch GYRO optics
|
Fri Nov 12 14:31:38 2021, Stephen, Radhika, DailyProgress, Cryo vacuum chamber, Radiative Cooling of Si Mass, with better shield emissivity    
|
Fri Nov 19 14:01:40 2021, Stephen, Radhika, DailyProgress, Cryo vacuum chamber, Radiative Cooling of Si Mass, with better shield emissivity
|
Fri Dec 10 15:58:57 2021, Stephen, DailyProgress, Cryo vacuum chamber, Radiative Cooling of Si Mass, with worse inner shield inner surface emissivity
|
Thu Dec 16 15:54:44 2021, Stephen, Radhika, DailyProgress, Cryo vacuum chamber, Radiative Cooling of Si Mass, with worse inner shield inner surface emissivity - CTC100 temperature control success 
|
Tue Dec 21 15:33:39 2021, Stephen, DailyProgress, Cryo vacuum chamber, Radiative Cooling of Si Mass, with worse inner shield inner surface emissivity - next run repeating
|
Wed Dec 31 15:59:59 1969, Stephen, DailyProgress, Cryo vacuum chamber, Radiative Cooling of Si Mass, with worse inner shield inner surface emissivity - retry run was successful  
|
Thu Dec 16 17:57:15 2021, Radhika, Stephen, Summary, Cryo vacuum chamber, Megastat geometric parameters
|
Fri Dec 3 09:31:40 2021, Radhika, DailyProgress, Cryo vacuum chamber, Transitioning MS cooldown fitting to MCMC scheme 
|
Sun Dec 5 17:33:50 2021, rana, DailyProgress, Cryo vacuum chamber, Transitioning MS cooldown fitting to MCMC scheme
|
Fri Nov 19 09:36:52 2021, Anchal, Misc, Equipment transfer, Borrowing two 2" optics
|
Fri Nov 12 14:21:32 2021, Stephen, Radhika, DailyProgress, Cryo vacuum chamber, Upgrade to Rigid Copper Bar, and assorted transitions from PD testing 10x
|
Fri Nov 12 08:21:22 2021, Aidan, Summary, 2um Photodiodes, Results from JPL PD: A1-Test3  
|
Fri Nov 12 10:54:55 2021, rana, Summary, 2um Photodiodes, Results from JPL PD: A1-Test3
|
Wed Oct 27 10:18:33 2021, Aidan, Stephen, Summary, Cryo vacuum chamber, Inspection of Megastat post 408K event and pumping timeline 8x
|
Mon Oct 25 16:13:47 2021, Aidan, Update, Cryo vacuum chamber, Heater left on - chamber got warm
|
Tue Oct 26 07:32:52 2021, Aidan, Update, Cryo vacuum chamber, Heater left on - chamber got warm
|
Tue Oct 26 08:43:38 2021, Aidan, Update, Cryo vacuum chamber, CTC100 temperature alarm and heater shutoff   
|
Mon Oct 25 16:10:51 2021, Aidan, Update, CDS, Restarted computers and front-end model following campus power outage
|
Thu Oct 21 15:32:32 2021, Aidan, Radhika, Laser, 2um Photodiodes, Improved measurement of QE on photodiodes ~89% at 140K
|
Thu Oct 21 16:52:26 2021, rana, Laser, 2um Photodiodes, Improved measurement of QE on photodiodes ~89% at 140K
|
Thu Oct 21 17:48:33 2021, Aidan, Laser, 2um Photodiodes, Improved measurement of QE on photodiodes ~89% at 140K
|
Fri Oct 22 09:20:13 2021, Aidan, Laser, 2um Photodiodes, Improved measurement of QE on photodiodes ~89% at 140K
|
Fri Oct 22 12:04:13 2021, rana, Laser, 2um Photodiodes, Improved measurement of QE on photodiodes ~89% at 140K
|
Fri Oct 22 13:31:36 2021, Chris, Laser, 2um Photodiodes, Improved measurement of QE on photodiodes ~89% at 140K
|
Sun Oct 3 08:22:49 2021, Aidan, Summary, 2micronLasers, Starting data taking and second test of JPL PD A1
|
Wed Oct 6 13:50:18 2021, Aidan, Summary, 2micronLasers, Starting data taking and second test of JPL PD A1
|
Thu Oct 7 08:07:03 2021, Aidan, Summary, 2micronLasers, Starting data taking and second test of JPL PD A1
|
Mon Oct 11 08:35:21 2021, Aidan, Summary, 2micronLasers, Starting data taking and second test of JPL PD A1
|
Mon Oct 18 15:25:14 2021, Aidan, Summary, 2micronLasers, Starting data taking and second test of JPL PD A1
|
Sat Oct 2 23:57:50 2021, Stephen, DailyProgress, Cryo vacuum chamber, Chamber pumping down, carbon paint flakes cleaned up
|
Fri Oct 1 17:41:25 2021, Paco, Misc, Equipment transfer, Fiber alignment pen
|
Tue Sep 28 08:23:11 2021, Aidan, Update, 2um Photodiodes, Distances between optics, collimating lens, focussing lens and photodiode 
|
Wed Sep 22 16:40:19 2021, Aidan, Laser, 2um Photodiodes, Beam size measurements of the 2um beam on the PD 
|
Thu Sep 16 10:33:59 2021, Aidan, Computing, 2um Photodiodes, Automation and analysis scripts for 2um data taking  
|
Mon Sep 20 14:26:38 2021, rana, Computing, 2um Photodiodes, Automation and analysis scripts for 2um data taking
|
Wed Sep 15 08:33:39 2021, Aidan, Update, 2um Photodiodes, Video review of 2um testing setup post A1 testing
|
Tue Sep 14 15:17:03 2021, Stephen, DailyProgress, Cryo vacuum chamber, Chamber up to air, lids removed
|
Wed Sep 15 08:22:32 2021, Aidan, DailyProgress, Cryo vacuum chamber, CONTAMINATION: Black paint flecks throughout chamber   
|
Tue Sep 14 15:58:51 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cold plate cooling limited by copper braid
|
Wed Sep 8 14:35:22 2021, Aidan, DailyProgress, 2um Photodiodes, Running automated testing suite on A1 PD 7x
|
Thu Sep 9 09:23:56 2021, Aidan, DailyProgress, 2um Photodiodes, Running automated testing suite on A1 PD
|
Fri Sep 10 09:11:05 2021, Aidan, DailyProgress, 2um Photodiodes, Running automated testing suite on A1 PD
|
Fri Sep 10 20:13:12 2021, Aidan, DailyProgress, 2um Photodiodes, Running automated testing suite on A1 PD
|
Tue Sep 7 08:12:50 2021, Aidan, Computing, Cymacs, +/-18V power supply to AI/AA chassis was actually +18V, -14.5V 
|
Tue Sep 7 11:52:40 2021, rana, Computing, Cymacs, +/-18V power supply to AI/AA chassis was actually +18V, -14.5V
|
Tue Sep 7 09:14:22 2021, shruti, Misc, Equipment transfer, TED200C borrowed
|
Thu Aug 5 09:20:44 2021, Aidan, Laser, 2um Photodiodes, Optical design for 2um PD in new cryo chamber
|
Thu Aug 5 12:39:56 2021, Aidan, Laser, 2um Photodiodes, Optical design for 2um PD in new cryo chamber
|
Thu Aug 5 14:29:42 2021, Stephen, Laser, 2um Photodiodes, Optical design for 2um PD in new cryo chamber   
|
Tue Aug 24 15:01:25 2021, Stephen, Laser, 2um Photodiodes, 2um PD in new cryo chamber
|
Thu Aug 26 14:31:46 2021, Aidan, Stephen, Laser, 2um Photodiodes, Incident power calibration of 2um PD in new cryo chamber 
|
Fri Aug 27 17:57:30 2021, Stephen, DailyProgress, 2um Photodiodes, Start of PD pumpdown
|
Sat Aug 28 07:01:21 2021, Aidan, DailyProgress, 2um Photodiodes, Start of PD pumpdown 
|
Sun Aug 29 11:17:43 2021, Aidan, DailyProgress, 2um Photodiodes, Start of PD pumpdown 
|
Mon Aug 30 08:04:52 2021, Aidan, DailyProgress, 2um Photodiodes, Monday morning observation of JPL A1 PD cool down
|
Fri Aug 27 15:33:28 2021, Aidan, Computing, Cymacs,
|
Thu Aug 26 16:10:16 2021, Aidan, Lab Infrastructure, Cleanliness, Two under table equipment racks purchased for North Table - one installed so far   
|
Thu Aug 5 11:53:26 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown model fitting for MS
|
Wed Aug 11 14:58:47 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown model fitting for MS 
|
Wed Aug 11 18:00:19 2021, Koji, DailyProgress, Cryo vacuum chamber, Cooldown model fitting for MS
|
Fri Aug 13 15:14:14 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown model fitting for MS
|
Fri Aug 13 21:01:42 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown model fitting for MS
|
Thu Aug 19 14:34:10 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown model fitting for MS 
|
Fri Aug 20 13:44:58 2021, rana, DailyProgress, Cryo vacuum chamber, Cooldown model fitting for MS
|
Fri Aug 20 14:05:45 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown model fitting for MS
|
Wed Aug 18 13:06:03 2021, Aidan, Stephen, Lab Infrastructure, Cleanliness, North table clean-up 
|
Sun Aug 15 00:33:15 2021, Koji, Summary, Cryo vacuum chamber, Aquadag painting on the inner shield  
|
Wed Jul 21 13:14:11 2021, Paco, Lab Infrastructure, 2micronLasers, Brimrose AOM and amplifier
|
Fri Aug 6 16:15:03 2021, Paco, Lab Infrastructure, 2micronLasers, Brimrose AOM and amplifier
|
Wed Aug 4 18:55:58 2021, aaron, DailyProgress, Cryo vacuum chamber, loading cantilevers into megastat 6x
|
Thu Aug 5 14:12:36 2021, Stephen, DailyProgress, Cryo vacuum chamber, loading cantilevers into megastat (and actions toward pumping down)
|
Mon Jul 26 01:30:42 2021, Koji, Summary, Cryo vacuum chamber, Prep for the 2nd cooling of the suspension
|
Mon Jul 26 22:49:00 2021, Koji, Summary, Cryo vacuum chamber, Aquadag painting 10x
|
Wed Jul 28 00:59:47 2021, Koji, Summary, Cryo vacuum chamber, The test mass successfully suspended   
|
Thu Jul 29 00:42:38 2021, Koji, Summary, Cryo vacuum chamber, The test mass successfully suspended
|
Thu Jul 29 13:11:17 2021, Koji, Summary, Cryo vacuum chamber, Cooling progress: Update   
|
Fri Jul 30 12:22:56 2021, Koji, Summary, Cryo vacuum chamber, Cooling curve comparisons  
|
Sun Aug 1 22:22:00 2021, Koji, Summary, Cryo vacuum chamber, Cooling update   
|
Mon Aug 2 13:25:32 2021, Stephen, DailyProgress, Cryo vacuum chamber, Warmup started 02 August
|
Tue Aug 3 23:56:00 2021, Koji, DailyProgress, Cryo vacuum chamber, Warmup started 02 August 
|
Fri Jul 30 12:22:15 2021, Radhika, DailyProgress, CDS, Connecting CTC100 to EPICS/rtcds system
|
Fri Jul 30 17:28:14 2021, Radhika, DailyProgress, CDS, Connecting CTC100 to EPICS/rtcds system
|
Fri Jul 30 18:18:21 2021, Koji, DailyProgress, CDS, Connecting CTC100 to EPICS/rtcds system
|
Mon Aug 2 17:24:20 2021, Radhika, DailyProgress, CDS, Connecting CTC100 to EPICS/rtcds system
|
Mon Aug 2 21:51:37 2021, Koji, DailyProgress, CDS, Connecting CTC100 to EPICS/rtcds system
|
Fri Jul 30 14:44:56 2021, Stephen, Things to Buy, Cryo vacuum chamber, Upgrades and updates in advance of PD testing
|
Fri Jul 30 09:48:11 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooling model updates from Koji's analysis  
|
Fri Jul 16 23:28:24 2021, Koji, Summary, Cryo vacuum chamber, Sus Test Work 07/16/2021 7x
|
Sat Jul 17 00:55:41 2021, Koji, Summary, Cryo vacuum chamber, Temp Log 210716_2255
|
Mon Jul 19 15:57:17 2021, Stephen, Summary, Cryo vacuum chamber, Temp Log 210716_2255
|
Mon Jul 19 17:21:19 2021, Koji, Summary, Cryo vacuum chamber, Temp Log 210716_2255
|
Tue Jul 20 11:33:52 2021, Koji, Summary, Cryo vacuum chamber, A cooling model (Temp Log 210716_2255)  
|
Tue Jul 20 17:28:30 2021, Koji, Summary, Cryo vacuum chamber, A cooling model (Temp Log 210716_2255)
|
Wed Jul 21 21:05:59 2021, Koji, Summary, Cryo vacuum chamber, Test mass cooling (2021/07/16 ~ 2021/07/21)   
|
Thu Jul 22 22:03:45 2021, Koji, Summary, Cryo vacuum chamber, Test mass heating in progress (2021/07/21 ~ 2021/07/23) 
|
Sun Jul 25 21:45:46 2021, Koji, Summary, Cryo vacuum chamber, About the radiation heat transfer model
|
Wed Jul 21 14:53:28 2021, Koji, Summary, General, Jul 17, 2021: Canon camera / small silver tripod / macro zoom lens / LED ring light borrowed -> QIL
|
Fri Jul 23 20:53:40 2021, Koji, Summary, General, Jul 17, 2021: Canon camera / small silver tripod / macro zoom lens / LED ring light returned / ELectronics borrowed
|
Thu Jul 15 23:37:53 2021, Koji, Summary, Cryo vacuum chamber, Bonding work for the prep of the preliminary suspension test  
|
Thu Jul 15 23:34:17 2021, Koji, Summary, TempCtrl, Temprerature Log for cooling down / warming up 
|
Mon Jul 12 14:42:42 2021, Stephen, DailyProgress, Cryo vacuum chamber, RTD attached to coldhead with spring clamp, Si mass to be installed this week
|
Fri Jul 9 13:44:39 2021, Radhika, Summary, Cryo vacuum chamber, 1D cooling model updates  
|
Fri Jul 9 10:57:58 2021, Radhika, Summary, Cryo vacuum chamber, CTC100 temperature extraction
|
Tue Jul 6 18:07:20 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown 7/1-7/6
|
Fri Jul 2 11:27:01 2021, Radhika, DailyProgress, Cryo vacuum chamber, Ccooling updates 6/29-7/2 16x
|
Tue Jun 29 17:29:16 2021, Stephen, Things to Buy, 2um Photodiodes, Integrating 2um PD measurements into Cryo Vacuum Chamber
|
Tue Jun 29 17:16:29 2021, Ian MacMillan, DailyProgress, Cryo vacuum chamber, Temp Controller
|
Wed Jun 23 16:25:49 2021, Ian MacMillan, DailyProgress, General, Network Issue
|
Tue Jun 29 15:45:43 2021, Ian MacMillan, DailyProgress, General, Network Issue
|
Fri Jun 25 09:47:33 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown data 
|
Wed Jun 23 15:03:12 2021, Ian MacMillan, DailyProgress, CDS, Testing DAC2ADC code
|
Mon Jun 21 10:59:41 2021, Radhika, DailyProgress, Cryo vacuum chamber, Chamber updates 6/16-6/18 10x
|
Fri Jun 18 10:15:14 2021, Stephen, Update, Cryo vacuum chamber, Temperature sensor considerations
|
Wed Jun 16 17:17:12 2021, Koji, Update, General, I2 cell  
|
Wed May 12 15:43:30 2021, Aidan, Summary, 2um Photodiodes, Chamber is leaking
|
Wed May 26 18:38:25 2021, Aidan, Summary, 2um Photodiodes, Chamber is leaking
|
Fri Jun 11 07:42:54 2021, Stephen, Summary, 2um Photodiodes, Chamber is leaking 
|
Fri Jun 11 16:48:31 2021, Aidan, Stephen, Summary, 2um Photodiodes, Chamber is leaking 
|
Fri Jun 11 16:00:31 2021, Radhika, DailyProgress, Cryo vacuum chamber, Large chamber heating 
|
Thu Jun 10 15:13:26 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown modeling vs. data 
|
Wed Jun 9 13:35:07 2021, Radhika, DailyProgress, Cryo vacuum chamber, Heater actuation
|
Tue Jun 8 12:58:40 2021, Stephen, DailyProgress, Cryo vacuum chamber, Maximum power for temperature actuation 
|
Fri Jun 4 16:15:00 2021, Radhika, DailyProgress, Cryo vacuum chamber, Cooldown from 6/2-6/4
|
Mon May 24 15:47:30 2021, Radhika, DailyProgress, Cryo vacuum chamber, Weekend cryo chamber cooling
|
Mon May 24 16:49:17 2021, rana, DailyProgress, Cryo vacuum chamber, Weekend cryo chamber cooling
|
Tue May 25 13:19:41 2021, Radhika, DailyProgress, Cryo vacuum chamber, Weekend cryo chamber cooling
|
Tue May 25 16:38:17 2021, Stephen, DailyProgress, Cryo vacuum chamber, Weekend cryo chamber cooling --> started warmup
|
Thu May 27 16:48:35 2021, Radhika, DailyProgress, Cryo vacuum chamber, Weekend cryo chamber cooling --> started warmup 7x
|
Mon May 31 11:38:13 2021, Radhika, DailyProgress, Cryo vacuum chamber, Weekend cryo chamber cooling 14x
|
Wed Jun 2 20:06:07 2021, rana, DailyProgress, Cryo vacuum chamber, Weekend cryo chamber cooling
|
Fri May 21 11:15:12 2021, Stephen, DailyProgress, Cryo vacuum chamber, Troubleshooting cryocooler - power cable not plugged in 
|
Thu May 20 16:57:32 2021, Koji, Electronics, General, Keithley Source Meter returned to Downs  
|
Wed May 19 08:40:47 2021, Stephen, DailyProgress, Cryo vacuum chamber, Damaged workpiece, but otherwise ready to pump down 
|
Thu May 20 16:40:09 2021, Radhika, DailyProgress, Cryo vacuum chamber, Damaged workpiece, but otherwise ready to pump down   
|
Mon May 17 09:52:37 2021, Radhika, DailyProgress, Cryo vacuum chamber, Large cyro chamber progress   
|
Tue May 11 19:23:51 2021, Radhika, DailyProgress, 2um Photodiodes, ADC noise level spectrum 
|
Mon May 3 17:32:29 2021, Radhika, Summary, 2um Photodiodes, Updated PD testing schematic / measurement table  
|
Wed May 5 00:34:14 2021, rana, Summary, 2um Photodiodes, Updated PD testing schematic / measurement table
|
Mon May 10 15:38:36 2021, rana, Summary, 2um Photodiodes, Keithley connections
|
Mon May 3 16:56:59 2021, Stephen, DailyProgress, Cryo vacuum chamber, Cooling power of current setup
|
Sun May 9 11:14:30 2021, Paco, DailyProgress, Cryo vacuum chamber, Cooling power of current setup
|
Fri Apr 30 08:09:08 2021, Stephen, DailyProgress, Cryo vacuum chamber, Simplifying cryocooler connections is WIP
|
Wed Apr 21 16:45:01 2021, Aidan, Lab Infrastructure, Cameras, Telephoto and macro lenses for smartphones  
|
Wed Apr 21 09:42:35 2021, Stephen, rana, Things to Buy, Cryo vacuum chamber, Reimagining QIL Cryo Vacuum Chamber
|
Tue Apr 20 09:43:49 2021, Radhika, Summary, 2um Photodiodes, Link to PD testing master doc
|
Fri Apr 16 11:27:01 2021, Aidan, Update, 2um Photodiodes, 2um DC photodiode voltage weird drift with no incident power
|
Fri Apr 16 13:05:05 2021, Aidan, Update, 2um Photodiodes, 2um DC photodiode voltage weird drift with no incident power   
|
Wed Apr 14 09:49:38 2021, Stephen, DailyProgress, Cryo vacuum chamber,  
|
Thu Apr 1 20:54:57 2021, Radhika, DailyProgress, 2um Photodiodes, Opened cryo chamber and removed old PD 7x
|
Fri Apr 9 16:23:22 2021, rana, DailyProgress, 2um Photodiodes, Opened cryo chamber and removed old PD
|
Tue Apr 13 11:48:04 2021, Radhika, DailyProgress, 2um Photodiodes, Opened cryo chamber and removed old PD
|
Fri Apr 9 09:37:26 2021, Stephen, DailyProgress, Cryo vacuum chamber, Started cooldown with shielding, workpiece Si cantilever  
|
Mon Apr 5 18:50:54 2021, Radhika, Summary, , Current PD testing schematic 
|
Thu Apr 1 20:33:42 2021, Stephen, DailyProgress, Cryo vacuum chamber, Installation of Radiation Shields 12x
|
Thu Apr 1 20:28:26 2021, Radhika, DailyProgress, 2um Photodiodes, Opened cryo chamber and removed old PD
|
Thu Apr 1 18:42:55 2021, Stephen , DailyProgress, Cryo vacuum chamber, Preparations for Q measurements 9x
|
Wed Mar 31 11:06:53 2021, Aidan, Computing, Cymacs, Rebuilding the Cymacs software to compile models
|
Mon Mar 29 14:16:33 2021, Aidan, Computing, CDS, Rebuilding C4TST with frames added to file
|
Thu Mar 25 12:28:19 2021, Aidan, Computing, Cymacs, DAC channels not outputting voltages
|
Fri Mar 19 15:13:25 2021, Aidan, Computing, General, Adding fb4:/usr/share/advligorts to QIL-WS2
|
Fri Mar 19 13:51:16 2021, Aidan, Computing, General, Activated MATLAB on QIL-WS2
|
Wed Mar 17 16:06:24 2021, aaron, Electronics, Equipment transfer, borrowed filter
|
Tue Mar 16 20:50:14 2021, Aidan, Howto, Tutorial video, How to operate the PD pumping station
|
Tue Mar 16 18:45:43 2021, Aidan, DailyProgress, 2um Photodiodes, Cryo cool down and temperature rise - JPL PD LN2 (5 hours to rise)  
|
Fri Mar 12 16:29:36 2021, Aidan, Update, 2um Photodiodes, Vacuum needs leak checking
|
Fri Mar 12 08:31:05 2021, Stephen, Howto, Cryo vacuum chamber, QIL Cryo setup how to videos and photo album
|
Wed Mar 10 17:20:26 2021, Aidan, Update, 2um Photodiodes, Pumped chamber down briefly - connected vacuum gauge to the computer    
|
Thu Mar 4 16:12:26 2021, Aidan, Howto, 2um Photodiodes, JPL PD set up tutorial video
|
Thu Mar 4 13:37:51 2021, Aidan, Update, 2um Photodiodes, Reference PD reading vs Power incident on viewport 
|
Wed Mar 3 16:14:18 2021, Aidan, Update, 2um Photodiodes, Bringing 2um PD testing back online
|
Fri Feb 5 08:50:02 2021, Stephen, DailyProgress, Cryo vacuum chamber, Successful cooldown, cold flange without shields 7x
|
Fri Feb 5 14:13:08 2021, rana, DailyProgress, Cryo vacuum chamber, Successful cooldown in
|
Fri Jan 29 10:14:16 2021, Stephen, DailyProgress, Cryo vacuum chamber, Restarting Cryo vacuum chamber effort   
|
Mon Jan 25 16:05:43 2021, aaron, Misc, Equipment transfer, cantilever Qs to QIL 
|
Fri Jan 15 10:55:23 2021, Paco, Lab Infrastructure, General, Borrow AG4395A
|
Fri Nov 20 18:49:43 2020, Koji, Summary, General, Instrument loan
|
Tue Dec 22 10:42:17 2020, rana, Summary, General, Instrument loan
|
Tue Dec 22 15:20:14 2020, Koji, Summary, General, Instrument loan
|
Tue Dec 29 17:53:21 2020, rana, Summary, General, Instrument loan
|
Wed Dec 16 22:08:36 2020, anchal, Update, Equipment transfer, Took delay line box, compressed nitrogen cylinder and lens to 2um (Crackle) lab
|
Tue Dec 8 11:27:51 2020, Radhika, Misc, Lab Monitoring, Particle counter communication
|
Fri Nov 20 18:47:42 2020, Koji, Summary, General, Permenant exchange of TED200C(QIL) and TED200C(2umECDL)
|
Tue Nov 17 17:51:44 2020, Aidan, Update, 2um Photodiodes, Agilis piezo mirror installed in JPL PD testing apparatus 
|
Thu Nov 19 16:25:30 2020, Aidan, Update, 2um Photodiodes, Agilis piezo mirror installed in JPL PD testing apparatus
|
Mon Nov 9 10:08:38 2020, anchal, Summary, ECDL, AUX wavelength finesee requirements in mariner with 1418 nm ECDL (Preliminary)
|
Wed Nov 11 16:09:22 2020, anchal, Summary, ECDL, AUX wavelength finesee requirements in mariner - Added Excess Scatter Noise
|
Mon Nov 9 15:49:58 2020, Aidan, Update, 2um Photodiodes, JPL PD resurrection (cont.)
|
Tue Nov 10 12:46:34 2020, Aidan, Update, 2um Photodiodes, JPL PD resurrection (cont.)
|
Fri Nov 6 08:14:58 2020, Aidan, Update, 2um Photodiodes, Photodiode testing recovery status
|
Fri Nov 6 12:45:21 2020, Aidan, Update, 2um Photodiodes, Photodiode testing recovery status 
|
Thu Nov 5 11:20:45 2020, anchal, Summary, ECDL, True PDH Error signal TF and including FSR effects in approximated models 
|
Thu Oct 22 11:19:44 2020, anchal, Summary, ECDL, Prospects of using ECDL for Auxiliary laser
|
Fri Oct 23 12:19:19 2020, anchal, Summary, ECDL, Effects of chosen AUX finesse and source on Calibration requirements
|
Wed Oct 28 14:05:19 2020, rana, Summary, ECDL, Effects of chosen AUX finesse and source on Calibration requirements
|
Fri Sep 25 14:45:04 2020, Stephen, DailyProgress, Cryo vacuum chamber, Vibration Measurement Equipment and Shield Construction
|
Wed Sep 23 00:26:59 2020, aaron, Misc, General, lab entry
|
Tue Sep 15 15:16:18 2020, Anchal, Misc, Cleanliness, HEPA Filters turned to maximum
|
Wed Sep 2 08:13:18 2020, Stephen, DailyProgress, Cryo vacuum chamber, Assembly of QIL Setup and other updates from 2020 Sep 01  
|
Fri Aug 14 11:17:04 2020, Raymond, Update, Cryo vacuum chamber, Cooler now operational  
|
Fri Aug 7 11:50:06 2020, Raymond, Update, Cryo vacuum chamber, Tank pumpdown
|
Tue Aug 4 17:08:00 2020, Raymond, Update, Cryo vacuum chamber, 19 pin MIL feedthrough and CTC100 wiring  
|
Fri Jul 24 07:50:00 2020, Raymond, Update, Cryo vacuum chamber, Prototype shield panels
|
Fri Jul 24 05:22:30 2020, Raymond, Lab Infrastructure, PD QE, Round 2 of JPL PD's in lab
|
Fri Jul 24 04:54:57 2020, Raymond, Lab Infrastructure, General, MDF repair  
|
Fri Jul 17 15:54:42 2020, Stephen, Lab Infrastructure, Cryo vacuum chamber,
|
Fri Jul 24 04:46:51 2020, Stephen, Lab Infrastructure, Cryo vacuum chamber,
|
Thu Apr 16 18:03:22 2020, aaron, Update, PSOMA, preliminary PSOMA layout
|
Tue May 12 10:15:30 2020, aaron, Update, PSOMA, preliminary PSOMA layout 
|
Fri May 1 13:27:07 2020, Raymond , Update, PD noise, Sb3513 A2P6 2020-02-04 Dark Noise/QE data
|
Mon Apr 6 18:35:48 2020, Koji, Summary, General, West Bridge flooding Apr 6th 
|
Mon Apr 6 18:38:50 2020, Koji, Update, General, West Bridge flooding Apr 6th 15x
|
Mon Apr 6 19:01:21 2020, Koji, Update, General, West Bridge flooding Apr 6th    
|
Mon Feb 24 18:41:06 2020, Raymond, Lab Infrastructure, HVAC, Table Shielding for 2020-02-25 HVAC repairs   
|
Tue Feb 25 15:12:22 2020, Raymond, Chris, Koji, Chub, Aidan, Lab Infrastructure, HVAC, HVAC work concluded for today
|
Mon Mar 9 13:13:02 2020, Koji, Lab Infrastructure, HVAC, HVAC work concluded for today
|
Thu Feb 27 14:26:52 2020, Koji, Summary, Lab Monitoring, Item lending: Particle Counter from OMC Lab to QIL
|
Fri Feb 28 13:36:32 2020, Ian MacMillan, Summary, Lab Monitoring, Item lending: Particle Counter from OMC Lab to QIL
|
Wed Mar 27 11:27:00 2019, Aidan, Lab Infrastructure, HVAC, HVAC temperature gradients in the QIL
|
Wed Apr 24 14:19:55 2019, awade, Lab Infrastructure, HVAC, HVAC QIL: two actuators tied to one sensor now
|
Wed Apr 24 19:30:55 2019, rana, Lab Infrastructure, HVAC, howto get temperature trends
|
Sun May 5 20:58:20 2019, rana, Lab Infrastructure, HVAC, howto get temperature trends 
|
Fri May 10 18:39:10 2019, rana, Lab Infrastructure, HVAC, howto get temperature trends
|
Tue May 14 13:10:36 2019, rana, Lab Infrastructure, HVAC, HVAC debuggin
|
Tue Feb 4 14:18:24 2020, Ian MacMillan, Lab Infrastructure, HVAC, Recent temperature fluctuations  
|
Thu Feb 13 11:04:47 2020, Ian MacMillan, Lab Infrastructure, HVAC, Recent temperature fluctuations 
|
Fri Dec 20 21:58:14 2019, Koji, Update, PD QE, PD TEC driver / A2P6 aligned / Lens moved 
|
Fri Dec 20 22:26:19 2019, Koji, Update, PD QE, PD TEC driver / A2P6 aligned / Lens moved 6x
|
Fri Dec 20 13:20:53 2019, Aidan, Summary, PD QE, QE results from A2P6 (500um) and A2P2 (1mm) 6x
|
Fri Dec 13 01:51:15 2019, Raymond, DailyProgress, PD QE, Cryostat wiring fixes
|
Mon Dec 16 18:16:31 2019, Raymond, DailyProgress, PD QE, Cryostat wiring fixes
|
Thu Dec 12 02:10:37 2019, Raymond, Chris, DailyProgress, PD QE, PD test dry run
|
Wed Dec 11 15:53:48 2019, Aidan, Chris, Raymond, Howto, Cryo vacuum chamber, Procedure to record photodiode output vs temperature
|
Wed Dec 11 19:50:25 2019, rana, Howto, Cryo vacuum chamber, Procedure to record photodiode output vs temperature
|
Wed Dec 11 01:29:26 2019, Koji, Summary, PD QE, Sb3513 A2P6 Dark Current / QE / Dark Noise measurement @77K   
|
Tue Dec 10 16:35:03 2019, Aidan, Laser, 2micronLasers, Calibrated cryo-PD REF PD output in units of power incident on cryo chamber window
|
Mon Dec 9 14:03:52 2019, Chris, DailyProgress, PD QE, Toward PD testing automation
|
Mon Dec 9 14:45:45 2019, Koji, DailyProgress, PD QE, Toward PD testing automation
|
Mon Dec 9 02:15:39 2019, Raymond, DailyProgress, PD QE, IR Labs Cryostat
|
Mon Dec 9 12:34:14 2019, Koji, DailyProgress, PD QE,
|
Fri Dec 6 00:13:12 2019, Chris, Computing, CDS, arbitrary waveform streaming on the cymac
|
Mon Sep 23 10:49:27 2019, Koji, Summary, PD QE, QE and dark current of InAsSb sensors  
|
Wed Sep 25 01:05:30 2019, Koji, Summary, PD QE, QE and dark current of InAsSb sensors   
|
Thu Dec 5 13:50:59 2019, Koji, Summary, PD QE, Dark current measurement with the sourcemeter
|
Fri Nov 15 17:29:14 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
|
Tue Nov 19 20:16:40 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab
|
Wed Nov 20 11:59:17 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab
|
Wed Nov 20 12:25:58 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab
|
Wed Nov 20 17:44:10 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
|
Thu Nov 21 21:45:10 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab
|
Fri Nov 22 13:21:26 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
|
Fri Nov 22 15:33:40 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab
|
Sat Nov 23 13:00:06 2019, Koji, Lab Infrastructure, Optics, Optical window transmission measurement  
|
Tue Nov 26 15:36:59 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab
|
Wed Dec 4 13:54:04 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab
|
Mon Nov 25 21:46:56 2019, Koji, Summary, PD QE, System Diagram  
|
Wed Nov 27 20:38:57 2019, Koji, Summary, PD QE, System Diagram
|
Sun Dec 1 01:32:19 2019, Koji, Summary, PD QE, PD TEC cooling test 
|
Tue Dec 3 15:32:39 2019, Koji, Summary, PD QE, PD TEC cooling test
|
Tue Nov 26 18:49:11 2019, Koji, Update, PD QE, Socket soldering test piece made 6x
|
Tue Dec 3 13:52:04 2019, Koji, Update, PD QE, Socket soldering test piece made   
|
Mon Nov 25 15:03:34 2019, Koji, Update, PD QE, In solder and PD mounts are in  
|
Tue Nov 12 17:44:39 2019, Raymond, DailyProgress, Cryo vacuum chamber, Tank Update  
|
Thu Nov 21 21:58:27 2019, Raymond, DailyProgress, Cryo vacuum chamber, Tank Update  
|
Wed Nov 20 11:51:27 2019, Raymond, Misc, HVAC, Dueling vents
|
Mon Nov 18 17:17:29 2019, Duo, Summary, , Restart model in QIL lab
|
Fri Nov 15 20:10:00 2019, Koji, Summary, 2micronLasers, InAsSb PD Mounts designed
|
Thu Oct 31 18:31:10 2019, Koji, Laser, PD QE, PD EQE vs Spot size
|
Fri Nov 1 12:47:18 2019, Koji, Laser, PD QE, PD EQE vs Spot size  
|
Tue Nov 12 03:40:39 2019, Koji, Laser, PD QE, PD EQE vs Spot size
|
Mon Nov 11 22:19:09 2019, Raymond, DailyProgress, Cryo vacuum chamber, Changes to preserve long strap for internal chamber use
|
Wed Nov 6 17:05:33 2019, Raymond, DailyProgress, Cryo vacuum chamber, Conflat flange tightening
|
Tue Nov 5 20:06:36 2019, Raymond, Update, Cryo vacuum chamber, Cooler to tank connection 
|
Thu Oct 24 11:58:27 2019, Chris, Electronics, CDS, new QIL AA boards
|
Tue Oct 22 15:55:52 2019, Koji, Electronics, General, Borrowed ITC510 from Cryo
|
Mon Oct 21 17:07:17 2019, Chris, Lab Infrastructure, Cryo vacuum chamber, Cryo chamber vacuum pressure logging
|
Fri Oct 18 14:44:22 2019, Chris, Lab Infrastructure, Cryo vacuum chamber, 208V electrical service was installed in the QIL
|
Thu Oct 17 14:12:10 2019, Duo, Lab Infrastructure, , IOGEAR GWU637 failure
|
Fri Oct 11 17:12:26 2019, Raymond, Chris, DailyProgress, Cryo vacuum chamber, Closing the vacuum chamber
|
Fri Oct 11 17:33:47 2019, rana, DailyProgress, Cryo vacuum chamber, Closing the vacuum chamber
|
Thu Oct 10 17:28:33 2019, Raymond, Chris, DailyProgress, Cryo vacuum chamber, Radiation shields unpacked 6x
|
Wed Oct 9 17:40:57 2019, Raymond, Chris, Duo, DailyProgress, Cryo vacuum chamber, Closing the vacuum chamber
|
Tue Oct 1 19:25:08 2019, Jon, Computing, Cymacs, IP address changes
|
Thu Sep 26 18:05:31 2019, Duo, Lab Infrastructure, , Cryo cooler and pump test run
|
Mon Sep 23 23:48:12 2019, Koji, Update, 2micronLasers, 2um sensor cards / focusing optics
|
Fri Sep 20 17:31:25 2019, Duo, DailyProgress, General, General update
|
Tue Sep 17 23:42:41 2019, Shalika Singh, Laser, PD QE, Measuring Quantum Efficiency of Extended InGaAs Photodiode  
|
Tue Sep 10 17:17:11 2019, Shalika Singh, Noise Budget, PD noise, Dark Noise measurement of Extended InGaAs 8x
|
Tue Sep 10 18:38:18 2019, Koji, Noise Budget, PD noise, Dark Noise measurement of Extended InGaAs
|
Sun Sep 8 16:08:04 2019, rana, Electronics, General, Solder: what kind of solder to use and why?
|
Thu Sep 5 11:10:08 2019, Shalika Singh, Noise Budget, TIA, Noise Analysis of transimpedance amplifier 7x
|
Thu Sep 5 15:40:22 2019, rana, Noise Budget, PD noise, Noise Analysis of transimpedance amplifier
|
Tue Sep 3 16:47:08 2019, Duo, Lab Infrastructure, , QIL lab floor plan
|
Wed Sep 4 22:14:12 2019, rana, Lab Infrastructure, , QIL lab floor plan
|
Tue Aug 13 19:03:05 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Analysis of Voltage Regulator Circuit using SR785 Spectrum Analyzer  
|
Thu Aug 15 08:03:13 2019, rana, Noise Budget, 2micronLasers, Noise Analysis of Voltage Regulator Circuit using SR785 Spectrum Analyzer
|
Thu Aug 15 08:36:29 2019, Shalika, Noise Budget, 2micronLasers, Noise Analysis of Voltage Regulator Circuit using SR785 Spectrum Analyzer
|
Fri Aug 30 05:11:11 2019, Chris, Noise Budget, 2micronLasers, Noise Analysis of Voltage Regulator Circuit using SR785 Spectrum Analyzer
|
Wed Aug 28 21:25:20 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Bump observed at 8kHz during TIA noise analysis    
|
Thu Aug 29 15:36:49 2019, Koji, Noise Budget, 2micronLasers, Noise Bump observed at 8kHz during TIA noise analysis
|
Mon Aug 26 10:45:43 2019, Shalika Singh, Noise Budget, PD noise, 1/f noise analysis and dark current density  
|
Fri Aug 23 12:45:08 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation   
|
Fri Aug 23 14:15:58 2019, Duo, Noise Budget, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation
|
Fri Aug 23 17:35:37 2019, Koji, Noise Budget, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation
|
Mon Aug 19 13:57:02 2019, Shalika, Noise Budget, PD noise, Dark noise of Sb3513_A2 6x
|
Sun Aug 18 14:16:59 2019, Duo, Summary, , Measuring the dark current of PD 
|
Thu Aug 15 02:30:29 2019, Koji, Summary, 2micronLasers, InAsSb PDs accomodated in PD housings / PD cables 9x
|
Fri Aug 16 01:28:28 2019, Koji, Summary, 2micronLasers, Switchable breakout bok 
|
Thu Aug 15 15:45:30 2019, Duo, Lab Infrastructure, , Floor plan around the big cryostat
|
Wed Aug 14 19:50:37 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise analysis of Sallen Key filter using SR785 and Zero simulation   
|
Wed Aug 14 16:07:57 2019, Nathan Holland, DailyProgress, 2micronLasers, New AOM Driver.   
|
Tue Aug 13 19:14:04 2019, Jon, Computing, Cymacs, NFS server set up
|
Tue Aug 13 17:59:25 2019, Nathan Holland, Noise Budget, 2micronLasers, Phase Noise of Mach Zehnder with VCO.   
|
Tue Aug 13 16:53:57 2019, Nathan Holland, Electronics, 2micronLasers, Phase Noise of Brimrose AOM Driver (VCO).  
|
Mon Aug 12 11:51:38 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Analysis of Voltage Regulator using SR785 Spectrum Analyser 
|
Mon Aug 12 15:17:05 2019, Koji, Noise Budget, 2micronLasers, Noise Analysis of Voltage Regulator using SR785 Spectrum Analyser
|
Mon Aug 12 12:09:00 2019, Nathan Holland, Summary, 2micronLasers, Adjusting the Voltage/Frequency Offset on the Brimrose AOM Driver.   
|
Mon Aug 12 11:37:36 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation 7x
|
Sun Aug 11 01:22:04 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Analysis of voltage regulator using SR785 Spectrum Analyser 
|
Sun Aug 11 14:35:41 2019, Koji, Noise Budget, 2micronLasers, Noise Analysis of voltage regulator using SR785 Spectrum Analyser
|
Sun Aug 11 19:15:32 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Analysis of voltage regulator using SR785 Spectrum Analyser
|
Sun Aug 11 22:34:50 2019, Koji, Noise Budget, 2micronLasers, Noise Analysis of voltage regulator using SR785 Spectrum Analyser
|
Fri Aug 9 21:10:48 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation 6x
|
Thu Aug 8 17:19:12 2019, Shalika Singh, Noise Budget, 2micronLasers, Noise Analysis of TIA using SR785 Spectrum Analyser and Zero Simulation   
|
Fri Aug 2 16:15:01 2019, Nathan Holland, DailyProgress, 2micronLasers, Frequency Noise Measured by 2um Mach Zehnder.  
|
Thu Aug 1 11:25:27 2019, Shalika Singh, DailyProgress, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation   
|
Thu Aug 1 13:01:15 2019, rana, DailyProgress, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation
|
Mon Jul 29 17:52:33 2019, Shalika Singh, DailyProgress, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation  
|
Tue Jul 30 20:42:06 2019, rana, DailyProgress, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyser and Zero Simulation
|
Mon Jul 29 14:46:09 2019, Nathan Holland, DailyProgress, 2micronLasers, Optical Phase noise of 2 um Mach Zehnder Interferometer.   
|
Mon Jul 29 15:46:50 2019, Koji, Laser, 2micronLasers, Optical Phase noise of 2 um Mach Zehnder Interferometer.
|
Thu Jul 25 11:15:40 2019, Nathan Holland, DailyProgress, 2micronLasers, Phase Noise of Moku. 8x
|
Wed Jul 24 18:50:27 2019, Shalika Singh, DailyProgress, 2micronLasers, Correction in Transfer Function using SR785 spectrum analyzer 
|
Tue Jul 23 21:02:14 2019, Shalika Singh, DailyProgress, 2micronLasers, Transfer Function using SR785 spectrum analyzer 
|
Mon Jul 22 20:36:35 2019, Koji, Electronics, 2micronLasers, Sockets for LaserComponents PDs  
|
Mon Jul 22 20:21:33 2019, Shalika, Noise Budget, 2micronLasers, Noise Analysis of Circuit using SR785 Spectrum Analyzer and Zero Simulation 7x
|
Mon Jul 22 18:11:59 2019, Jon, Computing, Cymacs, New Monitors for QIL Workstation
|
Mon Jul 15 19:02:21 2019, Jon, Computing, Cymacs, Cymac RTS Environment Set Up
|
Wed Jul 10 17:37:09 2019, Jon, Computing, Cymacs, New QIL workstation
|
Wed Jun 26 11:45:09 2019, Koji, Summary, 2micronLasers, 2um PD transimpedance    
|
Mon Jul 1 21:20:55 2019, Koji, Summary, 2micronLasers, The PDs delivered to the lab
|
Sat Jun 29 09:50:20 2019, Jon, Computing, CDS, Cymac workstation setup
|
Tue Jun 25 19:56:23 2019, rana, Electronics, Cleanliness, Moku Out
|
Tue Jun 18 00:43:17 2019, Duo, DailyProgress, Cryo vacuum chamber, Chamber Opening 
|
Sat Jun 1 09:46:00 2019, Anjali, Update, 2micronLasers, Frequency noise measurement of 2 micron source
|
Fri Jun 7 16:32:59 2019, Anjali, Update, 2micronLasers, Frequency noise measurement of 2 micron source 
|
Thu Jun 13 22:53:25 2019, Anjali, Update, 2micronLasers, Frequency noise measurement of 2 micron source 
|
Wed Jun 12 15:15:58 2019, Aidan, Chris, Lab Infrastructure, Cleanliness,  
|
Wed Jun 5 14:16:07 2019, Koji, Update, 2micronLasers, 2um laser / cryo stat: setup inspection and action item updates
|
Thu May 30 07:43:21 2019, Anjali, Update, 2micronLasers, Frequency noise measurement of 2 micron source using PLL 
|
Wed May 22 15:07:09 2019, awade, DailyProgress, WOPO, Demodulation and subtraction for homodyne detector with Zurich box    
|
Thu May 23 15:29:58 2019, awade, DailyProgress, WOPO, Making time domain measurement of noise power in homoydne with WOPO pump on
|
Sun May 26 21:24:38 2019, awade, DailyProgress, WOPO, Excess noise when pumping: checklist for Monday.
|
Wed May 29 15:24:33 2019, awade, DailyProgress, WOPO, Update to checklist
|
Wed May 29 08:16:47 2019, Anjali, Update, 2micronLasers, Frequency noise measurement of 2 micron source using PLL
|
Sun May 26 01:12:33 2019, Anjali, Update, 2micronLasers, Frequency noise measurement of 2 micron source using PLL 8x
|
Thu May 23 03:00:24 2019, Anjali, Update, 2micronLasers, Frequency noise measurement of 2 micron source using PLL   
|
Sat May 18 22:25:30 2019, Anjali, Update, 2micronLasers, Characterization of new detector  
|
Thu May 23 02:53:19 2019, Anjali, Update, 2micronLasers, Characterization of new detector
|
Mon May 20 02:23:14 2019, Anjali, Update, 2micronLasers, Frequency noise measurement of 2 micron source using PLL   
|
Wed May 15 20:08:01 2019, Anjali, Update, 2micronLasers, PLL loop for frequency noise measurement 7x
|
Thu May 16 13:40:13 2019, anchal, Update, 2micronLasers, PLL loop for frequency noise measurement
|
Sun May 19 22:08:09 2019, Anjali, Update, 2micronLasers, PLL loop for frequency noise measurement    
|
Tue Apr 30 19:52:14 2019, awade, Howto, WOPO, Configuring Zurich box server
|
Thu May 16 16:52:46 2019, awade, Howto, WOPO, Zurich box python access
|
Wed May 15 19:24:52 2019, Jon, Lab Infrastructure, Cymacs, Permanent cymac hardware installed and tested 
|
Sat May 11 15:47:37 2019, Jon, Lab Infrastructure, Cymacs, MEDM user interface set up on QIL cymac
|
Fri May 10 16:22:45 2019, Anjali, Update, 2micronLasers, Characterization of RF driver and AOM . 6x
|
Fri May 10 13:54:28 2019, Jon, Lab Infrastructure, Cymacs, QIL cymac installed in rack, passes loopback testing
|
Tue May 7 19:39:39 2019, Jon, Lab Infrastructure, Cymacs, User model set up on QIL cymac
|
Sun May 5 15:17:33 2019, Anjali, Noise Budget, 2micronLasers, Frequency noise measurement of 2 micron source 
|
Sun May 5 20:52:16 2019, rana, Noise Budget, 2micronLasers, Frequency noise measurement of 2 micron source
|
Wed May 1 14:34:53 2019, awade, DailyProgress, WOPO, Output chain and demodulation of squeezing signal
|
Wed Apr 10 12:17:34 2019, Anjali, Update, 2micronLasers, Intensity noise stabilization of 2 micron source    
|
Wed Apr 10 18:58:48 2019, rana, Update, 2micronLasers, Intensity noise stabilization of 2 micron source
|
Wed Apr 24 09:01:49 2019, Anjali, Update, 2micronLasers, Intensity noise stabilization of 2 micron source
|
Mon Apr 22 19:35:16 2019, anchal and awade, Summary, WOPO, Shot Noise Intercept Current measurement of Photodiodes  
|
Thu Apr 11 20:50:17 2019, rana, Howto, General, how to learn quickly
|
Thu Aug 2 15:01:21 2018, awade, DailyProgress, WOPO, Building a SN limited detector for WOPO experiment 6x
|
Mon Aug 6 17:30:53 2018, awade, DailyProgress, WOPO, Too much RIN, making a balanced detector 
|
Thu Aug 9 16:51:43 2018, awade, DailyProgress, WOPO, Testing balanced detector
|
Mon Aug 20 12:11:45 2018, awade, DailyProgress, WOPO, Testing (freespace) balanced detector
|
Mon Aug 20 22:09:27 2018, awade, DailyProgress, WOPO, PZT broken no slow phase modulation on LO
|
Wed Aug 22 00:42:42 2018, awade, DailyProgress, WOPO, New PZT mounted mirror    
|
Thu Aug 23 12:49:17 2018, awade, DailyProgress, WOPO, New PZT mounted mirror mounted
|
Mon Aug 13 01:48:48 2018, rana, DailyProgress, WOPO, SR560 battery as a voltage supply
|
Wed Aug 15 09:57:56 2018, awade, DailyProgress, WOPO, SR560 battery as a voltage supply
|
Mon Aug 13 01:53:21 2018, rana, DailyProgress, WOPO, zero-span spec OR RF bandpass
|
Mon Aug 13 15:43:55 2018, Chris, DailyProgress, WOPO, zero-span spec OR RF bandpass
|
Mon Aug 20 12:08:17 2018, awade, DailyProgress, WOPO, zero-span spec OR RF bandpass
|
Wed Mar 27 20:37:38 2019, awade, DailyProgress, WOPO, Measuring TF Homodyne Photo Detector for WOPO experiment  
|
Fri Mar 29 16:00:21 2019, awade, DailyProgress, WOPO, Remeasuring TF Homodyne Photo Detector B after switching out foil cap
|
Wed Apr 10 13:10:45 2019, awade, DailyProgress, WOPO, Rebuild of WOPO homodyne detectors using AD829    
|
Tue Apr 2 14:16:00 2019, Aidan, Lab Infrastructure, Lab Monitoring, HOBO MX100 temperature sensors/data loggers added to the optical tables 7x
|
Wed Apr 3 12:51:55 2019, Aidan, Lab Infrastructure, Lab Monitoring, HOBO MX100 temperature sensors/data loggers added to the optical tables  
|
Mon Apr 8 14:02:06 2019, Aidan, Lab Infrastructure, Lab Monitoring, HOBO MX100 temperature sensors/data loggers added to the optical tables  
|
Thu Mar 28 18:16:59 2019, Jon, Update, Computing, Cymac assembly started
|
Mon Apr 1 11:03:24 2019, Jon, Update, Computing, Cymac assembly started
|
Tue Mar 26 17:13:53 2019, Anjali, Update, 2micronLasers, Frequency stabilization of 2 micron source
|
Mon Mar 25 09:40:16 2019, Anjali, Noise Budget, 2micronLasers, Noise budget for the frequency discriminator 
|
Fri Mar 22 10:00:30 2019, Anjali, Noise Budget, 2micronLasers, Noise budget for the frequency discriminator
|
Thu Mar 21 09:43:19 2019, Anjali, Noise Budget, 2micronLasers, Noise budget for the frequency discriminator
|
Thu Mar 21 00:49:35 2019, Anjali, Noise Budget, 2micronLasers, Noise budget for the frequency discriminator
|
Wed Mar 20 15:57:55 2019, Anjali, Noise Budget, 2micronLasers, Noise budget for the frequency discriminator   
|
Wed Mar 20 19:17:50 2019, rana, Noise Budget, 2micronLasers, Noise budget for the frequency discriminator
|
Wed Mar 13 17:49:14 2019, awade, Summary, WOPO, Damage threshold estimates for optical fibers
|
Wed Feb 20 10:38:46 2019, awade, DailyProgress, WOPO, Fixing 532 nm polarization linearity issues
|
Thu Feb 28 16:00:59 2019, awade, DailyProgress, WOPO, Pol launch into PM fiber  
|
Tue Mar 12 16:35:43 2019, awade, DailyProgress, WOPO, Pol launch into PM fiber 1064 nm
|
Wed Mar 13 12:44:41 2019, awade, anchal, DailyProgress, WOPO, Pol launch into PM fiber 1064 nm
|
Tue Mar 12 16:58:50 2019, awade, Misc, WOPO, Todo list W11
|
Mon Mar 11 08:49:11 2019, Aidan, Chub, Computing, Cymacs, Building FB4 Cymacs 
|
Fri Mar 8 17:05:52 2019, Anjali, Update, , Frequency stabilization of 2 micron source
|
Mon Feb 25 20:42:32 2019, Koji, Summary, Scatterometer, Si Block stored in Cryo Lab
|
Thu Feb 21 17:02:24 2019, awade, DailyProgress, WOPO, Mixing down homodyne output from 1 MHz
|
Fri Feb 22 14:05:09 2019, awade, DailyProgress, WOPO, Mixing down homodyne: 5th order elliptic filter (100 kHz)   
|
Tue Jan 8 11:38:49 2019, awade, Lab Infrastructure, General, Roughing pump leaking oil on bake rig 
|
Wed Jan 2 18:51:53 2019, awade, DailyProgress, Homodyne, Tweek up fiber alignment and reboot of homodyne
|
Fri Jan 4 19:49:51 2019, awade, DailyProgress, Homodyne, Tweek up fiber alignment and reboot of homodyne
|
Mon Jan 7 19:27:10 2019, awade, DailyProgress, Homodyne, Fixing homodyne fringe visibility and estimating losses
|
Mon Dec 24 16:46:41 2018, awade, DailyProgress, WOPO, MM into 532 nm patch fiber (to be hooked up to WOPO)
|
Tue Dec 4 19:34:22 2018, awade, DailyProgress, WOPO, Diabolo 532 nm power drop and retuning   
|
Thu Dec 6 20:04:50 2018, awade, DailyProgress, WOPO, Diabolo 532 nm power drop and retuning
|
Fri Dec 7 20:31:06 2018, awade, DailyProgress, WOPO, Diabolo: cleaning dust out of SHG unit, self heating issues    
|
Thu Dec 13 14:01:13 2018, awade, DailyProgress, WOPO, Diabolo: contacted coherent
|
Thu Dec 13 16:24:06 2018, awade, DailyProgress, WOPO, Diabolo: baseline numbers for coherent 
|
Wed Dec 19 16:48:18 2018, awade, DailyProgress, WOPO, Diabolo: baseline numbers for coherent
|
Thu Dec 20 19:20:50 2018, awade, DailyProgress, WOPO, Diabolo: trialing SHG oven set temperature points to see if there is a maxima when locked 
|
Fri Dec 21 15:33:26 2018, Koji, DailyProgress, WOPO, Diabolo: trialing SHG oven set temperature points to see if there is a maxima when locked
|
Fri Dec 21 15:51:27 2018, awade, DailyProgress, WOPO, Diabolo: trialing SHG oven set temperature points to see if there is a maxima when locked
|
Mon Dec 24 10:08:49 2018, awade, DailyProgress, WOPO, Diabolo: back to power with deliberate pre-misalignment  
|
Mon Dec 24 12:07:18 2018, Koji, DailyProgress, WOPO, Diabolo: back to power with deliberate pre-misalignment
|
Fri Dec 21 16:14:42 2018, Rahul, DailyProgress, Cryo vacuum chamber, Pump down results 
|
Fri Dec 21 15:23:02 2018, Rahul, DailyProgress, Cryo vacuum chamber, Chamber closed for 1st pump down test   
|
Mon Dec 17 13:52:58 2018, Aidan, Lab Infrastructure, Cleanliness, Oil spill on North table 
|
Wed Dec 12 14:40:17 2018, Rahul, DailyProgress, Cryo vacuum chamber, cleaning of shields and cold plate 
|
Tue Dec 11 16:26:07 2018, Rahul, DailyProgress, Cryo vacuum chamber, cleaning of shields and cold plate
|
Fri Dec 7 16:08:45 2018, Rahul, DailyProgress, Cryo vacuum chamber, Radiation shields  
|
Fri Dec 7 11:59:29 2018, awade, Lab Infrastructure, General, Cardboard and packaging in the lab
|
Fri Dec 7 14:43:20 2018, Rahul, Lab Infrastructure, General, Cardboard and packaging in the lab
|
Thu Dec 6 16:49:40 2018, Rahul, DailyProgress, Cryo vacuum chamber, Chamber and bottom plate assembly 
|
Thu Dec 6 12:44:18 2018, Rahul, DailyProgress, Cryo vacuum chamber, Fabricated parts arrived
|
Wed Dec 5 16:49:50 2018, Rahul, DailyProgress, Cryo vacuum chamber, Schematic for the flanges
|
Wed Dec 5 16:18:50 2018, Rahul, DailyProgress, Cryo vacuum chamber, bottom plate
|
Tue Dec 4 15:56:29 2018, Rahul, DailyProgress, Cryo vacuum chamber, O-ring which fits 
|
Thu Nov 29 17:00:37 2018, Rahul, Misc, , Nor-Cal: leak rate of the chamber (collar)
|
Thu Nov 29 16:52:50 2018, Rahul, Summary, , Cryo-vacuum chamber 
|
Fri Jun 29 09:18:32 2018, Vinny W., DailyProgress, 2micronLasers, Power Loss in Fiber Optic Cable 7x
|
Fri Jun 29 17:33:44 2018, rana, DailyProgress, 2micronLasers, Power Loss in Fiber Optic Cable
|
Wed Nov 28 17:14:11 2018, awade, Summary, TMTF, Notes on optimal length mismatch for fiber delay line MZ 
|
Wed Nov 28 12:14:35 2018, awade, DailyProgress, WOPO, Mode field diameter choosing best patch for WOPO input
|
Wed Nov 14 16:49:47 2018, Rahul, Update, Cryo vacuum chamber, assembly 
|
Fri Nov 9 14:57:54 2018, Rahul, Update, , Cryo-vacuum chamber
|
Fri Nov 2 08:59:26 2018, Rahul, Update, , Vacuum chamber  
|
Tue Oct 30 10:17:44 2018, Rahul, Update, , SHI Cryocooler   
|
Mon Oct 29 19:05:58 2018, awade, DailyProgress, WOPO, Fixing MM into 532nm collimator
|
Mon Oct 22 09:46:10 2018, Rahul, Lab Infrastructure, , Cryo vacuum chamber setup   
|
Fri Oct 12 19:05:51 2018, awade, DailyProgress, WOPO, Gluing 532 nm PZT mirror
|
Fri Sep 7 23:12:51 2018, awade, Misc, Lab Monitoring, Temperature logging started in ATF lab
|
Sat Sep 8 17:14:37 2018, awade, Misc, Lab Monitoring, Temperature logging: activity in lab
|
Thu Oct 11 20:29:00 2018, awade, Misc, Lab Monitoring, Temperature logging started in ATF lab 
|
Mon Aug 6 03:45:37 2018, Vinny W., DailyProgress, 2micronLasers, Thermal Sensor Circuit Update   
|
Tue Aug 7 10:47:43 2018, awade, DailyProgress, 2micronLasers, Thermal Sensor Circuit Update
|
Thu Sep 6 10:19:54 2018, awade, DailyProgress, 2micronLasers, Thermal Sensor Circuit: Modifications 8x
|
Thu Aug 30 18:13:28 2018, awade, Howto, General, Running Acromag IOC epics servers out of docker 
|
Wed Aug 29 17:43:05 2018, John Martyn, DailyProgress, Homodyne, An Elusive Short Circuit and a Functional BHD 6x
|
Wed Aug 22 14:13:18 2018, Rahul, Lab Infrastructure, , Cryo-vacuum chamber layout
|
Tue Aug 14 13:44:47 2018, Vinny W., DailyProgress, 2micronLasers, Noise Analyses
|
Tue Aug 14 10:14:11 2018, John Martyn, DailyProgress, Homodyne, BHD Circuits and Set Up   
|
Fri Aug 10 21:55:52 2018, John Martyn, DailyProgress, Homodyne, BHD Electronics
|
Mon Aug 13 19:15:47 2018, awade, John Martyn, DailyProgress, Homodyne, BHD Electronics, digitizing
|
Thu Aug 2 18:14:36 2018, John Martyn, DailyProgress, Homodyne, Outreach IFO Photodetector   
|
Thu Jul 19 11:50:11 2018, Vinny W., DailyProgress, 2micronLasers, The case of the DET10D Photodiode, featuring TIA 
|
Sat Jul 21 14:17:20 2018, awade, DailyProgress, 2micronLasers, The case of the DET10D Photodiode, featuring TIA
|
Thu Aug 2 18:06:54 2018, awade, DailyProgress, 2micronLasers, The case of the DET10D Photodiode, featuring TIA
|
Fri Jul 27 15:50:16 2018, Aidan, Computing, TempCtrl, FB4 has stopped recording second trends
|
Wed Jul 25 19:21:19 2018, John Martyn, DailyProgress, Homodyne, Transimpedance Amplifier and Photodiode Characterization    
|
Fri Jul 27 12:26:58 2018, John Martyn, DailyProgress, , Progress 7/25/18
|
Thu Jul 26 17:49:28 2018, Vinny W., DailyProgress, 2micronLasers, Power Loss through different optic components
|
Sun Jul 22 11:47:02 2018, John Martyn, DailyProgress, Homodyne, Progress 7/22/18  
|
Sun Jul 22 20:12:23 2018, awade, DailyProgress, , Progress 7/22/18
|
Mon Jul 16 22:56:06 2018, John Martyn, DailyProgress, Homodyne, Transimpedance Amplifier Design
|
Sat Jul 21 14:28:34 2018, awade, DailyProgress, M2 ISS, Progress 7/17/18
|
Sat Jul 21 01:45:00 2018, Vinny W., DailyProgress, 2micronLasers, The Gentle Sway of the EP2004  
|
Sat Jul 21 13:32:07 2018, awade, DailyProgress, 2micronLasers, The Gentle Sway of the EP2004
|
Wed Jul 11 16:30:40 2018, Vinny W., Summary, 2micronLasers, Acoustic and Thermal Sensitivity
|
Fri Jul 6 22:30:20 2018, John Martyn, DailyProgress, Homodyne, Beam Profiling 
|
Mon Jul 2 11:23:06 2018, John Martyn, DailyProgress, Homodyne, BHD Optical Setup
|
Tue Jun 19 14:38:23 2018, Aidan, Electronics, TMTF, Ordered clamp plates to mount TECs to fiber for low-bandwidth control 
|
Thu Jun 28 16:59:17 2018, Aidan, Electronics, TMTF, Ordered clamp plates to mount TECs to fiber for low-bandwidth control  
|
Tue Jun 26 17:35:33 2018, John Martyn, DailyProgress, Homodyne, First Week Progress
|
Tue Jun 5 13:59:43 2018, Eric, Summary, , LabJack Summary 9x
|
Tue May 29 16:12:48 2018, awade, Lab Infrastructure, Computing, Upgraded top level QIL/PSL/TCS lab's router
|
Sun May 27 16:10:27 2018, awade, Computing, Computing, Accessing 3com switch from screen on mac
|
Wed Jan 17 10:41:45 2018, awade, Summary, WOPO, Making a transformer coupled photodiodes
|
Wed May 23 20:38:10 2018, rana, Summary, WOPO, Transformer coupled photodiodes
|
Sat May 5 06:08:35 2018, Eric, Update, , LabJack U3 New Setup 
|
Mon Apr 23 12:44:07 2018, Jon Richardson, Computing, General, Added TCS/AWC Lab Port Forwards back to Linksys Router
|
Thu Mar 8 13:23:57 2018, Craig, awade, Computing, General, gateway Linksys router was wiped via factory-reset, awade saves the day 
|
Thu Feb 22 12:09:20 2018, Jon Richardson, Computing, General, Reset Gateway Router
|
Thu Feb 22 12:13:27 2018, awade, Computing, General, Reset Gateway Router
|
Thu Feb 15 16:58:31 2018, Eric, Misc, General, Plan for LabJack U3-HV  
|
Fri Feb 9 15:20:59 2018, Aidan, Electronics, Cameras, Heimann Sensor thermopile array qualitative test 10x
|
Mon Feb 5 15:12:06 2018, Aidan, Computing, General, Major error with FB4 clock
|
Fri Jan 27 13:36:04 2017, Aidan, Lab Infrastructure, PEM, Got old PEM sensors running with Windows 7 OPC server
|
Sat Feb 3 17:21:28 2018, awade, Lab Infrastructure, PEM, Modified Newport Sensors to use USB power in instead of AAs  
|
Wed Jan 3 20:20:07 2018, awade, DailyProgress, WOPO, Reboot WOPO
|
Wed Jan 10 17:03:55 2018, awade, DailyProgress, WOPO, WOPO some shot noise numbers
|
Fri Nov 10 20:23:48 2017, awade, Computing, , Reset top level router
|
Sun Dec 10 15:12:22 2017, awade, Computing, , Reset top level router
|
Sun Dec 10 04:48:59 2017, rana, Computing, General, dokuwiki updated
|
Sun Nov 5 15:12:06 2017, rana, Summary, Computing, diaggui on Mac laptops
|
Wed Sep 27 12:41:57 2017, Jon Richardson, Lab Infrastructure, Computing, TCS Subnet Back Up
|
Thu Sep 21 12:25:05 2017, awade, Computing, Computing, Rebuild ws1 in ATF
|
Mon May 22 17:08:33 2017, awade, Electronics, Scatterometer, Hooking up Newport 6000 to emcore laser diode
|
Mon May 22 23:40:42 2017, awade, Electronics, Scatterometer, Hooking up Newport 6000 to emcore laser diode
|
Thu Sep 21 12:03:27 2017, awade, Electronics, Scatterometer, Hooking up Newport 6000 to emcore laser diode
|
Mon Sep 18 19:29:24 2017, awade, Computing, General, Internet access down
|
Mon Sep 18 20:46:43 2017, awade, Computing, General, Internet access down
|
Fri Sep 15 14:12:38 2017, Aidan, Lab Infrastructure, General, QIL (ATF) Lab preparation for the plumbing work 13x
|
Wed Sep 6 11:51:40 2017, Jon, Lab Infrastructure, Computing, Gateway PC set up
|
Wed Sep 6 11:50:12 2017, Jon, Lab Infrastructure, Computing, Gateway PC set up
|
Wed Aug 30 21:22:20 2017, awade, Lab Infrastructure, CDS, Reboot fb1
|
Tue Aug 29 20:59:11 2017, awade, Jon, Lab Infrastructure, Computing, Setting up a gateway PC
|
Sun Aug 27 21:55:14 2017, awade, Computing, Computing, Mapping the ATF/PSL/TCS lab
|
Mon Aug 28 17:11:47 2017, awade, Computing, Computing, Mapping the ATF/PSL/TCS lab
|
Tue Aug 22 11:59:56 2017, awade, Safety, General, Leak in the ATF Lab
|
Thu Aug 24 13:47:00 2017, Aidan, Safety, General, Leak in the ATF Lab   
|
Wed Aug 16 19:04:47 2017, Amani Garvin, DailyProgress, Scatterometer, Image of Beam in Silicon   
|
Wed Aug 16 10:16:25 2017, Amani Garvin, DailyProgress, Scatterometer, Varying the Distance Between Camera and Silicon 10x
|
Tue Aug 15 20:34:40 2017, Amani Garvin, DailyProgress, Scatterometer, Back of the Envelope Calculation
|
Mon Aug 14 12:29:54 2017, Amani Garvin, DailyProgress, Scatterometer, Image of Scatter in Silicon Sample  
|
Mon Aug 14 16:56:54 2017, Amani Garvin, DailyProgress, Scatterometer, Image of Scatter in Silicon Sample 6x
|
Tue Aug 15 16:40:46 2017, Amani Garvin, DailyProgress, Scatterometer, Image of Scatter in Silicon Sample
|
Thu Aug 10 18:32:51 2017, Amani Garvin, DailyProgress, Scatterometer, Images of Beam through Silicon
|
Mon Aug 14 00:10:37 2017, Amani Garvin, DailyProgress, Scatterometer, Images of Beam through Silicon 
|
Mon Aug 14 09:22:09 2017, Amani Garvin, DailyProgress, Scatterometer, Images of Beam through Silicon 
|
Wed Aug 9 17:07:51 2017, Chris, Misc, Scatterometer, On silicon scattering and defects
|
Tue Aug 8 16:27:29 2017, Amani Garvin, DailyProgress, Scatterometer, What Was Though to be the Laser Is Actually Backscatter  
|
Thu Jul 27 11:41:45 2017, Amani Garvin, DailyProgress, Scatterometer, Calibrating the Camera
|
Wed Aug 2 14:50:03 2017, Amani Garvin, DailyProgress, Scatterometer, Calibrating the Camera
|
Mon Aug 7 15:09:35 2017, rana, DailyProgress, Scatterometer, Calibrating the Camera
|
Tue Aug 8 11:09:04 2017, Amani Garvin, DailyProgress, Scatterometer, Calibrating the Camera 
|
Tue Aug 8 11:12:27 2017, Amani Garvin, DailyProgress, Scatterometer, Calibrating the Camera
|
Mon Jul 24 22:28:51 2017, rana, Misc, General, ELOG word wrap
|
Fri Jul 28 11:16:58 2017, rana, Misc, General, ELOG word wrap
|
Mon Jul 24 11:31:41 2017, Amani Garvin, DailyProgress, Scatterometer, First Image, Need to Clean Things Up  
|
Tue Jul 25 10:54:46 2017, Amani Garvin, DailyProgress, Scatterometer, First Image, Need to Clean Things Up
|
Wed Jul 26 09:48:12 2017, Amani Garvin, DailyProgress, Scatterometer, First Image, Need to Clean Things Up
|
Sat Jul 22 14:43:16 2017, Dhruva, Update, WOPO, Subtractor Circuit Noise
|
Sat Jul 22 14:25:55 2017, Dhruva, Update, WOPO, Table Noise Issues  
|
Sat Jul 22 14:41:07 2017, Dhruva, Update, WOPO, Photodetector Dark Noise
|
Fri Jul 21 09:52:57 2017, Amani Garvin, DailyProgress, Scatterometer, Set Up Changes
|
Tue Jul 18 22:09:14 2017, Dhruva, Update, WOPO, Photodetector Dark Noise
|
Thu Jul 20 18:16:33 2017, rana, Update, WOPO, Photodetector Dark Noise
|
Mon Jul 17 22:19:36 2017, Dhruva, Summary, WOPO, Last Week in WOPO    
|
Mon Jul 17 19:27:27 2017, awade, Misc, General, Ants in the lab
|
Mon Jul 17 19:36:59 2017, Koji, Misc, General, Ants in the lab
|
Tue Jul 11 12:25:29 2017, awade, Howto, General, A Note On Plotting
|
Mon Jul 10 12:05:49 2017, Amani G, DailyProgress, Scatterometer, Initial Build and Some Measurements   
|
Tue Jul 11 12:21:00 2017, awade, DailyProgress, Scatterometer, Initial Build and Some Measurements
|
Mon Jul 10 12:12:26 2017, Dhruva, Update, WOPO, Efficient Fibre Coupling and Phase Matching Plot  
|
Thu Jul 6 15:03:07 2017, Dhruva, Update, WOPO, Homodyne Design
|
Wed Jun 28 13:24:35 2017, awade, Update, WOPO, PDs for homodyne detector   
|
Wed Jun 28 20:05:02 2017, Koji, Update, WOPO, PDs for homodyne detector
|
Wed Jul 5 16:44:34 2017, Koji, Update, WOPO, PDs for homodyne detector
|
Tue Jun 27 11:34:00 2017, Dhruva, Update, WOPO, Mode Matching Woes - Fibre issues 
|
Thu Jun 29 22:42:28 2017, awade, Update, WOPO, Mode Matching Woes - Fibre issues
|
Fri Jun 30 12:17:07 2017, Koji, Update, WOPO, Mode Matching Woes - Fibre issues
|
Sun Jul 2 19:47:35 2017, awade, Update, WOPO, Mode Matching Woes - Fibre issues
|
Sun Jul 2 21:21:39 2017, Koji, Update, WOPO, Mode Matching Woes - Fibre issues
|
Mon Jun 26 10:55:02 2017, Dhruva, Update, WOPO, Temperature Control of the PPKTP Waveguide 10x
|
Thu Jun 22 16:45:17 2017, Dhruva, Laser, WOPO, AdvR Waveguide Spec Sheet
|
Fri Jun 16 18:55:40 2017, Dhruva, Update, WOPO, Mode Matching the 1064nm Beam into fibre   
|
Fri May 26 18:29:59 2017, Dhruva, Laser, WOPO, Beam Profiling of Diabolo's 1064nm laser  
|
Mon Jun 12 17:18:19 2017, Dhruva, Laser, WOPO, Beam Profiling of Diabolo's 532nm laser
|
Tue Jun 13 16:45:38 2017, Dhruva, Laser, WOPO, Diabolo Profiling 
|
Fri Jun 9 16:58:35 2017, Dhruva, Update, WOPO, WOPO Experiment Stuff
|
Wed Jun 7 15:19:30 2017, Aidan, Electronics, Cameras, Two micron camera light-saber test of Pembroke Widy camera  
|
Wed Jun 7 15:30:46 2017, Aidan, Electronics, Cameras, Two micron camera light-saber test of Pembroke Widy camera
|
Thu May 18 12:46:08 2017, awade, Laser, WOPO, Initial testing Innolight Diabolo
|
Sun May 21 21:11:43 2017, awade, Laser, WOPO, Initial testing Innolight Diabolo
|
Thu May 25 16:28:21 2017, Dhruva, Laser, WOPO, Initial testing Innolight Diabolo
|
Fri Jun 2 15:16:00 2017, Dhruva, Laser, WOPO, Initial testing Innolight Diabolo
|
Thu Jun 1 19:04:14 2017, Dhruva, Computing, WOPO, Gaussian Beam Propagation Code 10x
|
Sat May 27 13:53:15 2017, awade, Aidan, Misc, 2micronLasers, Examining response of InGaAs CCD camera's at 2 um 13x
|
Fri Apr 21 15:37:36 2017, Steve, Lab Infrastructure, RF, 10 MHz reference distribution system planning
|
Tue May 23 10:15:31 2017, Steve, Lab Infrastructure, RF, 10 MHz reference distribution system planning
|
Tue May 23 15:19:48 2017, rana, Lab Infrastructure, RF, 10 MHz reference distribution system planning
|
Tue May 23 16:06:41 2017, Steve, Lab Infrastructure, RF, 10 MHz reference distribution system planning
|
Tue May 23 16:59:39 2017, rana, Lab Infrastructure, RF, 10 MHz reference distribution system planning
|
Thu May 25 11:26:45 2017, Steve, Lab Infrastructure, RF, 10 MHz reference distribution system planning
|
Thu May 18 08:28:07 2017, Eric Gustafson, Lab Infrastructure, RF, 10 MHz reference distribution system planning
|
Tue Nov 22 11:40:40 2016, awade, Lab Infrastructure, General, Lab flooding and AC control issues
|
Tue Nov 29 16:40:14 2016, awade, Lab Infrastructure, General, Lab flooding and AC control issues
|
Thu Dec 8 20:43:44 2016, rana, Lab Infrastructure, General, Lab flooding and AC control issues
|
Sun Dec 11 17:15:29 2016, awade, Lab Infrastructure, General, Lab flooding and AC control issues
|
Wed May 17 21:24:19 2017, awade, Lab Infrastructure, General, Turned mains breaks back on
|
Tue May 16 10:56:26 2017, awade, Misc, Purchases, SR785 (AST# C10240, SN 77060) returned from service
|
Mon May 15 17:52:42 2017, Dhruva, Laser, WOPO, SURF Day 1
|
Tue May 2 15:31:24 2017, Aidan, Computing, Cymacs, ATF Cymacs FB4 built - only OS and RTSCDS package right now
|
Tue May 2 08:26:30 2017, Aidan, Andrew, Laser, PD QE, QE of regular InGaAs photodetectors is 16ppm at 2004nm
|
Tue May 2 14:08:52 2017, Aidan, Andrew, Laser, PD QE, QE of regular InGaAs photodetectors is 16ppm at 2004nm
|
Wed Apr 19 14:34:10 2017, Aidan, Laser, TMTF, Eblana laser diode intensity noise spectra  
|
Thu Apr 20 13:26:23 2017, rana, Laser, TMTF, DET-10 thoughts
|
Tue May 2 11:11:16 2017, Aidan, Laser, TMTF, DET-10 intensity noise - round 2
|
Tue May 2 11:15:41 2017, Aidan, Laser, TMTF, DET-10 intensity noise - round 2
|
Fri Apr 28 13:54:35 2017, Aidan, Laser, PD QE, DET10D QE at 2004nm measured (it was 0.79)   
|
Wed Apr 26 18:40:30 2017, rana, Computing, General, ATF Wiki updated
|
Fri Apr 21 16:06:51 2017, Aidan, Electronics, Cameras, Phosphor coated camera shows ZERO response at 2004nm
|
Wed Apr 19 10:57:42 2017, rana, Laser, GYRO, laser to Liyuan
|
Tue Apr 11 16:13:38 2017, awade, Computing, PEM, Replaced batteries in newport datalogger unit PSL lab
|
Wed Apr 5 11:54:31 2017, Aidan, Computing, PEM, Temperature data being written to file
|
Sat Jan 28 13:02:40 2017, rana, Things to Buy, CDS, cheap DAQ
|
Wed Jan 25 11:41:55 2017, Aidan, Computing, Cymacs, Pulled old IO chassis and FB0
|
Tue Jan 3 16:27:41 2017, Aidan, Laser, TMTF, Two micron test facility - v1: mocked up and locked  
|
Tue Jan 3 20:15:12 2017, rana, Laser, TMTF, fiber based laser phase noise measurements
|
Tue Jan 3 23:32:33 2017, awade, Laser, TMTF, fiber based laser phase noise measurements
|
Fri Dec 16 12:41:50 2016, awade, Lab Infrastructure, General, Rain, lab checkup
|
Tue Jan 5 14:48:08 2016, rana, SafetyLab Infrastructure, HVAC, heating and cooling
|
Wed Nov 9 16:58:19 2016, awade, Lab Infrastructure, HVAC, heating and cooling
|
Thu Nov 10 21:33:38 2016, awade, Lab Infrastructure, HVAC, heating and cooling
|
Fri Nov 11 13:30:55 2016, awade, Lab Infrastructure, HVAC, heating and cooling
|
Thu Nov 10 19:04:28 2016, awade, Update, Scatterometer, Testing InGaAs camera 
|
Mon Oct 24 16:55:24 2016, awade, Things to Buy, Scatterometer, Summary of InGaAs cameras
|
Thu Sep 29 08:21:07 2016, Aidan, Laser, 2micronLasers, Two micron fiber set-up (dry run)  
|
Wed Oct 5 10:50:24 2016, rana, Laser, Fiber, frequency noise
|
Mon Jul 18 11:30:31 2016, awade, Misc, Scatterometer, Gathering parts: 1550 nm scatter rig
|
Wed Aug 3 18:46:13 2016, rana, Misc, Scatterometer, Gathering parts: 1550 nm scatter rig
|
Tue Aug 9 22:04:25 2016, awade, Misc, Scatterometer, Gathering parts: 1550 nm scatter rig
|
Thu Aug 11 12:23:49 2016, awade, Misc, Scatterometer, Gathering parts: 1550 nm scatter rig 
|
Mon Sep 19 21:07:21 2016, awade, Misc, Scatterometer, Gathering parts: 1550 nm scatter rig  
|
Tue Sep 20 22:19:54 2016, rana, Misc, Scatterometer, Gathering parts: 1550 nm scatter rig
|
Tue Oct 4 12:05:05 2016, awade, Misc, Scatterometer, Gathering parts: 1550 nm scatter rig  
|
Mon Aug 8 17:05:28 2016, rana, Misc, General, Raspberry Pi beam profiles: possible student project
|
Tue Aug 16 16:01:21 2016, awade, Misc, General, Raspberry Pi beam profiles: possible student project
|
Mon Aug 8 00:31:59 2016, rana, Computing, General, Wiki upgrade
|
Mon Aug 1 15:33:25 2016, Aidan, Misc, ANTS!, It's summer. The ants are back. I have laid down some ant bait
|
Sun Jul 31 09:06:43 2016, Aidan, Computing, TempCtrl, Template PID servo script from eLIGO days
|
Thu Jul 28 16:44:18 2016, awade, Laser, Purchases, Received 2 um FC laser diode
|
Mon Jul 18 17:15:17 2016, awade, Misc, Purchases, Received 2 um FC/APC fiber coupled Faraday  
|
Fri Jul 1 20:02:44 2016, awade, Misc, Scatterometer, Starting on the Si scatter measurements.
|
Wed Jun 29 17:16:38 2016, Zach, Misc, General, Gyro optics lent to Den @ MIT
|
Wed Jun 22 13:42:38 2016, awade, Misc, , New silicon sample (8616P Tang) arrived: initial unbox and check 12x
|
Mon Mar 7 15:34:46 2016, KojiN, Misc, PD QE, Back reflection measurement with the chopper 
|
Mon Mar 7 15:47:03 2016, KojiN, Misc, PD QE, Back reflection measurement with the chopper
|
Tue Mar 1 09:55:28 2016, KojiN, Misc, PD QE, Estimation of the back scattering  
|
Sun Mar 6 10:19:14 2016, KojiN, Misc, PD QE, Estimation of the back scattering   
|
Sun Mar 6 02:25:47 2016, Koji, Misc, General, PD glass reflections
|
Tue Mar 1 09:12:51 2016, KojiN, Misc, PD QE, Measurement of the BRDF with the Iris in the incident path 
|
Wed Mar 2 10:17:56 2016, KojiN, Misc, PD QE, Measurement of the BRDF with the Iris in the incident path  
|
Sat Mar 5 01:42:02 2016, KojiN, Misc, PD QE, Measurement of the BRDF with the Iris in the incident path
|
Fri Mar 4 16:18:45 2016, Koji, Misc, General, Photos of the experiment
|
Fri Feb 19 20:15:03 2016, KojiN, Misc, PD QE, Measurement of the reflectivity, EQE, and IQE of the PD without glass window    
|
Mon Feb 29 08:19:53 2016, KojiN, Misc, PD QE, Measurement of the reflectivity, EQE, and IQE of the PD without glass window 
|
Wed Mar 2 14:38:31 2016, KojiN, Misc, PD QE, Measurement of the reflectivity, EQE, and IQE of the PD without glass window 
|
Wed Mar 2 13:07:36 2016, KojiN, Misc, PD QE, Distance between the 1st incident beam and the 2nd reflected beam
|
Fri Feb 26 23:13:02 2016, KojiN, Misc, PD QE, BRDF measurement around the peak 
|
Sun Feb 28 15:47:06 2016, KojiN, Misc, PD QE, BRDF measurement around the peak    
|
Fri Feb 26 10:00:18 2016, KojiN, Misc, PD QE, BEDF measurement for wide angle   
|
Wed Feb 24 23:51:07 2016, KojiN, Misc, PD QE, Test of the BRDF measurement    
|
Wed Feb 24 08:18:06 2016, KojiN, Misc, PD QE, Systematic error of the power meter (RM9, Ophir)
|
Tue Feb 23 00:22:01 2016, KojiN, Misc, PD QE, Re-measurement of the QE of the PD without window glass 6x
|
Mon Feb 22 23:51:18 2016, KojiN, Misc, PD QE, Beam shape reflected by the PD 
|
Sun Feb 21 22:02:01 2016, Koji Antonio,, Misc, PD QE, PD window removal few notes  
|
Fri Feb 19 20:25:14 2016, KojiN, Misc, PD QE, Measurement of the enhanced QE of the PD without glass window    
|
Sun Feb 21 14:27:24 2016, rana, Misc, PD QE, Measurement of the enhanced QE of the PD without glass window
|
Sun Feb 21 21:16:10 2016, KojiN, Misc, PD QE, Measurement of the enhanced QE of the PD without glass window
|
Sun Feb 21 21:53:04 2016, KojiN, Misc, PD QE, Measurement of the enhanced QE of the PD without glass window
|
Fri Feb 19 00:39:24 2016, KojiN, Misc, PD QE, First QE measurement with the reflector 
|
Thu Feb 18 08:12:53 2016, KojiN, Misc, PD QE, Re-measurement of the reflectivities and the EQEs of the PD for S-pol and P-pol 
|
Thu Feb 18 13:39:33 2016, Koji, Misc, PD QE, Re-measurement of the reflectivities and the EQEs of the PD for S-pol and P-pol
|
Fri Feb 19 00:01:36 2016, KojiN, Misc, PD QE, Re-measurement of the reflectivities and the EQEs of the PD for S-pol and P-pol 6x
|
Tue Feb 16 23:51:31 2016, KojiN, Misc, PD QE, Re-measurement of the PD efficiencies for P-pol. and S-pol.    
|
Sun Feb 14 01:04:07 2016, KojiN, Misc, PD QE, Measurement of PD reflectivities and PD efficiencies for P-pol. and S-pol.  
|
Thu Feb 11 23:54:48 2016, KojiN, Misc, PD QE, Polarization measurement 
|
Thu Feb 11 00:03:24 2016, KojiN, Misc, PD QE, Beam Adjustment   
|
Wed Feb 10 00:17:31 2016, KojiN, Misc, PD QE, Alignment of the single mode fiber and re-measurement of the beam profile  
|
Tue Feb 9 00:00:11 2016, KojiN, Misc, PD QE, Measurement of a beam profile  
|
Fri Feb 5 21:06:14 2016, KojiN, Misc, PD QE, Initial alignment of optics
|
Thu Feb 4 21:23:31 2016, KojiN, Misc, PD QE, Preparation of some components
|
Wed Sep 16 04:43:35 2015, Koji, Misc, Seismometer, IP test at the 40m    
|
Mon Aug 31 20:32:57 2015, Alessandra, Misc, Seismometer, IP final parameters 
|
Thu Aug 27 15:09:12 2015, Alessandra, Misc, Seismometer, IP measurements   
|
Sat Aug 22 18:36:50 2015, Alessandra, Misc, Seismometer, Temperature stabilization 
|
Fri Aug 21 22:59:00 2015, Koji, Misc, Seismometer, Started continuous data taking
|
Wed Aug 19 19:14:03 2015, Alessandra, Misc, Seismometer, Thermal enclosure tests 
|
Thu Aug 13 18:55:27 2015, Alessandra, Misc, Seismometer, Parameters for the new shape of the IP    
|
Thu Aug 13 13:12:48 2015, Rich Abbott, Electronics, FSS, TTFSS Fieldbox, Mysteries Revealed
|
Wed Aug 12 16:28:20 2015, Megan, Misc, Seismometer, Michelson layout diagram - Final (?) version
|
Wed Aug 12 16:04:22 2015, Megan, Misc, Seismometer, Light through fiber + beam scans   
|
Wed Aug 12 14:04:47 2015, Alessandra, Misc, Seismometer, Breadboard and IP top mass dimentions 
|
Mon Aug 10 11:15:28 2015, Megan, Misc, Seismometer, Second Michelson layout diagram
|
Sat Aug 8 19:05:38 2015, Koji, Misc, General, Inverted pendulum 10mm rod holder
|
Fri Aug 7 10:39:44 2015, Megan, Misc, Seismometer, Michelson layout diagram
|
Wed Aug 5 15:20:44 2015, Megan, Misc, Seismometer, Enclosure has feet! 6x
|
Tue Aug 4 17:22:40 2015, Megan, Misc, Seismometer, Thermal enclosure progress  
|
Tue Aug 4 16:13:03 2015, Alessandra, Misc, Seismometer, IP parameters 
|
Tue Aug 4 10:43:21 2015, Aidan, Computing, General, FB0 unresponsive. Rebooting.
|
Fri Jul 31 15:21:19 2015, Alessandra, Misc, Seismometer, QPD calibration   
|
Thu Jul 30 16:35:00 2015, Megan, Misc, Seismometer, Initial test of new heaters 
|
Tue Jul 28 16:32:38 2015, Alessandra, Misc, Seismometer, IP spring constant and resonant frequency    
|
Mon Jul 27 16:15:24 2015, Megan, Misc, Seismometer, DB 25 Punches
|
Fri Jul 24 15:55:05 2015, Megan, Misc, Seismometer, Mini thermal enclosure test   
|
Fri Jul 24 17:59:39 2015, rana, Misc, Seismometer, Mini thermal enclosure test
|
Thu Jul 23 17:11:18 2015, Arjun, Misc, PD noise, CMRR of the PDs
|
Thu Jul 23 16:35:05 2015, Arjun, Misc, PD noise, PD noise update 
|
Thu Jul 16 18:28:53 2015, Arjun, Misc, PD noise, PD noise update   
|
Fri Jul 17 18:12:36 2015, rana, Misc, PD noise, PD noise update
|
Sat Jul 18 22:24:08 2015, Arjun, Misc, PD noise, PD noise update
|
Fri Jul 17 11:29:57 2015, Alessandra, Misc, Seismometer, QPD calibration
|
Fri Jul 17 11:51:46 2015, Koji, Misc, Seismometer, QPD calibration
|
Wed Jul 15 23:17:14 2015, Alessandra, Misc, Seismometer, Rhomboid motion  
|
Thu Jul 16 10:21:39 2015, Koji, Misc, Seismometer, Optical lever installation (Re: Rhomboid motion)
|
Wed Jul 15 22:14:19 2015, Arjun, Misc, PD noise, Intensity Servo design
|
Wed Jul 15 16:32:50 2015, Megan, Misc, Seismometer, More enclosure sides done 
|
Wed Jul 15 15:45:04 2015, Arjun, Misc, PD noise, Intensity Servo design  
|
Wed Jul 15 13:40:38 2015, Arjun, Misc, PD noise, Intensity stabilization servo
|
Wed Jul 15 11:29:11 2015, Megan, Misc, Seismometer, Thermal housing walls progress  
|
Tue Jul 14 20:55:50 2015, Arjun, Misc, PD noise, Some thoughts on the intensity stabilization servo
|
Tue Jul 14 13:49:56 2015, Megan, Misc, Seismometer, Seismometer thermal housing taking shape    
|
Mon Jul 13 16:47:46 2015, Arjun, Misc, PD noise, Noise Plots 6x
|
Sun Jul 12 02:00:15 2015, Arjun, Misc, PD noise, PD noise Update    
|
Fri Jul 10 00:59:49 2015, Arjun, Misc, PD noise, PD-noise update 6x
|
Thu Jul 9 14:35:30 2015, Alessandra, Misc, Seismometer, Inverted pendolum
|
Thu Jul 9 10:29:49 2015, Megan, Misc, Seismometer, Heater test, more panel work  
|
Thu Jul 9 09:51:49 2015, Alastair, Kate, Megan, Misc, Seismometer, New upper clamp   
|
Thu Jul 9 00:37:35 2015, Kate, Alessandra, Electronics, Seismometer, PCB  
|
Wed Jul 8 18:32:51 2015, Arjun, Misc, PD noise, PD noise update 6x
|
Tue Jul 7 11:48:21 2015, Alastair, Kate, Megan, Misc, Seismometer, Drawings for upper clamp  
|
Mon Jul 6 19:52:28 2015, Kate, Alastair, Megan, Misc, Seismometer, Ideas for new pin vise clamp
|
Mon Jul 6 17:10:54 2015, Megan, Misc, Seismometer, Holes drilled in aluminum sheeting 
|
Mon Jul 6 13:27:48 2015, rana, Misc, Seismometer, Inverted Pendulum links
|
Mon Jul 6 08:15:53 2015, rana, Misc, TempCtrl, temperature noise plot
|
Wed Jul 1 17:31:16 2015, Arjun, Misc, PD noise, Updates on PD noise setup   
|
Tue Jun 30 16:24:06 2015, Megan, Kate, Misc, Seismometer, Rhomboid is suspended  
|
Fri Jun 26 18:02:17 2015, Kate, Alastair, Megan, Misc, Seismometer, Suspension attempt
|
Tue Jun 30 15:43:49 2015, Steve, Misc, Seismometer, pin vises
|
Tue Jun 9 19:39:03 2015, Koji, Electronics, General, Nick Lockerbie's precision current driver
|
Mon Jun 29 21:28:46 2015, Koji, Electronics, General, 2ch Photo Sensor circuit    
|
Mon Jun 29 16:59:47 2015, Arjun, Misc, PD noise, Pre-stabilisation of laser 6x
|
Mon Jun 29 11:13:21 2015, Megan, Misc, Seismometer, Time constant for heating the seismometer frame
|
Fri Jun 26 13:41:28 2015, Megan, Misc, Seismometer, More on the seismometer frame 
|
Fri Jun 26 17:32:16 2015, Kate, Misc, Seismometer, More on the seismometer frame
|
Fri Jun 26 11:19:24 2015, Megan, Misc, Seismometer, Thermal Calculations for Seismometer Housing
|
Thu Jun 25 18:31:11 2015, Arjun, Misc, PD noise, Resistor noise measurements using the cross correlation method 7x
|
Thu Jun 25 15:36:54 2015, Arjun, Misc, PD noise, Updates on PD noise setup 9x
|
Thu Jun 25 15:22:19 2015, Kate, Misc, Seismometer, More thermal enclosure parts purchased
|
Wed Jun 24 17:02:03 2015, Megan, Misc, Seismometer, Further details on seismometer design
|
Tue Jun 23 11:34:28 2015, Kate, Misc, Seismometer, Upper pin vise clamp (drawing)
|
Mon Jun 22 18:22:26 2015, Arjun, Misc, PD noise, Cross-Correlation scheme to calculate PD noise 13x
|
Sat Jun 20 00:47:40 2015, Arjun , Misc, PD noise, Setting up of mechanical parts for PD noise measurement  ![Screenshot_2015-06-20-01-05-14[1].png Screenshot_2015-06-20-01-05-14[1].png](attachment.png)
|
Fri Jun 19 18:29:31 2015, Megan, Misc, Seismometer, Building the seismometer frame
|
Wed May 20 21:33:36 2015, rana, Misc, Seismometer, Thermal Enclosure concept
|
Tue Jun 16 17:09:46 2015, rana, Misc, Seismometer, Thermal Enclosure concept
|
Fri Jun 19 16:54:39 2015, Kate, Misc, Seismometer, Thermal Enclosure concept
|
Wed Jun 17 18:05:42 2015, Arjun, Electronics, PD noise, Resistor noise observations,analysis and inference 25x
|
Thu Jun 18 22:24:31 2015, rana, Electronics, PD noise, Resistor noise observations,analysis and inference
|
Tue Jun 16 01:26:11 2015, Stephanie, Kate, Misc, Seismometer, CAD of Updated Assembly and Thermal Enclosure   
|
Fri Jun 12 20:17:39 2015, Stephanie, Kate, Misc, Seismometer, Equal Lengthed Wires  
|
Wed Jun 10 13:48:22 2015, Kate, Computing, Computing, WS1 log in problem
|
Fri Jun 12 12:23:14 2015, Kate, Computing, Computing, WS1 log in problem
|
Thu Jun 11 22:43:08 2015, Stephanie, Kate, Misc, Seismometer, Rhomboid Suspension Using Two Wires (Shorter Distance at Top)
|
Mon Jun 1 18:26:01 2015, rana, Lab Infrastructure, HVAC, hot spots in lab - hot air coming from Gyro table HEPA
|
Mon Jun 8 16:30:24 2015, Kate, Lab Infrastructure, HVAC, hot spots in lab - hot air coming from Gyro table HEPA
|
Sat Jun 6 01:52:14 2015, Stephanie, Kate, Misc, Seismometer, Rhomboid Suspension Using Two Wires   
|
Wed Jun 3 15:05:19 2015, Koji, Electronics, Seismometer, QPD matrix circuit   
|
Wed May 27 22:51:11 2015, Kate, Misc, Seismometer, Inverted pendulum design
|
Fri May 15 22:34:32 2015, Kate, Misc, Seismometer, Rhomboid de-suspended for now 
|
Thu May 14 20:23:59 2015, Stephanie, Kate, Misc, Seismometer, The rhomboid is suspended  
|
Sat May 9 13:30:58 2015, Stephanie, Kate, Misc, Seismometer, ANSYS Videos and Building Update   
|
Mon May 11 18:38:14 2015, rana, Misc, Seismometer, ANSYS Videos and Building Update
|
Thu Apr 30 21:41:38 2015, Kate, Misc, Seismometer, Analytic estimate of primary mass moments of inertia and frequencies
|
Wed Apr 29 17:57:38 2015, Kate, Misc, Seismometer, Preliminary Michelson design to prompt discussion
|
Sat Apr 25 00:21:30 2015, Stephanie, Kate, Misc, Seismometer, Modal Frequency Simulation
|
Thu Apr 16 15:21:11 2015, Kate, Alastair, Misc, Seismometer, Fiber pulling lesson (belated entry)
|
Wed Feb 18 21:08:56 2015, Stephanie, Kate, Misc, Seismometer, Finding Modal Frequencies of Frame 
|
Fri Feb 20 16:58:55 2015, Stephanie, Kate, Misc, Seismometer, Finding Modal Frequencies of Frame 
|
Sun Feb 22 01:49:11 2015, rana, Misc, Seismometer, Finding Modal Frequencies of Frame
|
Tue Feb 24 11:33:28 2015, Stephanie, Kate, Misc, Seismometer, Finding Modal Frequencies of Frame 
|
Wed Feb 25 18:03:42 2015, Stephanie, Kate, Misc, Seismometer, Finding Modal Frequencies of Frame  
|
Wed Apr 1 17:21:44 2015, Stephanie, Kate, Misc, Seismometer, Finding Modal Frequencies of Frame    
|
Fri Apr 3 16:22:12 2015, Steve, Misc, Seismometer, PZT buzzer
|
Thu Apr 2 23:24:19 2015, Kate, Stephanie, Misc, Seismometer, Design of low rotational freq. mass 
|
Mon Mar 9 18:57:21 2015, Kate, Stephanie, Misc, Seismometer, Updated tilt-free seismometer design concept  
|
Wed Mar 11 15:12:51 2015, Kate, Stephanie, Misc, Seismometer, Updated tilt-free seismometer design concept  
|
Tue Feb 10 22:15:42 2015, Kate, Misc, Seismometer, Seismometer mass and pin vise clamp  
|
Wed Feb 4 18:09:22 2015, Kate, Misc, Seismometer, Some Mathematica modeling for a driven, suspended block  
|
Fri Feb 6 13:10:22 2015, Kate, Misc, Seismometer, Some Mathematica modeling for a driven, suspended block   
|
Thu Jan 29 15:54:26 2015, Kate, Misc, Seismometer, Seismometer work update 
|
Wed Feb 4 17:53:58 2015, Kate, Misc, Seismometer, Seismometer work update 
|
Wed Feb 4 16:56:38 2015, Stephanie, Kate, Computing, Seismometer, Frame Design Comparisons   
|
Mon Jan 26 15:58:18 2015, Kate, Misc, Seismometer, Determining tilt/translation couplings 
|
Fri Jan 23 15:46:13 2015, Kate, Alastair, Misc, Seismometer, Steel wire for seismometer
|
Fri Jan 23 15:33:46 2015, Kate, Alastair, Misc, Seismometer, Pin vise holder, version 1
|
Wed Jan 21 15:27:08 2015, Kate, Misc, Seismometer, 1 dof seismometer noise budget   
|
Thu Jan 15 09:01:25 2015, Stephanie, Kate, Computing, Seismometer, CAD and FEA for Seismometer 
|
Wed Dec 3 14:28:53 2014, Zach, Electronics, M2 ISS, M2 bias/readout board evaluation
|
Wed Dec 3 19:37:09 2014, Zach, Electronics, M2 ISS, LT1128 current noise  
|
Tue Dec 23 19:58:49 2014, rana, Electronics, M2 ISS, M2 bias/readout board evaluation
|
Fri Dec 19 12:22:37 2014, rana, Lab Infrastructure, General, overhead lights
|
Tue Dec 16 21:36:07 2014, Kate, Laser, , Fiber coupler work
|
Wed Dec 3 18:31:15 2014, Kate, Lab Infrastructure, , First tilt-free seismometer entry
|
Fri Nov 21 01:31:58 2014, Zach, Electronics, M2 ISS, Board stuffed, testing begun  
|
Wed Nov 26 17:46:28 2014, Zach, Electronics, M2 ISS, Board stuffed, testing begun
|
Wed May 21 11:11:08 2014, Evan, Things to Buy, PMC, 1064 nm PMC specs 
|
Sun Aug 17 15:49:22 2014, Evan, Things to Buy, PMC, 1064 nm PMC
|
Mon Aug 4 10:27:45 2014, Evan, Electronics, FSS, LTSpice simulation of AD829 inverters  
|
Thu Jun 26 14:48:58 2014, Zach, Laser, stuff happens, Calibration error ruins the day
|
Thu Jun 19 04:55:40 2014, Zach, Electronics, GYRO, Marconi noise via digital PLL  
|
Fri Jun 20 16:37:13 2014, Zach, Electronics, GYRO, Marconi noise via digital PLL  
|
Sat Jun 21 01:15:39 2014, Zach, Electronics, GYRO, Marconi noise measurement verification
|
Sun Jun 22 12:38:44 2014, rana, Electronics, GYRO, Marconi noise measurement verification
|
Mon Jun 23 14:16:35 2014, Zach, Electronics, GYRO, Marconi noise measurement verification
|
Tue Jun 24 10:47:35 2014, rana, Electronics, GYRO, Marconi noise measurement verification
|
Tue Jun 24 19:13:35 2014, Zach, Electronics, GYRO, Marconi noise measurement verification
|
Wed Jun 18 02:55:09 2014, Zach, Laser, GYRO, Gyro noise better by 10x *NOPE* 
|
Thu Jun 19 00:51:54 2014, Koji, Laser, GYRO, Gyro noise better by 10x *NOPE*
|
Fri Jun 20 09:19:41 2014, rana, Laser, GYRO, Gyro noise better by 10x *NOPE*
|
Fri Jun 13 02:18:48 2014, Zach, Laser, GYRO, Intensity noise from shifted beam
|
Mon May 19 03:48:10 2014, Zach, Laser, GYRO, Seismometer filtering 
|
Mon May 19 22:19:21 2014, rana, Laser, GYRO, Seismometer filtering
|
Thu May 15 15:26:23 2014, Zach, Laser, GYRO, Seismometers foamified 7x
|
Mon May 5 20:08:59 2014, Zach, Laser, GYRO, Can't make good seismometer data anymore
|
Sat Apr 12 01:58:05 2014, Zach, Laser, GYRO, Gyro appears limited by true rotation  
|
Thu Apr 17 14:05:46 2014, not Zach, Laser, GYRO, Gyro appears limited by true rotation
|
Tue Apr 22 23:55:36 2014, Zach, Laser, GYRO, Gyro appears limited by true rotation
|
Fri Mar 28 20:22:04 2014, Zach, Laser, GYRO, Gyro NPRO controller bad?
|
Mon Mar 31 17:53:22 2014, Evan, Laser, GYRO, Gyro NPRO controller bad?
|
Wed Mar 26 20:33:13 2014, Zach, Laser, GYRO, or: laser problems
|
Fri Mar 28 15:05:50 2014, Evan, Laser, GYRO, or: laser problems
|
Sun Mar 30 21:33:48 2014, Zach, Laser, GYRO, or: laser problems
|
Thu Mar 27 23:18:54 2014, Zach, Laser, GYRO, AOM ISS 
|
Wed Mar 26 15:56:02 2014, Zach, Laser, GYRO, Gyro update  
|
Tue Mar 18 23:27:53 2014, Zach, Laser, GYRO, CTN light piped through fiber
|
Sun Mar 23 00:32:21 2014, not Zach, Laser, GYRO, CTN light piped through fiber
|
Mon Mar 24 03:52:16 2014, Zach, Laser, GYRO, CTN light piped through fiber
|
Fri Mar 21 13:50:03 2014, Zach, Laser, GYRO, Primary (CCW) RAM monitor using Gyro RFPD #3 
|
Thu Mar 20 02:18:13 2014, Zach, Laser, GYRO, Gyro-CTN beat recovered  
|
Fri Mar 14 18:13:09 2014, Zach, Laser, GYRO, Digital CW loop    
|
Fri Mar 14 19:26:09 2014, Zach, Laser, GYRO, Digital CW loop 
|
Fri Mar 14 18:33:40 2014, Zach, Laser, GYRO, TO DO
|
Thu Mar 13 02:43:10 2014, Zach, Laser, GYRO, Noise nearly explained by known sources
|
Wed Mar 5 16:08:25 2014, Zach, Laser, GYRO, RAM PD requirements
|
Tue Feb 18 16:25:16 2014, Zach, Laser, GYRO, Best ever gyro noise, again    
|
Fri Feb 14 03:19:06 2014, Zach, Laser, GYRO, Gyro back to life 
|
Wed Feb 12 02:11:35 2014, Zach, Laser, GYRO, Gyro revival   
|
Thu Sep 12 13:16:38 2013, Evan, Lab Infrastructure, General, Extreme Makeover: ATF Edition
|
Tue Sep 17 14:19:40 2013, Steve, Lab Infrastructure, General, use clean cover to keep optics clean
|
Mon Jun 3 18:57:34 2013, rana, Computing, General, How to make high quality plots in Matlab
|
Sat Jun 8 10:40:15 2013, Aidan, Computing, General, How to make high quality plots in Matlab
|
Fri May 31 21:46:19 2013, Zach, Laser, GYRO, Noise evolution, 2010-2013
|
Fri May 31 13:30:48 2013, Zach, Computing, DAQ, atf lookback time is ~1 week
|
Thu May 30 11:09:08 2013, Zach, Laser, GYRO, ISS does no good 
|
Thu May 30 11:01:09 2013, Zach, Laser, GYRO, Noise vs power    
|
Thu May 30 09:07:40 2013, Zach, Laser, GYRO, Seismometer correlation   
|
Wed May 29 17:32:06 2013, Evan, Electronics, GYRO, Shortened delay line
|
Thu May 23 15:43:51 2013, Evan, Laser, GYRO, Increased gyro power
|
Tue May 28 18:34:11 2013, Evan, Laser, GYRO, Decreased gyro power
|
Fri May 24 19:12:07 2013, Evan, Laser, Fiber, Beat temperatures
|
Thu May 16 22:34:13 2013, Evan, Electronics, Fiber, Beat delay line: transfer function and noise spectrum 
|
Thu May 23 16:05:55 2013, Evan, Electronics, Fiber, Beat delay line: transfer function and noise spectrum
|
Thu May 23 09:48:46 2013, Zach, Laser, GYRO, RAM subtraction
|
Wed May 22 02:17:00 2013, Zach, Laser, GYRO, Long-term data 
|
Mon May 20 22:44:04 2013, Koji, Misc, General, Thorlabs power meter @56Lab
|
Sun May 19 03:52:15 2013, Zach, Laser, GYRO, CTN PMC, ACAV relocked--can't find gyro beat
|
Sun May 19 13:07:15 2013, Evan, Laser, GYRO, CTN PMC, ACAV relocked--can't find gyro beat
|
Sun May 19 18:41:04 2013, Zach, Laser, GYRO, CTN PMC, ACAV relocked--can't find gyro beat
|
Sun May 19 19:48:30 2013, Evan, Laser, GYRO, CTN PMC, ACAV relocked--can't find gyro beat
|
Sun May 19 06:11:44 2013, Zach, Laser, GYRO, Low frequency still a mystery
|
Fri May 17 03:34:38 2013, Zach, Misc, GYRO, Huddle testing underway 
|
Fri May 17 02:54:15 2013, Zach, Laser, GYRO, IT'S ALIVE!! (Or, How the Gyro Learned to Lock Itself) 
|
Thu May 16 04:34:27 2013, Zach, Laser, GYRO, Gyro locking via digital control 
|
Wed May 15 04:21:13 2013, Zach, Electronics, GYRO, PDH2 board fully CDS integrated (finally)
|
Wed May 15 00:58:17 2013, Zach, Laser, GYRO, Switched the PMC dither back to analog 
|
Tue May 14 21:40:38 2013, Zach, Computing, GYRO, PMC autolocker
|
Tue May 14 02:00:51 2013, Zach, Computing, DAQ, Digital PMC servo
|
Mon May 13 15:33:33 2013, Evan, Electronics, General, Generic filter board now has G = 10 inverter with 28.8 kHz low pass 
|
Mon May 13 14:08:26 2013, Zach, Computing, DAQ, C2ATF model rebuilt
|
Sun May 12 18:43:21 2013, Zach, Laser, GYRO, Gyro up again, but not behaving itself very well
|
Wed May 1 00:05:49 2013, Evan, Electronics, Fiber, Beat delay line transfer function 
|
Wed May 1 12:01:15 2013, Zach, Electronics, Fiber, Beat delay line transfer function
|
Wed May 1 13:55:29 2013, Evan, Electronics, Fiber, Beat delay line transfer function
|
Wed May 1 21:47:20 2013, rana, Electronics, Fiber, Beat delay line transfer function
|
Wed May 1 23:36:24 2013, Evan, Electronics, Fiber, Beat delay line transfer function
|
Thu May 2 12:50:17 2013, Zach, Electronics, Fiber, Beat delay line transfer function
|
Thu May 2 23:39:08 2013, Evan, Electronics, Fiber, Beat delay line transfer function
|
Fri May 3 01:15:15 2013, rana, Electronics, Fiber, Beat delay line transfer function
|
Fri May 3 13:45:34 2013, Zach, Electronics, Fiber, Beat delay line transfer function
|
Fri May 3 17:34:25 2013, Evan, Electronics, Fiber, Beat delay line transfer function
|
Thu Apr 18 13:19:11 2013, Zach, Misc, GYRO, Throwback Thursday
|
Tue Apr 16 16:50:55 2013, Zach, Laser, GYRO, How to run the gyro 
|
Fri Apr 12 23:35:55 2013, Zach, Laser, GYRO, OOL RAM monitors set up
|
Fri Apr 12 04:34:54 2013, Zach, Laser, GYRO, New best low-frequency gyro noise
|
Thu Apr 11 21:01:51 2013, Evan, Laser, Fiber, Found CTN/ATF beat
|
Thu Apr 11 02:02:35 2013, Evan, Laser, Fiber, Fiber coupling at 10%; polarization roughly aligned 
|
Tue Apr 9 01:59:33 2013, Zach, Laser, GYRO, Previous best performance recovered
|
Wed Apr 10 02:50:39 2013, Zach, Laser, GYRO, Current noise budget
|
Mon Apr 8 09:37:03 2013, Zach, Laser, GYRO, gyro gyroing again  
|
Mon Apr 8 18:41:12 2013, gyrobot, Laser, GYRO, gyro gyroing again
|
Sat Apr 6 19:03:35 2013, Zach, Laser, GYRO, HVAC sucks
|
Fri Apr 5 21:17:23 2013, Zach, Laser, GYRO, Primary OLTF, plus: PMC not working now
|
Sat Apr 6 15:01:03 2013, Zach, Laser, GYRO, PMC, gyro primary now locking again robustly
|
Thu Apr 4 14:39:23 2013, Zach, Laser, GYRO, Primary locked
|
Thu Apr 4 01:15:55 2013, Zach, Laser, GYRO, Stuff that happened last week...   
|
Mon Mar 25 20:11:26 2013, Koji, Misc, General, Thorlabs power meter & WinCamD @56Lab
|
Wed Mar 20 17:46:43 2013, Koji, Laser, Doubling, Moved NPRO from ATF to the 40M
|
Wed Mar 20 16:50:12 2013, Zach, Laser, GYRO, Gyro resurrection plan
|
Tue Dec 18 19:01:29 2012, Koji, Misc, PMC, Impact Hammaring of Gyro Metal PMC
|
Mon Nov 5 13:12:53 2012, Aidan, Computing, Computing, TCS aLIGO Real-Time model
|
Sat Nov 3 13:20:27 2012, Aidan, Computing, Computing, Re-compiled Real Time Model with TCS channels
|
Fri Oct 19 18:07:10 2012, Koji, Lab Infrastructure, PEM, A huge current driver and coil magnet actuators are missing
|
Sat Oct 13 00:32:27 2012, Koji, Things to Buy, General, Things to buy
|
Tue Oct 2 22:28:32 2012, Zach, Laser, GYRO, gyro frequency noise monitor set up
|
Fri Oct 5 04:40:51 2012, rana, Laser, GYRO, gyro frequency noise monitor set up
|
Fri Sep 28 01:15:16 2012, Zach, Laser, GYRO, Beat stuff
|
Wed Sep 26 03:31:51 2012, Zach, Laser, GYRO, PSL/Gyro beat setup
|
Thu Sep 27 03:33:55 2012, tara, Laser, GYRO, PSL/Gyro beat setup
|
Thu Sep 27 02:44:34 2012, Zach, Laser, GYRO, Lock too unstable
|
Wed Sep 19 03:51:01 2012, Zach, Laser, GYRO, Stuff that happened today (and didn't)
|
Wed Sep 19 03:41:21 2012, Zach, Laser, GYRO, Cataloguing, etc. 
|
Mon Sep 17 17:22:36 2012, Zach, Electronics, GYRO, TEST channel noise reduced with AA filter
|
Thu Sep 13 02:59:17 2012, Zach, Electronics, GYRO, Excess demod noise
|
Thu Sep 13 10:20:36 2012, rana, Electronics, GYRO, Excess demod noise
|
Thu Sep 13 11:47:54 2012, Zach, Electronics, GYRO, Excess demod noise
|
Wed Sep 12 20:56:59 2012, tara, Electronics, General, seismometers installed   
|
Mon Sep 10 14:26:06 2012, Zach, Laser, GYRO, Not RAM-like noise
|
Fri Sep 7 03:33:03 2012, Zach, Laser, GYRO, Anatomy of the current noise floor 
|
Fri Sep 7 02:56:08 2012, Zach, Laser, GYRO, PLL noise matches AOM_ACT noise 
|
Thu Sep 6 06:06:46 2012, Zach, Laser, GYRO, NEW BEST gyro noise, without subtraction
|
Thu Sep 6 12:33:46 2012, Koji, Laser, GYRO, NEW BEST gyro noise, without subtraction
|
Wed Sep 5 13:03:01 2012, Zach, Electronics, GYRO, Better Marconi noise measurement 
|
Tue Sep 4 01:28:57 2012, Zach, Electronics, GYRO, Marconi phase noise vs deviation
|
Tue Sep 4 10:31:50 2012, rana, Electronics, GYRO, Marconi phase noise vs deviation
|
Tue Sep 4 15:14:02 2012, Zach, Electronics, GYRO, Marconi phase noise vs deviation
|
Tue Sep 4 01:41:00 2012, Zach, Laser, GYRO, BEST gyro sensitivity ever with RAM subtraction 
|
Wed Aug 29 21:15:28 2012, Zach, Laser, GYRO, Hasty noise budget, realizations (most good)
|
Wed Aug 29 20:00:32 2012, Zach, Laser, GYRO, HELP: PMC
|
Wed Aug 29 18:12:00 2012, Zach, Electronics, GYRO, low-noise preamp finished; op amp wisdom 6x
|
Tue Aug 28 17:39:50 2012, Zach, Laser, GYRO, Primary signals and mechanical noise estimates 
|
Tue Aug 28 06:03:35 2012, Zach, Laser, GYRO, Primary locked with PDH2, current OLTF  
|
Tue Aug 28 05:43:35 2012, Zach, Electronics, GYRO, PDH2 7371 fixed   
|
Fri Aug 24 01:55:12 2012, Zach, Laser, GYRO, PDH2 locking attempts  
|
Fri Aug 24 02:29:23 2012, Zach, Laser, GYRO, PDH2 locking attempts 
|
Fri Aug 24 15:47:22 2012, rana, Laser, GYRO, PDH2 locking attempts
|
Sat Aug 25 00:11:02 2012, Zach, Laser, GYRO, PDH2 locking attempts
|
Fri Aug 24 01:32:21 2012, Zach, Laser, GYRO, EOM stabilized with Daedalus  
|
Wed Aug 22 01:17:07 2012, Zach, Electronics, GYRO, PDH2 modified; still can't lock primary   
|
Tue Aug 21 23:29:38 2012, tara, Misc, TempCtrl, thermal insulation for cold finger and EOM  
|
Tue Aug 21 04:54:26 2012, Zach, Electronics, GYRO, Attempted "very fast" path 
|
Tue Aug 21 04:13:06 2012, Zach, Electronics, GYRO, PDH2 transfer functions are really stupid
|
Mon Aug 20 04:36:28 2012, Zach, Laser, GYRO, TRANS and PLL set up 
|
Mon Aug 20 04:25:41 2012, Zach, Laser, GYRO, RAM witnesses for both directions
|
Mon Aug 20 04:10:25 2012, Zach, Electronics, GYRO, Ultra-low-noise preamp built (almost) 
|
Fri Aug 17 19:59:28 2012, tara, Electronics, TempCtrl, temp control for EOM
|
Fri Aug 17 01:24:25 2012, Zach, Laser, GYRO, RAM subtraction   
|
Fri Aug 17 00:47:52 2012, Zach, Electronics, GYRO, Daedalus NIMified, used to stabilize New Focus EOM   
|
Tue Aug 14 02:17:33 2012, Zach, Laser, GYRO, open-loop CW_ERR tests (for LF noise) 
|
Tue Aug 14 01:41:46 2012, Zach, Laser, GYRO, CW_TRANS ISS test
|
Sat Aug 11 03:00:02 2012, Zach, Laser, GYRO, CW_TRANS intensity noise testing
|
Sat Aug 11 11:51:51 2012, rana, Laser, GYRO, CW_TRANS intensity noise testing
|
Sat Aug 11 02:45:54 2012, Zach, Electronics, GYRO, added zero to CW OLTF, increased UGF to 30 kHz   
|
Fri Aug 10 01:19:47 2012, Zach, Laser, GYRO, noise spectrum with servos switched
|
Fri Aug 10 15:57:03 2012, rana, Laser, GYRO, noise spectrum with servos switched
|
Thu Aug 9 23:45:54 2012, Zach, Laser, GYRO, AOM actuation transfer function, etc.    
|
Thu Aug 9 16:41:34 2012, Zach, Laser, GYRO, Primary loop noise
|
Thu Aug 9 13:45:03 2012, Zach, Laser, GYRO, Gyro locked with uPDH box; diagnosing PDH2 issue 7x
|
Thu Aug 9 12:57:47 2012, Zach, Laser, Iodine, VIS turning mirrors ordered
|
Mon Aug 6 20:31:27 2012, Zach, Electronics, Iodine, NIM crate moved from EE shop to iodine bench
|
Mon Aug 6 20:18:28 2012, Zach, Laser, Iodine, doubling again
|
Mon Aug 6 20:00:44 2012, Zach, Laser, GYRO, Still no lock
|
Thu Jul 26 16:18:02 2012, Zach, Laser, GYRO, Gyro still sucking
|
Wed Jul 25 17:58:44 2012, Zach, Laser, GYRO, Gyro not locking
|
Sat Jul 21 17:44:00 2012, Zach, Electronics, Iodine, Board testing 
|
Tue Jul 24 04:24:53 2012, Zach, Electronics, Iodine, Board testing   
|
Fri Jul 20 01:25:34 2012, Zach, Electronics, Iodine, Starting board stuffing
|
Thu Jul 19 14:43:17 2012, Zach, Laser, GYRO, digital noise -> gyro noise   
|
Wed Jul 18 16:47:16 2012, Zach, Electronics, Iodine, temp controller parts in!   
|
Fri Jul 13 15:58:25 2012, Zach, Electronics, Iodine, board update
|
Wed Jul 11 13:48:03 2012, Zach, Electronics, Iodine, temp controller parts
|
Fri Jul 6 13:40:43 2012, Zach, Electronics, Iodine, Temp controller front panels ordered
|
Thu Jul 5 14:42:25 2012, Zach, Electronics, Iodine, Temperature controller boards ordered
|
Mon Jul 2 18:34:09 2012, Zach, Computing, DAQ, machines restarted
|
Mon Jul 2 18:16:09 2012, Zach, Electronics, Iodine, Temp controller "final" revision
|
Wed Jun 27 15:53:44 2012, Zach, Electronics, Iodine, Temp controller design re-revised 
|
Sun Jul 1 01:33:57 2012, rana, Electronics, Iodine, Temp controller design re-revised
|
Sun Jul 1 07:41:38 2012, Zach, Electronics, Iodine, Temp controller design re-revised
|
Fri Jun 22 20:16:16 2012, Zach, Electronics, Iodine, Temp controller PCB almost done
|
Wed Jun 27 10:34:06 2012, rana, Electronics, Iodine, Temp controller PCB almost done
|
Wed Jun 27 13:42:53 2012, Zach, Electronics, Iodine, Temp controller PCB almost done
|
Sun Jun 24 14:48:49 2012, Zach, Laser, GYRO, RAM monitor / optimization
|
Sat Jun 23 17:52:55 2012, Zach, Electronics, Iodine, Temp controller NIM front panel
|
Tue Jun 19 23:58:57 2012, Zach, Laser, GYRO, intensity noise / gyro noise testing
|
Tue Jun 19 01:49:53 2012, Zach, Laser, GYRO, CW locked, very preliminary noise spectrum 
|
Sat Jun 16 12:20:21 2012, Zach, Laser, GYRO, (Dubious) linewidth measurement
|
Sat Jun 16 18:56:36 2012, Koji, Laser, GYRO, (Dubious) linewidth measurement
|
Mon Jun 18 22:49:47 2012, Zach, Laser, GYRO, (Dubious) linewidth measurement
|
Mon Jun 18 18:01:52 2012, Rana, Laser, GYRO, (Dubious) linewidth measurement
|
Fri Jun 15 04:20:36 2012, Zach, Electronics, Iodine, temperature controller PCB layout 
|
Fri Jun 15 00:51:09 2012, Zach, Laser, GYRO, Bidirectional resonance
|
Thu Jun 14 10:51:56 2012, Zach, Laser, GYRO, CW MMT installed, input beams realigned
|
Tue Jun 12 14:19:59 2012, Zach, Laser, GYRO, CW MMT
|
Tue Jun 12 00:44:32 2012, Zach, Laser, GYRO, AOM double-pass reoptimized, CW beam profiled
|
Tue Jun 12 00:37:00 2012, Zach, Laser, GYRO, better servo TF
|
Sat Jun 9 13:43:52 2012, Zach, Laser, GYRO, Loop verification  
|
Wed Jun 6 04:28:37 2012, Zach, Electronics, Iodine, temperature controller circuit (v2)
|
Wed May 30 14:03:51 2012, Zach, Laser, GYRO, better AM TF
|
Wed May 30 19:11:35 2012, rana, Laser, GYRO, better AM TF
|
Mon Jun 4 21:33:09 2012, Zach, Laser, GYRO, better AM TF
|
Tue Jun 5 23:23:36 2012, rana, Laser, GYRO, better AM TF
|
Wed May 30 02:03:06 2012, Zach, Laser, GYRO, gyro AM TF
|
Fri May 25 20:44:59 2012, Zach, Laser, GYRO, no real improvement at vacuum   
|
Sat May 26 15:27:18 2012, Koji, Laser, GYRO, no real improvement at vacuum
|
Mon May 28 13:40:04 2012, Zach, Laser, GYRO, no real improvement at vacuum
|
Fri May 25 14:51:39 2012, Zach, Laser, GYRO, cavity aligned and locked with new mirror, looks promising
|
Fri May 25 10:49:25 2012, Zach, Laser, GYRO, MMT installed, new mirror cleaned and installed 
|
Wed May 23 12:07:46 2012, Zach, Laser, GYRO, New CCW MMT (with one aLIGO PMC mirror)
|
Wed May 23 11:50:51 2012, Zach, Laser, GYRO, New gyro estimates  
|
Wed May 23 11:34:21 2012, Zach, Laser, GYRO, aLIGO PMC mirror T(45º)
|
Wed May 23 10:53:49 2012, Zach, Laser, GYRO, aLIGO PMC mirrors obtained
|
Wed May 23 10:31:38 2012, Zach, Laser, Iodine, rest of 1064nm parts received
|
Wed May 2 13:43:30 2012, Zach, Laser, GYRO, aLIGO PMC mirrors 
|
Mon Apr 30 16:05:52 2012, Zach, Laser, GYRO, Installing G&H mirror   
|
Tue May 1 02:23:15 2012, Zach, Laser, GYRO, Installing G&H mirror
|
Wed May 2 10:20:04 2012, Alastair, Laser, GYRO, Installing G&H mirror
|
Tue Apr 24 02:31:24 2012, Zach, Laser, Iodine, cell holder almost finished  
|
Mon Apr 23 15:00:44 2012, Zach, Laser, Iodine, mounts ordered
|
Fri Apr 20 22:08:10 2012, Zach, Laser, Iodine, PBSs received
|
Sun Apr 15 19:28:14 2012, Zach, Laser, GYRO, Loss investigation  
|
Tue Apr 17 14:42:46 2012, Zach, Laser, GYRO, Loss investigation 
|
Tue Apr 17 20:08:00 2012, Zach, Laser, GYRO, Loss investigation 
|
Wed Apr 18 23:31:26 2012, Frank, Laser, GYRO, Loss investigation
|
Thu Apr 19 01:36:22 2012, Zach, Laser, GYRO, Loss investigation
|
Mon Apr 16 12:42:57 2012, Zach, Laser, Iodine, Some 1064nm optics ordered
|
Thu Apr 12 14:43:38 2012, Zach, Laser, GYRO, Terrible cavity coupling
|
Fri Apr 13 02:39:43 2012, Zach, Laser, GYRO, Terrible cavity coupling
|
Tue Apr 10 21:35:03 2012, Zach, Laser, Iodine, Cell holder solution
|
Tue Apr 10 00:41:20 2012, Zach, Laser, GYRO, CCW beam profile remeasured
|
Sat Mar 17 02:54:31 2012, Zach, Laser, GYRO, Throwing in the towel
|
Fri Mar 16 06:41:59 2012, Zach, Laser, GYRO, Moderate progress  
|
Wed Mar 14 16:52:41 2012, Zach, Laser, GYRO, I/O pretty much complete
|
Wed Mar 14 02:21:17 2012, Zach, Laser, GYRO, AOM double-pass set up, etc. 
|
Tue Mar 13 03:56:30 2012, Zach, Laser, GYRO, Reconstruction update  
|
Mon Mar 12 22:51:59 2012, Zach, Laser, GYRO, PMC MMT redone, PMC relocked
|
Mon Mar 12 21:46:50 2012, Zach, Laser, GYRO, Predicted cavity/HOM spectra 
|
Mon Mar 12 21:31:29 2012, Zach, Laser, GYRO, REFL RFPDs retuned
|
Sun Mar 11 15:40:54 2012, Zach, Misc, Optics, ATF lens inventory
|
Sun Mar 11 15:26:41 2012, Zach, Laser, GYRO, PMC MMT 
|
Sat Mar 10 23:26:13 2012, Zach, Laser, GYRO, PMC setup reassembled, locked 
|
Sat Mar 10 22:51:01 2012, Zach, Laser, GYRO, NPRO reprofiled
|
Sat Mar 10 10:35:10 2012, Zach, Laser, GYRO, darkness warshed over the gyro...
|
Fri Mar 9 03:27:58 2012, Zach, Laser, GYRO, Cavity locked with PDH2
|
Wed Mar 7 18:30:16 2012, Zach, Laser, Iodine, green optics in
|
Thu Feb 23 01:38:21 2012, Zach, Laser, GYRO, input-side viewports installed  
|
Wed Mar 7 09:05:22 2012, steve, Laser, GYRO, input-side viewports installed & design flaw
|
Wed Feb 29 01:43:57 2012, Zach, Laser, GYRO, chamber leak hunting
|
Wed Feb 29 15:14:51 2012, Zach, Laser, GYRO, chamber leak hunting
|
Wed Mar 7 08:50:04 2012, steve, Laser, GYRO, chamber leak hunting advice
|
Wed Mar 7 02:53:06 2012, Zach, Electronics, GYRO, servo purgatory
|
Sat Mar 3 02:37:23 2012, Zach, Laser, GYRO, new optics cleaned, installed, roughly aligned 
|
Fri Mar 2 16:40:07 2012, Zach, Electronics, GYRO, PDH2 S/N 7371 current TF and noise 
|
Wed Feb 29 02:15:55 2012, Zach, Electronics, GYRO, PDH2 TF design
|
Wed Feb 29 18:00:54 2012, Zach, Electronics, GYRO, PDH2 TF design, electronics noise estimates   
|
Tue Feb 28 22:17:09 2012, Zach, Laser, Iodine, optics ordered
|
Tue Feb 28 02:56:39 2012, Zach, Laser, GYRO, stuff that happened today 
|
Mon Feb 27 17:19:12 2012, Zach, Laser, GYRO, vacuum longevity
|
Sun Feb 26 02:23:27 2012, Zach, Laser, GYRO, vacuum bettered, PDH2 commissioning begins 
|
Fri Feb 24 03:02:01 2012, Zach, Laser, GYRO, Viewport installation finished, chamber pumped down
|
Wed Feb 22 02:33:41 2012, Zach, Laser, RAM, Recent stabilization trial results 
|
Wed Feb 22 01:46:43 2012, Zach, Laser, GYRO, viewports finished   
|
Wed Feb 15 14:52:10 2012, Zach, Laser, RAM, heater servo OLTF
|
Thu Feb 16 03:33:59 2012, Zach, Laser, RAM, Improved DC gain (integrator)  
|
Thu Feb 16 20:26:17 2012, Zach, Laser, RAM, new OLTF and modified experimental setup 
|
Fri Feb 10 01:31:24 2012, Zach, Laser, Iodine, Green/IR isolating mirror 532nm transmission
|
Thu Feb 9 01:02:47 2012, Eric, Misc, Iodine, Iodine localized in cold fingers
|
Tue Feb 7 16:53:01 2012, Zach, Laser, RAM, DC bias testing  
|
Tue Feb 7 22:15:18 2012, Zach, Laser, RAM, DC bias testing
|
Tue Feb 7 21:14:49 2012, Zach, Laser, Iodine, Doubling efficiency not really that good
|
Tue Feb 7 09:22:18 2012, Eric, Laser, Iodine, Gaussian Beam Mode Profile in PPKTP Crystal  
|
Fri Feb 3 22:51:47 2012, Zach, Laser, Iodine, resonant visible EOM characterization 
|
Mon Feb 6 13:33:32 2012, Zach, Laser, Iodine, resonant visible EOM characterization
|
Fri Feb 3 03:10:25 2012, Eric, Laser, Iodine, Greatly enhanced SHG 
|
Fri Feb 3 10:05:47 2012, Zach, Laser, Iodine, Greatly enhanced SHG 
|
Mon Feb 6 06:29:07 2012, Eric, Laser, Iodine, Greatly enhanced SHG 
|
Mon Feb 6 10:48:21 2012, Zach, Laser, Iodine, Greatly enhanced SHG
|
Sat Jan 28 12:33:59 2012, Zach, Laser, GYRO, New vacuum system viewport design
|
Tue Jan 31 16:01:26 2012, Zach, Laser, GYRO, New vacuum system viewport design
|
Thu Feb 2 07:49:23 2012, steve, Laser, GYRO, New vacuum system viewport design
|
Mon Jan 30 23:50:12 2012, Eric, Laser, Iodine, Frequency doubled!  
|
Thu Jan 26 20:19:53 2012, Zach, Electronics, GYRO, generic filter board put in NIM module 
|
Thu Jan 26 11:14:35 2012, Zach, Laser, Iodine, assembly has begun
|
Thu Jan 26 17:21:50 2012, Eric, Laser, Iodine, assembly has begun
|
Thu Jan 26 16:47:15 2012, Eric, Laser, Iodine, Mode matching NPRO into doubling crystal 
|
Tue Jan 24 00:56:07 2012, Zach, Laser, RAM, no foam/foam, no heat/foam+heat comparison   
|
Fri Jan 20 19:32:12 2012, Zach, Laser, GYRO, notch filter added to PMC loop 
|
Fri Jan 20 12:59:54 2012, Zach, Laser, GYRO, MIRRORS ARE IN (AND APPARENTLY CORRECT) - AT LAST! 
|
Fri Jan 20 01:33:30 2012, Zach, Laser, RAM, foam/no foam 6-hr comparison
|
Fri Jan 20 01:02:20 2012, Zach, Laser, GYRO, PMC OLTF
|
Thu Jan 19 02:34:39 2012, Zach, Laser, GYRO, PMC locked with PDH Box #2215 +HV 
|
Thu Jan 19 01:46:24 2012, Zach, Laser, RAM, Update on RAM measurements 
|
Wed Jan 18 01:16:56 2012, Zach, Laser, Iodine, 700-mW SOP written
|
Sat Jan 14 17:58:25 2012, Zach, Laser, RAM, RAM measurement setup  
|
Wed Jan 18 01:13:45 2012, Zach, Laser, RAM, RAM measurement setup
|
Thu Jan 12 16:27:48 2012, Zach, Laser, Fugly, Digital PMC loop too slow?
|
Fri Jan 13 01:21:45 2012, Zach, Laser, Fugly, Digital PMC loop too slow? 
|
Wed Jan 4 02:33:00 2012, Eric, Laser, Iodine, CORRECTED Beam Profile for 700mW NPRO 
|
Tue Jan 3 15:59:07 2012, Aidan, Computing, Computing, Directory clean up
|
Tue Dec 20 14:52:05 2011, Zach, Computing, Computing, Added 'sitemap' alias to fb0
|
Mon Dec 19 21:23:45 2011, Zach, Laser, GYRO, PMC stuff (including OLTF)  
|
Fri Dec 16 19:09:34 2011, Zach, Laser, GYRO, PMC locked with CDS+HV
|
Wed Dec 14 16:31:03 2011, Zach, Laser, GYRO, new box feedthrough solution
|
Fri Dec 9 17:30:49 2011, Zach, Laser, GYRO, new box basic drawing
|
Fri Dec 9 17:56:07 2011, Koji, Laser, GYRO, new box basic drawing
|
Thu Dec 8 15:50:45 2011, Zach, Laser, GYRO, Gyro NPRO restored
|
Wed Dec 7 16:48:13 2011, Eric, Laser, Iodine, Pressure/Temp Calibration for Iodine Cell
|
Wed Dec 7 16:10:29 2011, Eric, Laser, Iodine, Layout Update/Inventory
|
Mon Nov 28 19:12:05 2011, Eric, Laser, Iodine, Iodine frequency stabilization layout
|
Tue Nov 22 15:12:34 2011, Zach, Laser, GYRO, Laser swapped--noise worse
|
Fri Nov 18 01:31:44 2011, Zach, Laser, GYRO, more air noise testing 
|
Fri Nov 18 03:57:44 2011, Koji, Laser, GYRO, more air noise testing
|
Wed Nov 16 02:30:44 2011, Zach, Laser, GYRO, Vacuum window removal test 
|
Thu Nov 10 23:55:28 2011, Zach, Electronics, Iodine, Precision temperature controller 
|
Mon Nov 14 22:31:46 2011, Den, Electronics, Iodine, Precision temperature controller
|
Wed Nov 9 00:59:00 2011, Zach, Laser, GYRO, Gyro cavity reassembled, intensity noise remeasured
|
Wed Nov 9 00:39:52 2011, Zach, Laser, fubar, What not to do to a dogclamp 
|
Tue Nov 8 00:20:47 2011, Zach, Laser, GYRO, vacuum chamber prepped
|
Mon Nov 7 14:43:05 2011, Eric, Laser, Iodine, Beam profile for Iodine stabilized laser
|
Thu Nov 3 19:45:26 2011, Zach, Laser, GYRO, gyro cavity mirrors drag wiped    
|
Thu Nov 3 12:28:28 2011, Zach, Laser, Iodine, Cells have arrived 6x
|
Thu Oct 20 00:47:21 2011, Zach, Laser, GYRO, LF noise still there
|
Tue Nov 1 22:45:26 2011, Koji, Laser, GYRO, Wierd (LF noise still there)
|
Tue Oct 25 00:48:13 2011, rana, Misc, GYRO, Chandler
|
Tue Oct 18 23:42:47 2011, Koji, Laser, GYRO, PMC Finesse measurement
|
Thu Oct 20 17:02:34 2011, Koji, Laser, GYRO, Power Budget of the PMC 
|
Wed Oct 19 20:38:13 2011, Zach, Laser, GYRO, gyro cavity locked with PMC  
|
Tue Oct 18 16:38:27 2011, Zach, Misc, stuff happens, ATF floppy drive is missing
|
Mon Oct 17 23:32:04 2011, Zach, Laser, GYRO, PMC (again!) 
|
Fri Oct 14 00:56:54 2011, Zach, Laser, GYRO, more testing 
|
Sat Oct 15 11:03:18 2011, rana, Laser, GYRO, more testing
|
Thu Oct 13 02:08:22 2011, Zach, Laser, GYRO, initial scattered light tests  
|
Tue Sep 14 04:14:25 2010, Dmass, Misc, Doubling, Doubling results summary
|
Wed Sep 15 17:04:36 2010, Dmass, Misc, Doubling, DON'T REMOVE OPTICS YET
|
Wed Sep 15 22:59:37 2010, Frank, Misc, Doubling, DON'T REMOVE OPTICS YET
|
Tue Sep 21 01:52:05 2010, Dmass, Misc, Doubling, Doubling results summary
|
Thu Oct 6 23:44:09 2011, Dmass, Misc, Doubling, Finishing SHG paper  
|
Mon Oct 10 11:55:59 2011, Dmass, Misc, Doubling, Finishing SHG paper
|
Wed Sep 22 17:16:09 2010, Dmass, Misc, Doubling, Some notes on previous bounds
|
Mon Jan 24 17:17:59 2011, Dmass, Misc, Doubling, Some notes on previous bounds
|
Thu Oct 6 19:42:23 2011, Zach, Laser, GYRO, simple setup for testing
|
Tue Oct 4 19:24:21 2011, Zach, Laser, GYRO, PMC locked (a while ago) 
|
Tue Oct 4 18:27:57 2011, Zach, Laser, Fugly, why should a laser do this?
|
Tue Sep 20 23:13:21 2011, Zach, Laser, GYRO, SS PMC 6x
|
Mon Sep 19 22:08:54 2011, Zach, Laser, GYRO, proposed layout, PMC MMT, etc. 
|
Fri Sep 16 18:58:10 2011, Zach, Laser, GYRO, SS PMC
|
Fri Sep 16 01:38:25 2011, Zach, Laser, GYRO, 3f demod and other tests 
|
Wed Sep 14 14:54:24 2011, Zach, Laser, GYRO, frequency-dependent, low-frequency AM found
|
Thu Sep 15 08:16:25 2011, Alastair, Laser, GYRO, frequency-dependent, low-frequency AM found
|
Thu Sep 15 10:35:46 2011, Zach, Laser, GYRO, frequency-dependent, low-frequency AM found
|
Fri Sep 9 19:14:07 2011, Zach, Laser, General, LF_WTF?
|
Thu Sep 8 11:57:23 2011, Zach, Laser, GYRO, some LF noise progress
|
Tue Sep 6 20:55:47 2011, Zach, Laser, GYRO, PD noise
|
Wed Sep 7 16:25:05 2011, Zach, Laser, GYRO, PD noise
|
Fri Jul 29 23:38:42 2011, rana, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise
|
Mon Aug 1 15:59:58 2011, Zach, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise
|
Mon Aug 1 18:13:40 2011, Zoe, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise 
|
Tue Aug 2 10:15:57 2011, Zach, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise
|
Tue Aug 2 12:09:57 2011, Zoe, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise 
|
Tue Aug 2 12:22:30 2011, Alastair, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise
|
Tue Aug 2 12:32:35 2011, Zoe, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise
|
Tue Aug 2 12:47:02 2011, Alastair, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise
|
Tue Aug 2 18:28:04 2011, Zoe, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise  
|
Wed Aug 3 10:34:06 2011, Alastair, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise
|
Tue Sep 6 10:56:22 2011, rana, Misc, GYRO, Thermal Expansion Noise -> Gyro Noise
|
Wed Aug 31 10:19:25 2011, Alastair, Laser, GYRO, Inside an EOM  
|
Tue Aug 23 00:56:07 2011, Zach, Electronics, GYRO, LC homodyne discriminator
|
Wed Aug 24 05:26:03 2011, rana, Electronics, GYRO, LC homodyne discriminator
|
Wed Aug 24 10:47:58 2011, Zach, Electronics, GYRO, LC homodyne discriminator
|
Wed Aug 17 20:04:59 2011, Zach, Electronics, GYRO, PDH2 installation
|
Wed Aug 17 20:33:05 2011, Alastair, Electronics, GYRO, PDH2 installation
|
Thu Aug 18 03:09:37 2011, Zach, Electronics, GYRO, PDH2 installation
|
Wed Aug 17 20:16:02 2011, Alastair, Computing, Computing, gw0
|
Tue Aug 16 19:52:35 2011, Zach, Electronics, GYRO, PDH2 RF path TFs 
|
Wed Aug 10 20:27:49 2011, Zach, Laser, GYRO, bias servo implementation
|
Tue Aug 16 19:33:05 2011, Zach, Laser, GYRO, bias servo implementation
|
Tue Aug 16 15:30:37 2011, Alastair, Laser, GYRO, Mode of oscillation 
|
Mon Aug 15 17:49:49 2011, Alastair, Laser, GYRO, Shaker measurement    
|
Fri Aug 12 15:49:48 2011, Alastair & Zoe, Laser, GYRO, better voltage regulators! testing AD587 and sensor noise 7x
|
Fri Aug 12 12:13:38 2011, Alastair, Rana, Zoe, Laser, GYRO, Accelerometer calibration 
|
Fri Aug 12 12:09:26 2011, Zoe, Laser, GYRO, Temperature sensor noise compared to voltage reference noise
|
Thu Aug 11 16:28:41 2011, Alastair & Zoe, Laser, GYRO, Testing voltage reference noise
|
Fri Aug 12 11:38:54 2011, Alastair, Laser, GYRO, Testing voltage reference noise
|
Thu Aug 11 17:12:02 2011, Alastair & Rana & Zoe, Laser, GYRO, Testing temperature sensor noise   
|
Wed Aug 10 12:24:27 2011, Alastair & Zoe, Laser, GYRO, temperature sensors in foam box
|
Wed Aug 10 17:30:26 2011, Alastair & Zoe, Laser, GYRO, temperature sensors in foam box
|
Thu Aug 11 09:11:06 2011, Alastair & Zoe, Laser, GYRO, temperature sensors in foam box   
|
Wed Aug 10 08:02:50 2011, Zoe, Laser, GYRO, temperature sensor adjustment + plots from last night  
|
Wed Aug 10 09:52:41 2011, Alastair, Laser, GYRO, temperature sensor adjustment + plots from last night
|
Wed Aug 10 10:50:08 2011, Zach, Laser, GYRO, temperature sensor adjustment + plots from last night
|
Wed Aug 10 13:43:53 2011, Zoe, Laser, GYRO, temperature sensor adjustment + plots from last night 
|
Wed Aug 10 01:27:16 2011, Zoe, Electronics, GYRO, ADC noise and temperature data   
|
Tue Aug 9 17:46:04 2011, Zach, Laser, GYRO, RAM reduction bias servo
|
Mon Aug 8 17:27:27 2011, Alastair & Zoe, Laser, GYRO, Temperature sensors
|
Tue Aug 9 12:29:01 2011, Zoe, Laser, GYRO, Temperature sensors 
|
Tue Aug 9 17:40:47 2011, Zoe, Laser, GYRO, Temperature sensors
|
Tue Aug 9 16:01:50 2011, Alastair, Electronics, GYRO, ADC noise floor for temp sensing
|
Tue Aug 9 11:29:04 2011, Alastair & Zoe, Laser, GYRO, Huddle
|
Tue Aug 9 11:59:37 2011, Zach, Laser, GYRO, Huddle
|
Tue Aug 9 15:03:54 2011, rana, Laser, GYRO, Huddle
|
Tue Aug 9 11:29:03 2011, Alastair & Zoe, Laser, GYRO, Huddle
|
Mon Aug 8 17:05:30 2011, Zach, Laser, GYRO, more RAM tests    
|
Tue Aug 9 01:08:51 2011, Zach, Laser, GYRO, more RAM tests
|
Mon Aug 8 14:55:57 2011, Zach, Laser, GYRO, EOM RAM etalon measurement
|
Thu Aug 4 11:56:57 2011, Alastair & Zoe, Laser, GYRO, Accelerometer calibration
|
Thu Aug 4 16:01:34 2011, rana, Laser, GYRO, Accelerometer calibration
|
Thu Aug 4 17:31:39 2011, Alastair, Laser, GYRO, Accelerometer calibration
|
Thu Aug 4 17:30:35 2011, Alastair & Zoe, Laser, GYRO, Mode measurement 
|
Wed Aug 3 15:34:56 2011, Alastair, Laser, GYRO, Accelerometer channels
|
Wed Aug 3 15:19:15 2011, Alastair, Laser, GYRO, Reminder of calibration of AOM ACT channel
|
Tue Aug 2 18:12:30 2011, Zoe, Electronics, GYRO, new twin T transfer function 
|
Wed Aug 3 10:22:22 2011, Zoe, Electronics, GYRO, new twin T transfer function 
|
Tue Aug 2 20:41:35 2011, Frank, Laser, PSL, 35W laser ready to ship 7x
|
Tue Aug 2 13:55:46 2011, Alastair, Lab Infrastructure, General, Lab temperature not being controlled
|
Mon Aug 1 15:32:01 2011, Alastair & Zoe, Laser, GYRO, Temperature sensors moved to table
|
Sat Jul 30 01:17:52 2011, Frank, Laser, PSL, 35W-laser almost ready to ship
|
Fri Jul 29 15:42:17 2011, Alastair, Laser, GYRO, Cavity locking
|
Thu Jul 28 13:15:09 2011, Alastair & Zoe, Laser, GYRO, temperature step
|
Wed Jul 27 18:28:40 2011, alastair, Computing, Computing, frame builder is happy again
|
Wed Jul 27 17:46:17 2011, Alastair & Zoe, Laser, GYRO, Shaker/Accelerometer measurement   
|
Tue Jul 26 21:55:08 2011, Alastair, Computing, Computing, fb0
|
Fri Jul 22 14:11:51 2011, Alastair & Zoe, Laser, GYRO, Temperature step
|
Fri Jul 22 12:56:14 2011, Zach, Misc, General, Turned temp sensors off and then on
|
Thu Jul 21 14:35:03 2011, Alastair & Zoe, Laser, GYRO, Heater resting temperature
|
Thu Jul 21 10:34:19 2011, Alastair & Zoe, Laser, GYRO, Heater resting temperature; resistor replacement
|
Thu Jul 21 13:49:25 2011, Alastair, Laser, GYRO, Heater resting temperature; resistor replacement
|
Thu Jul 21 10:08:19 2011, Alastair & Zoe, Electronics, GYRO, Amplifiers for temperature sensor readout
|
Wed Jul 20 15:20:24 2011, Zach, Laser, GYRO, real gyro HOM plot
|
Wed Jul 20 14:46:55 2011, Zach, Electronics, GYRO, implementing PDH2
|
Mon Jul 18 12:46:40 2011, Zach, Electronics, GYRO, PDH2 S/N 7371 current TF, noise & schematic  
|
Fri Jul 15 13:35:56 2011, Zoe, Electronics, General, Generic filter board PCB with ground plane
|
Wed Jul 13 15:02:07 2011, Zoe, Electronics, General, Generic filter board PCB  
|
Fri Jul 15 03:31:21 2011, rana, Electronics, General, Generic filter board PCB
|
Fri Jul 15 09:24:28 2011, Alastair, Electronics, General, Generic filter board PCB
|
Fri Jul 15 09:26:28 2011, rana, Electronics, General, Generic filter board PCB
|
Fri Jul 15 12:25:42 2011, Zoe, Electronics, General, Generic filter board PCB
|
Thu Jul 14 12:08:18 2011, Alastair & Zoe, Laser, GYRO, Heated aluminum box 
|
Tue Jul 12 13:41:15 2011, Alastair, Lab Infrastructure, Computing, Router replaced
|
Fri Jul 8 14:19:18 2011, Alastair, Laser, GYRO, Temp sensors
|
Mon Jul 11 17:45:18 2011, Zoe, Laser, GYRO, Temp sensors
|
Tue Jul 12 09:14:22 2011, Alastair, Laser, GYRO, Temp sensors
|
Thu Jul 7 16:47:53 2011, Alastair & Zoe, Laser, GYRO, Noise in temp measurement... 
|
Fri Jul 8 12:19:46 2011, ???Mystery contributor???, Laser, GYRO, Noise in temp measurement...
|
Wed Jul 6 20:27:19 2011, Zach, Electronics, GYRO, PDH2 S/N 7371 TF and noise spectrum  
|
Wed Jul 6 17:44:45 2011, Alastair & Zoe, Lab Infrastructure, General, Temperature step and new/changed channels on DAQ
|
Wed Jul 6 12:22:34 2011, Alastair & Zoe, Lab Infrastructure, General, Temperature stepped...
|
Fri Jul 1 15:37:02 2011, Zach, Electronics, GYRO, first two PDH2s built, operational    
|
Fri Jul 1 13:50:17 2011, Zoe, Misc, GYRO, Temperature measurements
|
Thu Jun 30 22:04:46 2011, Zoe, Electronics, GYRO, Schematic for generic filter board  
|
Thu Jun 30 19:20:14 2011, Zoe, Misc, GYRO, Temperature sensors 
|
Tue Jun 28 11:27:30 2011, Alastair & Zoe, Electronics, GYRO, Temperature sensor buffer amplifier 
|
Tue Jun 28 11:01:03 2011, Alastair & Zoe, Lab Infrastructure, General, Input impedance of ADC
|
Mon Jun 20 20:12:18 2011, Zach, Things to Buy, GYRO, All PDH2 stuff purchased
|
Thu Jun 9 04:54:00 2011, Zach, Laser, GYRO, PDH2 PCB updated again
|
Fri Jun 10 02:47:32 2011, Zach, Laser, GYRO, PDH2 PCB updated again 
|
Tue May 31 19:54:14 2011, Zach, Electronics, GYRO, LAST CALL for PDH2 comments
|
Tue May 24 00:21:31 2011, Zach, Electronics, GYRO, revised PDH2 schematic
|
Tue May 24 19:56:08 2011, Zach, Electronics, GYRO, revised PDH2 schematic
|
Thu May 26 06:28:59 2011, Frank, Electronics, GYRO, revised PDH2 schematic
|
Thu May 26 09:17:44 2011, Zach, Electronics, GYRO, revised PDH2 schematic
|
Fri May 27 10:15:26 2011, Frank, Electronics, GYRO, revised PDH2 schematic
|
Fri May 27 10:20:47 2011, Zach, Electronics, GYRO, revised PDH2 schematic
|
Mon May 30 15:22:22 2011, rana, Electronics, GYRO, revised PDH2 schematic
|
Tue May 31 15:59:21 2011, Zach, Electronics, GYRO, revised PDH2 schematic
|
Thu May 26 18:40:41 2011, Zach, Electronics, GYRO, PDH2 NIM front panel
|
Wed May 25 19:04:41 2011, Zach, Electronics, GYRO, PDH2 PCB layout done
|
Wed May 25 06:07:56 2011, Zach, Electronics, GYRO, PDH2 PCB layout
|
Thu May 19 20:57:44 2011, Zach, Laser, GYRO, more LF noise hunting  
|
Tue May 17 21:53:36 2011, Zach, Laser, GYRO, new excess noise issue resolved
|
Tue May 17 12:23:44 2011, Zach, Laser, GYRO, electronics noise  
|
Thu May 12 01:11:07 2011, Zach, Laser, GYRO, some real progress 
|
Tue May 10 18:46:22 2011, Zach, Laser, GYRO, Sideband trouble again 
|
Wed May 11 11:46:45 2011, Alastair, Laser, GYRO, Sideband trouble again 
|
Tue May 10 11:53:48 2011, Zach, Laser, GYRO, no real progress 
|
Fri May 6 17:37:25 2011, Zach, Laser, GYRO, gyro not locking
|
Fri May 6 12:38:49 2011, Zach, Laser, GYRO, re-modematched and realigned, locked
|
Thu May 5 16:47:54 2011, Zach, Laser, GYRO, beam profiles
|
Thu May 5 02:18:56 2011, Zach, Laser, GYRO, new layout 
|
Fri Apr 29 15:43:53 2011, Zach, Laser, GYRO, mode matching needs a touch-up
|
Thu Apr 28 17:55:39 2011, Alastair, Laser, GYRO, Moving Faraday part 2
|
Thu Apr 28 15:00:14 2011, Alastair, Laser, GYRO, Moving Faraday...
|
Wed Apr 27 18:36:34 2011, Alastair & Koji, Laser, GYRO, Misalignment tests  
|
Tue Apr 26 23:16:29 2011, Zach, Laser, GYRO, not laser intensity noise 
|
Tue Apr 26 18:05:08 2011, Zach, Laser, GYRO, more interesting information
|
Tue Apr 26 01:28:09 2011, Zach, Laser, GYRO, Aha! (?)
|
Tue Apr 26 10:34:29 2011, Alastair, Laser, GYRO, Aha! (?)
|
Tue Apr 26 15:25:24 2011, Zach, Laser, GYRO, Aha! (?)
|
Tue Apr 26 17:24:46 2011, Zach, Laser, GYRO, not mode rotation from pointing
|
Fri Apr 22 20:17:42 2011, Aidan, Misc, ANTS!, They're heeeerrrree
|
Mon Apr 25 03:28:28 2011, Not Aidan, Misc, ANTS!, They're heeeerrrree
|
Fri Apr 22 03:31:56 2011, Zach, Laser, GYRO, more LF noise hunting
|
Thu Apr 21 02:45:28 2011, Zach, Laser, GYRO, LF noise hunting
|
Fri Apr 15 14:44:15 2011, Zach, Laser, GYRO, EOM AM/PM 
|
Thu Apr 14 22:59:15 2011, Zach, Electronics, GYRO, PD S/N 03 TF  
|
Wed Apr 13 17:44:14 2011, Alastair, Electronics, GYRO, Trans PD values
|
Wed Apr 13 14:58:12 2011, Alastair, Electronics, GYRO, Trans PD final design  
|
Tue Apr 12 23:17:51 2011, Zach, Laser, GYRO, thought I had it!  
|
Tue Apr 12 22:47:38 2011, Aidan, Computing, DAQ, Added TCS channels and restarted daqd
|
Mon Apr 11 16:44:46 2011, Zach, Laser, GYRO, oscillator phase noise measurements
|
Mon Apr 11 17:07:54 2011, Alastair, Laser, GYRO, oscillator phase noise measurements
|
Fri Apr 8 12:52:50 2011, Alastair, Laser, GYRO, Cavity mirrors
|
Mon Apr 11 14:48:00 2011, Alastair, Laser, GYRO, Cavity mirrors
|
Fri Apr 8 02:27:34 2011, Zach, Laser, GYRO, PBS removed, no low-frequency improvement 
|
Thu Apr 7 01:13:57 2011, Zach, Laser, GYRO, Houston, we have sidebands 
|
Thu Apr 7 14:07:54 2011, No Name, Laser, GYRO, Houston, we have sidebands
|
Tue Apr 5 23:57:40 2011, Zach, Laser, GYRO, new noise spectrum, some good news
|
Wed Apr 6 01:23:15 2011, rana, Laser, GYRO, RAM estimate
|
Wed Apr 6 02:08:01 2011, Zach, Laser, GYRO, RAM estimate
|
Mon Apr 4 15:30:22 2011, Frank, Misc, Pulser, two movies from diode blasting
|
Fri Apr 1 14:09:27 2011, Alastair, Electronics, GYRO, Trans PD measured
|
Fri Apr 1 14:13:02 2011, Zach, Electronics, GYRO, Trans PD measured
|
Fri Apr 1 14:31:46 2011, Joker, Electronics, GYRO, Trans PD measured
|
Fri Apr 1 15:54:28 2011, rana, Electronics, GYRO, Trans PD measured
|
Fri Apr 1 20:28:23 2011, Alastair, Electronics, GYRO, Trans PD measured
|
Sat Apr 2 03:24:12 2011, rana, Electronics, GYRO, Trans PD measured
|
Fri Apr 1 15:17:28 2011, Blaster, Misc, Pulser, pulser is running
|
Fri Apr 1 15:51:50 2011, Zach, Misc, Pulser, pulser is running
|
Thu Mar 31 21:51:16 2011, Zach, Laser, GYRO, gyro relocked
|
Wed Mar 30 14:12:10 2011, Alastair, Electronics, GYRO, Trans PD 
|
Thu Mar 31 00:33:36 2011, Frank, Electronics, GYRO, Trans PD
|
Thu Mar 31 11:25:43 2011, Alastair, Electronics, GYRO, Trans PD
|
Wed Mar 30 20:30:45 2011, Zach, Electronics, GYRO, TRANS PD tuned and REFL PDs retuned 
|
Tue Mar 29 02:10:30 2011, Zach, Laser, GYRO, new HOM structure calculated 
|
Wed Mar 23 01:14:27 2011, Zach, Laser, GYRO, signal routing finished, gyro locked   
|
Thu Mar 24 09:07:17 2011, Alastair & Zach, Laser, GYRO, RFAM re-measured 
|
Thu Mar 24 11:35:38 2011, rana, Laser, GYRO, RFAM re-measured
|
Wed Mar 23 10:48:20 2011, josephb, Computing, CDS, CDS stuff yesterday
|
Wed Mar 23 18:02:54 2011, alastair, Computing, CDS, CDS stuff yesterday
|
Tue Mar 22 00:12:31 2011, Zach, Lab Infrastructure, GYRO, rack & cable routing reorganized  
|
Tue Mar 22 09:46:45 2011, Alastair, Lab Infrastructure, GYRO, rack & cable routing reorganized
|
Thu Mar 17 15:09:18 2011, Aidan, Misc, stuff happens, LVC Lab Tour  
|
Thu Mar 17 11:55:08 2011, rana, Computing, Computing, coconutBattery
|
Tue Mar 15 00:30:46 2011, Zach, Laser, stuff happens, recent gyro plots are LIES
|
Tue Mar 15 12:34:33 2011, Alastair, Laser, stuff happens, recent gyro plots are LIES
|
Sun Mar 13 15:47:47 2011, Alastair, Laser, GYRO, Some parts we made...   
|
Sat Mar 12 05:32:40 2011, Zach, Laser, GYRO, current gyro noise  
|
Sat Mar 12 16:11:35 2011, Koji, Laser, GYRO, current gyro noise
|
Sat Mar 12 16:22:53 2011, Zach, Laser, GYRO, current gyro noise
|
Sat Mar 12 19:20:19 2011, Koji, Laser, GYRO, current gyro noise
|
Sat Mar 12 21:24:14 2011, Zach, Laser, GYRO, current gyro noise
|
Sun Mar 13 00:27:29 2011, Koji, Laser, GYRO, current gyro noise
|
Tue Mar 8 11:17:54 2011, Alastair, Laser, General, RF amplifiers
|
Wed Mar 9 09:31:50 2011, rana, Laser, Purchases, RF amplifiers : Cougars
|
Mon Mar 7 19:16:26 2011, Zach , Laser, GYRO, vacuum = better
|
Mon Mar 7 15:53:43 2011, Alastair, Laser, GYRO, Vacuum pumpdown part 2...
|
Mon Mar 7 12:46:38 2011, Alastair, Laser, GYRO, Vacuum pumpdown
|
Sun Mar 6 15:38:15 2011, Zach , Laser, GYRO, more noise analysis -- optical gain problem 
|
Sun Mar 6 00:43:02 2011, Zach , Electronics, GYRO, RFPD #02 TF
|
Fri Mar 4 01:17:24 2011, Zach, Electronics, GYRO, temporary PDH servo 6x
|
Fri Mar 4 02:06:22 2011, rana, Electronics, GYRO, temporary PDH servo
|
Fri Mar 4 02:36:42 2011, Zach, Electronics, GYRO, temporary PDH servo
|
Thu Mar 3 00:59:29 2011, Zach, Laser, GYRO, upgrade continues   
|
Wed Mar 2 09:14:01 2011, ghostwriter, Misc, fubar, dump or optics lab?    
|
Thu Mar 3 00:36:11 2011, Zach, Misc, fubar, dump or optics lab?
|
Wed Mar 2 15:44:36 2011, Frank, Laser, MOPA, 35W-laser SOP (LIGO-M070352) 
|
Wed Mar 2 11:01:13 2011, Frank, Lab Infrastructure, General, SOPs missing
|
Wed Mar 2 11:32:08 2011, Zach, Lab Infrastructure, General, SOPs missing
|
Wed Mar 2 13:11:23 2011, Frank, Lab Infrastructure, General, SOPs missing
|
Wed Mar 2 01:57:07 2011, Zach, Laser, GYRO, gyro locked with new RFPD 
|
Tue Mar 1 21:40:49 2011, Alastair, Computing, Computing, Wiki
|
Mon Feb 28 17:47:33 2011, Aidan, Computing, DAQ, Restarted DAQD on fb1
|
Thu Feb 24 01:29:09 2011, Zach, Electronics, GYRO, RFPD #01 TF
|
Thu Feb 24 03:54:29 2011, Frank, Electronics, GYRO, RFPD #01 TF
|
Mon Feb 21 23:17:46 2011, Zach, Electronics, GYRO, PDH box #1437 modified 
|
Wed Feb 23 01:40:03 2011, Zach, Electronics, GYRO, PDH box #1437 modified 
|
Wed Feb 23 15:33:32 2011, Zach, Electronics, GYRO, PDH box #1437 modified
|
Wed Feb 23 01:22:09 2011, Zach, Laser, GYRO, PD boxes in!  
|
Tue Feb 22 00:25:39 2011, Zach, Laser, GYRO, mode matching issue
|
Tue Feb 22 10:47:35 2011, Alastair?, Laser, GYRO, mode matching issue
|
Tue Feb 22 11:21:01 2011, Zach, Laser, GYRO, mode matching issue
|
Mon Feb 21 11:41:07 2011, Zach, Laser, GYRO, other half of MZ noise analysis
|
Mon Feb 21 22:08:13 2011, rana, Laser, GYRO, other half of MZ noise analysis
|
Sun Feb 20 23:21:45 2011, Zach, Laser, GYRO, MZ noise half-analysis   
|
Sat Feb 19 03:22:21 2011, Frank, Electronics, General, cable phase noise
|
Fri Feb 18 20:07:44 2011, Zach, Laser, GYRO, MZ measurement in progress
|
Fri Feb 18 00:09:55 2011, Zach, Laser, GYRO, gyro upgrade progress (repost)
|
Fri Feb 18 00:02:54 2011, Zach, Laser, GYRO, optical layout finalized  
|
Wed Feb 16 16:47:17 2011, Zach, Laser, GYRO, Gyro beams profiled
|
Wed Feb 16 00:18:27 2011, Zach, Laser, GYRO, AOM set up, CCW and CW beams power-balanced @ ~80 mW  
|
Tue Feb 15 02:02:53 2011, Zach, Electronics, GYRO, Universal PDH box noise problem identified
|
Tue Feb 15 09:12:11 2011, Koji, Electronics, GYRO, Universal PDH box noise problem identified
|
Tue Feb 15 11:16:29 2011, Zach, Electronics, GYRO, Universal PDH box noise problem identified
|
Tue Feb 15 11:34:48 2011, Frank, Electronics, GYRO, Universal PDH box noise problem identified
|
Tue Feb 15 12:08:33 2011, Zach, Electronics, GYRO, Universal PDH box noise problem identified,
|
Tue Feb 15 00:15:28 2011, Zach, Laser, GYRO, gyro upgrade progress
|
Thu Feb 10 13:00:28 2011, Zach, Computing, DAQ, everything is working again
|
Thu Feb 10 16:11:56 2011, Alastair, Computing, DAQ, everything is working again
|
Thu Feb 10 16:28:24 2011, Frank, Computing, DAQ, everything is working again
|
Thu Feb 10 19:04:14 2011, Zach, Computing, DAQ, everything is working again
|
Thu Feb 10 22:03:03 2011, Frank, Computing, DAQ, everything is working again
|
Wed Feb 9 20:13:46 2011, Zach, Electronics, GYRO, PD boxes ordered
|
Wed Feb 9 01:35:06 2011, Zach, Laser, GYRO, gyro RFPD transfer function (sort of) 
|
Tue Feb 8 21:28:33 2011, Alastair & Co., Computing, Computing, FB0 issues....
|
Fri Feb 4 05:26:18 2011, Zach, Electronics, GYRO, PDH2 PCB layout
|
Fri Feb 4 08:08:39 2011, Koji, Electronics, GYRO, PDH2 PCB layout
|
Fri Feb 4 14:56:38 2011, Zach, Electronics, GYRO, PDH2 PCB layout
|
Fri Feb 4 20:23:13 2011, Koji, Electronics, GYRO, PDH2 PCB layout
|
Mon Feb 7 13:37:31 2011, Zach, Electronics, GYRO, PDH2 PCB layout
|
Fri Feb 4 19:38:49 2011, rana, joeB, Computing, DAQ, fb0 problems fixed: daqd, nds, and atffe all now running
|
Mon Feb 7 12:59:11 2011, joeB, Computing, DAQ, fb0 problems fixed: daqd, nds, and atffe all now running
|
Fri Feb 4 23:45:40 2011, Zach, Electronics, GYRO, RFPD board problem solved
|
Fri Feb 4 22:45:48 2011, Frank, Computing, DAQ, hard drive failures
|
Fri Feb 4 16:58:39 2011, Alastair, Laser, GYRO, Rb Clock data
|
Thu Feb 3 19:49:52 2011, rana, Computing, CDS, FB work ongoing
|
Thu Feb 3 22:24:21 2011, Frank, Computing, CDS, FB work ongoing
|
Wed Feb 2 20:36:52 2011, Zach, Electronics, GYRO, PD stuffed
|
Thu Feb 3 19:40:24 2011, Zach, Electronics, GYRO, PD stuffed
|
Sat Jan 22 19:54:20 2011, Zach, Electronics, GYRO, RFPD box
|
Sat Jan 22 21:59:46 2011, Alastair, Electronics, GYRO, RFPD box
|
Sun Jan 23 12:17:45 2011, Zach, Electronics, GYRO, RFPD box
|
Mon Jan 24 00:47:54 2011, Koji, Electronics, GYRO, RFPD box
|
Mon Jan 24 12:06:14 2011, Zach, Electronics, GYRO, RFPD box
|
Mon Jan 24 12:57:15 2011, rana, Electronics, GYRO, RFPD box
|
Mon Jan 24 13:16:01 2011, Zach, Electronics, GYRO, RFPD box
|
Wed Jan 26 01:42:44 2011, Zach, Electronics, GYRO, RFPD box
|
Fri Jan 28 17:40:28 2011, Zach, Electronics, GYRO, RFPD box
|
Fri Jan 28 04:12:26 2011, Zach, Laser, GYRO, shot-noise-limited locking scheme 11x
|
Mon Jan 24 18:13:20 2011, Zach, Electronics, GYRO, PDH servo
|
Tue Jan 25 00:05:57 2011, Koji, Electronics, GYRO, PDH servo
|
Tue Jan 25 01:30:01 2011, Zach, Electronics, GYRO, PDH servo
|
Tue Jan 25 01:39:00 2011, Koji, Electronics, GYRO, PDH servo
|
Tue Jan 25 02:09:16 2011, Zach, Electronics, GYRO, PDH servo
|
Tue Jan 25 02:18:17 2011, Koji, Electronics, GYRO, PDH servo
|
Wed Jan 26 01:20:10 2011, Zach, Electronics, GYRO, PDH servo
|
Wed Jan 26 06:20:03 2011, Koji, Electronics, GYRO, PDH servo
|
Wed Jan 26 12:42:36 2011, Zach, Electronics, GYRO, PDH servo
|
Wed Jan 26 18:10:37 2011, rana, Electronics, GYRO, PDH servo
|
Wed Jan 26 19:47:42 2011, Zach, Electronics, GYRO, PDH servo
|
Wed Jan 26 20:01:31 2011, Zach, Electronics, GYRO, PDH servo
|
Wed Jan 26 14:48:02 2011, Alastair, Laser, GYRO, Flanges for vacuum
|
Wed Jan 26 10:38:10 2011, Alastair, Laser, GYRO, PD boards
|
Tue Jan 25 15:34:05 2011, Alastair, Laser, GYRO, Chasing up orders/machine shop
|
Thu Jan 20 00:00:07 2011, Zach, Electronics, GYRO, EOM circuit 
|
Thu Jan 20 17:04:42 2011, Zach, Electronics, GYRO, EOM circuit
|
Fri Jan 21 18:15:58 2011, Zach, Electronics, GYRO, EOM circuit
|
Thu Jan 20 20:13:07 2011, Alastair, Laser, GYRO, Vacuum parts 
|
Thu Jan 20 12:50:43 2011, Zach, Lab Infrastructure, Computing, fb0 put back into rack, moved to a better location
|
Wed Jan 19 10:11:09 2011, Alastair, Laser, GYRO, PD boards sent for production
|
Tue Jan 18 19:32:05 2011, Alastair, Laser, GYRO, Vacuum flanges
|
Thu Jan 13 15:34:32 2011, Alastair, Laser, GYRO, (no) Vaccum update
|
Wed Jan 12 16:48:06 2011, Zach, Laser, GYRO, Clean slate 
|
Tue Jan 11 18:26:54 2011, Zach, Laser, GYRO, Enhanced Gyro upgrade outline
|
Wed Jan 12 09:38:28 2011, Alastair, Laser, GYRO, Enhanced Gyro upgrade outline
|
Tue Jan 11 15:12:18 2011, Zach, Electronics, GYRO, PDH box #1437 reverted
|
Tue Jan 11 14:23:01 2011, Alastair & Zach, Laser, GYRO, Vacuum system
|
Tue Jan 11 11:07:41 2011, Alastair, Electronics, GYRO, PD board design  
|
Sat Jan 8 19:52:24 2011, Alastair, Electronics, GYRO, PD board design 
|
Mon Jan 10 15:18:24 2011, Alastair, Electronics, GYRO, PD board design
|
Mon Jan 10 16:08:04 2011, Alastair, Electronics, GYRO, PD board design
|
Mon Jan 10 09:25:50 2011, Alastair, Misc, General, Michelson's interferometer
|
Wed Jan 5 14:45:53 2011, Koji, Laser, MOPA, Chiller is crying
|
Wed Jan 5 15:37:18 2011, Frank, Laser, MOPA, Chiller is crying
|
Wed Jan 5 21:20:01 2011, Zach, Laser, MOPA, Chiller is crying
|
Tue Jan 4 11:42:19 2011, Alastair, Misc, GYRO, Vacuum system
|
Thu Dec 16 19:25:27 2010, Zach, Misc, GYRO, Murphy's Law verified, science rejoices
|
Fri Dec 17 03:34:55 2010, rana, Misc, GYRO, Murphy's Law verified, science rejoices
|
Tue Dec 28 14:22:03 2010, Zach, Misc, GYRO, Murphy's Law verified, science rejoices
|
Mon Dec 20 00:49:55 2010, rana, Misc, stuff happens, trivia
|
Wed Dec 15 15:41:45 2010, Alastair & Zach, Electronics, General, RFPD design
|
Wed Dec 15 22:29:27 2010, Frank, Electronics, General, RFPD design
|
Wed Dec 15 22:36:05 2010, Alastair, Electronics, General, RFPD design
|
Thu Dec 16 03:50:33 2010, rana, Electronics, General, RFPD design: comments
|
Thu Dec 16 15:27:12 2010, Alastair, Electronics, General, RFPD design: comments
|
Fri Dec 17 22:07:00 2010, Alastair, Electronics, General, RFPD design: comments
|
Thu Dec 16 10:46:36 2010, Zach, Electronics, GYRO, EOM circuit 
|
Thu Dec 16 13:13:02 2010, Koji, Electronics, GYRO, EOM circuit
|
Thu Dec 16 19:46:39 2010, Zach, Electronics, GYRO, EOM circuit
|
Wed Dec 15 20:16:44 2010, Alastair, Computing, General, more on fb0
|
Wed Dec 15 20:35:18 2010, Alastair, Computing, General, more on fb0
|
Wed Dec 15 01:20:03 2010, Frank, Computing, DAQ, cron-job added on fb1 for wiper script to delete old frame files
|
Wed Dec 15 00:49:11 2010, Frank, Computing, DAQ, fb1 fixed
|
Tue Dec 14 17:02:56 2010, Alastair, Zach, Frank (and absolutely definitely no help from Joe), Computing, Computing, FB0 status update
|
Mon Dec 13 23:55:06 2010, Zach, Laser, GYRO, gyro signal noise comparison (AOM FB vs. PLL FB) 
|
Tue Dec 14 04:23:03 2010, rana, Laser, GYRO, gyro signal noise comparison (AOM FB vs. PLL FB)
|
Tue Dec 14 09:30:52 2010, Zach, Laser, GYRO, gyro signal noise comparison (AOM FB vs. PLL FB)
|
Mon Dec 13 11:28:32 2010, Zach, Computing, DAQ, help
|
Fri Dec 10 10:33:46 2010, Zach, Laser, GYRO, update
|
Fri Dec 10 13:43:07 2010, Koji, Laser, GYRO, update
|
Fri Dec 10 10:46:11 2010, Zach, Computing, DAQ, busted again!
|
Fri Dec 10 11:21:14 2010, Alastair, Computing, DAQ, busted again!
|
Fri Dec 10 11:44:05 2010, Alastair, Computing, DAQ, busted again!
|
Fri Dec 10 11:08:41 2010, Alastair, Computing, General, Sitemap working again for gyro
|
Wed Dec 8 22:16:00 2010, Zach, Electronics, GYRO, EOM resonant circuit test 
|
Thu Dec 9 23:07:46 2010, Zach, Electronics, GYRO, EOM resonant circuit test
|
Thu Dec 9 21:10:24 2010, Alastair, Laser, GYRO, Wind breaker
|
Wed Dec 8 17:57:46 2010, Frank, Lab Infrastructure, General, Whiteboard installation on Monday
|
Thu Dec 9 20:55:50 2010, Zach, Lab Infrastructure, General, Whiteboard installation on Monday
|
Thu Dec 9 02:53:22 2010, Koji, Laser, GYRO, Double Hacky? Trio? Even Hacky quartet!  
|
Wed Dec 8 22:22:51 2010, Koji, Laser, GYRO, Gyro relocked
|
Tue Dec 7 00:19:26 2010, Zach, Laser, GYRO, noise budget-O-matic
|
Wed Dec 8 01:13:31 2010, Zach, Laser, GYRO, noise budget-O-matic 
|
Wed Dec 8 11:37:17 2010, Zach, Laser, GYRO, noise budget-O-matic
|
Thu Dec 2 15:48:05 2010, Alastair, Computing, Purchases, The router saga continues
|
Fri Dec 3 12:16:10 2010, Alastair, Computing, Purchases, The router saga continues
|
Tue Dec 7 15:05:25 2010, Alastair, Computing, Purchases, new router has arrived
|
Mon Dec 6 16:31:15 2010, Zach, Laser, GYRO, CCW-CW noise spillover analysis
|
Thu Dec 2 17:11:36 2010, Frank, Computing, Pulser, hardware & software updates
|
Thu Dec 2 16:03:01 2010, Frank, Computing, DAQ, external framebuilder acces to fb0 fixed
|
Wed Dec 1 13:34:04 2010, Zach, Laser, GYRO, current gyro noise budget
|
Wed Dec 1 02:01:34 2010, Frank, Computing, Pulser, Camera problems on IBM computer
|
Tue Nov 30 19:03:21 2010, Frank, Computing, DAQ, fb0 working again - fsck forced
|
Tue Nov 30 12:59:16 2010, Frank, Computing, Pulser, switched computers for pulsing experiment
|
Tue Nov 30 11:03:55 2010, Alastair, Things to Buy, GYRO, vacuum gauge for gyro system
|
Mon Nov 29 20:29:57 2010, Zach, Computing, DAQ, issues
|
Mon Nov 29 22:01:29 2010, Alastair, Computing, DAQ, issues
|
Mon Nov 29 19:42:23 2010, Alastair, Electronics, GYRO, photodiode plans
|
Fri Nov 26 13:00:20 2010, Zach, Laser, GYRO, Gyro OLTFs and current noise spectrum 
|
Fri Nov 26 19:43:34 2010, Koji, Laser, GYRO, Gyro OLTFs and current noise spectrum
|
Wed Nov 24 23:57:13 2010, Frank, Misc, Pulser, improved setup finished
|
Tue Nov 23 23:36:12 2010, Frank, Misc, Pulser, added digital camera readout
|
Tue Nov 23 11:55:04 2010, Zach, Laser, GYRO, backscatter problem
|
Fri Nov 19 20:09:57 2010, Zach, Laser, GYRO, realignment, etc
|
Sat Nov 20 15:02:05 2010, rana, Laser, GYRO, realignment, etc
|
Sun Nov 21 16:24:06 2010, Zach, Laser, GYRO, realignment, etc 
|
Thu Nov 18 09:27:18 2010, Koji, Laser, GYRO, RFAM & Sprious RF coupling   
|
Mon Nov 15 23:03:39 2010, Zach, Laser, GYRO, RFAM 
|
Fri Nov 12 17:56:48 2010, Zach, Electronics, GYRO, channels acquired
|
Fri Nov 12 23:12:18 2010, Alastair, Electronics, GYRO, channels acquired
|
Sat Nov 13 11:37:03 2010, Zach, Electronics, GYRO, channels acquired
|
Fri Nov 12 12:56:47 2010, Zach, Laser, GYRO, time-varying RFAM
|
Thu Nov 11 23:53:12 2010, Zach, Laser, GYRO, TO DO
|
Thu Nov 11 23:15:14 2010, Zach, Laser, GYRO, update
|
Thu Nov 11 01:37:35 2010, Frank, Misc, Pulser, diode blasting setup changed - added CCD camera  
|
Wed Nov 10 11:28:34 2010, Zach, Laser, GYRO, PDA255 noise
|
Wed Nov 10 18:49:01 2010, rana, Laser, GYRO, PDA255 noise
|
Wed Nov 10 01:15:34 2010, Alastair, Computing, Computing, Wiki is down...
|
Wed Nov 10 01:21:49 2010, Koji, Computing, Computing, Wiki is down...
|
Wed Nov 10 01:46:53 2010, Alastair, Computing, Computing, Wiki is down...
|
Wed Nov 10 01:52:22 2010, Alastair, Computing, Computing, Wiki is down...
|
Tue Nov 9 12:57:30 2010, Zach, Electronics, GYRO, Primary PDH box noise assessment 
|
Tue Nov 9 02:18:36 2010, alastair, Computing, Computing, router ordered
|
Tue Nov 9 01:38:50 2010, Zach, Laser, GYRO, Tektronix VCO / NPRO PZT actuation calibration 
|
Sun Nov 7 21:47:10 2010, rana, Computing, Computing, fb0/fb1 user ID and group ID changed to controls=1001
|
Mon Nov 8 17:26:38 2010, rana, Computing, Computing, fb0/fb1 user ID and group ID changed to controls=1001
|
Mon Nov 8 22:37:33 2010, rana, Computing, Computing, fb0/fb1 user ID and group ID changed to controls=1001
|
Mon Nov 8 17:18:14 2010, Zach, Laser, GYRO, electronic noise contributions
|
Mon Nov 8 13:42:06 2010, Frank, Misc, Pulser, increased pulse energy again
|
Mon Nov 8 11:42:03 2010, Frank, Computing, Pulser, Netbook frozen again
|
Mon Nov 8 00:21:43 2010, Zach, Laser, GYRO, Primary loop unsuppressed frequency noise
|
Mon Nov 8 00:15:21 2010, Zach, Laser, GYRO, primary loop self-consistency check
|
Sun Nov 7 15:13:29 2010, Frank, Computing, Pulser, netbook frozen
|
Sat Nov 6 23:48:02 2010, rana, Computing, Computing, ws1 is back, almost
|
Sat Nov 6 01:19:50 2010, Frank, Misc, Pulser, increased pulse energy to 250mJ
|
Fri Nov 5 01:19:42 2010, Frank, Misc, Pulser, setup schematic and program screenshot 
|
Fri Nov 5 00:59:57 2010, Frank, Misc, Pulser, no results so far
|
Thu Nov 4 23:22:53 2010, Zach, Computing, Computing, why is the elog so slow?
|
Thu Nov 4 22:18:31 2010, Alastair, Computing, Computing, Changes to model
|
Wed Nov 3 20:52:14 2010, Zach, Electronics, GYRO, PDH box #1437 gain vs. gain knob setting
|
Wed Nov 3 20:45:29 2010, Zach, Electronics, GYRO, PDH box IN -> INMON TF
|
Wed Nov 3 20:40:20 2010, Zach, Electronics, GYRO, SLP-1.9+ audio TF
|
Tue Nov 2 22:47:35 2010, Zach, Electronics, GYRO, demodulation noise analysis
|
Wed Nov 3 20:25:01 2010, Zach, Electronics, GYRO, demodulation noise analysis
|
Tue Nov 2 19:22:56 2010, Alastair, Computing, Computing, DAQ
|
Wed Nov 3 19:00:45 2010, Alastair, Computing, Computing, DAQ
|
Wed Nov 3 18:18:19 2010, Frank, Misc, General, Thin film and bulk index of refraction and photonics calculations - web page
|
Wed Nov 3 01:27:26 2010, Koji, Laser, GYRO, in response to the elog entries 1126-1130
|
Tue Nov 2 23:20:07 2010, Zach, Laser, GYRO, List of things to do
|
Tue Nov 2 23:01:45 2010, Zach, Laser, GYRO, PDA10A (REFL CCW PD) intensity noise analysis
|
Tue Nov 2 22:40:31 2010, Zach, Electronics, GYRO, BLP-1.9+
|
Tue Nov 2 22:36:35 2010, Zach, Electronics, GYRO, PDH schematic updated
|
Mon Nov 1 22:25:48 2010, Frank, Laser, General, 35W laser ON
|
Mon Nov 1 19:46:05 2010, Zach, Misc, Computing, floppy disk cleared
|
Fri Oct 29 17:31:41 2010, Alastair, Lab Infrastructure, fubar, Old white board
|
Sat Oct 30 14:09:20 2010, Curious George, Lab Infrastructure, fubar, Old white board
|
Mon Nov 1 16:35:15 2010, Alastair, Lab Infrastructure, fubar, Old white board
|
Fri Oct 29 15:34:36 2010, Zach & Koji, Laser, GYRO, CCW loop characterization
|
Sat Oct 30 20:02:01 2010, Koji, Laser, GYRO, gyro characterization Oct 27, 2010 (1)
|
Sat Oct 30 20:18:06 2010, Koji, Laser, GYRO, gyro characterization Oct 27, 2010 (2) 
|
Sat Oct 30 20:57:19 2010, Koji, Laser, GYRO, gyro characterization Oct 27, 2010 (3)
|
Sat Oct 30 22:49:04 2010, Koji, Laser, GYRO, gyro characterization Oct 27, 2010 (4)
|
Sat Oct 30 23:41:31 2010, Koji, Laser, GYRO, gyro characterization Oct 27, 2010 (5)
|
Thu Oct 28 18:52:16 2010, Zach, Laser, General, Lasers were turned off last night for PMA work
|
Sun Oct 24 19:27:44 2010, rana, Computing, Computing, Now running ELOG 2.8.0
|
Fri Oct 22 10:56:51 2010, Rana & Alastair, Computing, Computing, front-end now working
|
Wed Oct 20 23:49:54 2010, Alastair, Computing, Computing, DAQ continued
|
Thu Oct 21 12:17:54 2010, Frank, Computing, Computing, DAQ continued
|
Wed Oct 20 18:43:48 2010, Alastair, Computing, Computing, ATF FB0 front-end rebuild
|
Wed Oct 13 10:08:48 2010, Alastair, Computing, Computing, Network diagram
|
Fri Oct 8 19:59:00 2010, Alastair, Misc, GYRO, Seimometer set up on top of bench / SR560 borrowed from DAQ input channel 13 GYRO
|
Wed Oct 6 17:06:45 2010, Frank, Misc, Pulser, Keithley 2635A i-v curve config files
|
Wed Oct 6 15:26:56 2010, Alastair, Lab Infrastructure, ANTS!, insecticide on floor
|
Wed Oct 6 12:23:44 2010, Alastair, Computing, General, Installed matlab on WS2
|
Wed Oct 6 00:32:45 2010, rana, Computing, DAQ, Network Data Server
|
Tue Oct 5 12:53:26 2010, Aidan, Computing, General, Added link to the users directory in the root directory on ws1
|
Mon Oct 4 23:50:12 2010, Zach, Laser, GYRO, CCW-CW crosstalk measurements 
|
Mon Oct 4 15:29:01 2010, Alastair, Lab Infrastructure, General, Laser chiller
|
Fri Oct 1 21:58:29 2010, Alastair, Computing, Computing, wiki
|
Fri Oct 1 11:53:04 2010, Alastair, Computing, Computing, no chans in dataviewer
|
Fri Oct 1 12:28:53 2010, Alastair, Computing, Computing, no chans in dataviewer
|
Fri Oct 1 13:04:44 2010, Frank, Computing, Computing, no chans in dataviewer
|
Fri Oct 1 02:02:23 2010, Zach, Laser, GYRO, CCW-CW crosstalk
|
Thu Sep 30 19:26:57 2010, Zach, Computing, DAQ, DAQ appears #&*@ed
|
Thu Sep 30 21:09:43 2010, Zach, Computing, DAQ, DAQ appears #&*@ed
|
Thu Sep 30 01:01:04 2010, Zach, Laser, GYRO, variation of Alastair's VCO-swap measurement, re-thoughts about readout schemes
|
Thu Sep 30 00:25:31 2010, Zach, Electronics, GYRO, VCO deviation measurements  
|
Wed Sep 29 16:45:23 2010, Zach, Computing, DAQ, acquired channel
|
Wed Sep 29 11:56:04 2010, Alastair, Computing, General, ATF wiki
|
Wed Sep 29 13:36:57 2010, Alastair, Computing, General, ATF wiki
|
Tue Sep 28 13:53:08 2010, Zach & Alastair, Laser, GYRO, current gyro noise spectrum
|
Tue Sep 28 14:12:45 2010, Koji, Laser, GYRO, current gyro noise spectrum
|
Tue Sep 28 14:42:21 2010, Zach, Laser, GYRO, current gyro noise spectrum
|
Tue Sep 28 23:04:38 2010, Zach, Laser, GYRO, current gyro noise spectrum
|
Tue Sep 28 22:47:38 2010, Alastair, Computing, General, New ATF Wiki
|
Thu Sep 23 22:07:55 2010, Zach & Alastair, Laser, GYRO, CCW OLTF 
|
Thu Sep 23 17:45:56 2010, Alastair & Zach, Electronics, GYRO, pdh box 1 mods 
|
Tue Sep 21 17:11:12 2010, Alastair, Electronics, GYRO, pdh box re-modifying 6x
|
Wed Sep 22 15:16:07 2010, Alastair, Electronics, GYRO, pdh box re-modifying
|
Wed Sep 22 17:03:24 2010, Alastair, Electronics, GYRO, pdh box re-modifying 
|
Wed Sep 22 00:58:47 2010, Zach, Electronics, GYRO, RFPD LISO model 
|
Mon Sep 20 22:47:27 2010, Alastair, Misc, fubar, liso
|
Sun Sep 19 16:27:35 2010, Zach & Alastair, Electronics, GYRO, Gyro RFPD dimensions
|
Sun Sep 19 20:45:39 2010, rana, Electronics, GYRO, Gyro RFPD
|
Mon Sep 20 14:41:14 2010, Zach, Electronics, GYRO, Gyro RFPD
|
Mon Sep 20 15:30:22 2010, Alastair, Electronics, GYRO, Gyro RFPD
|
Mon Sep 20 15:47:49 2010, Zach, Electronics, GYRO, Gyro RFPD
|
Mon Sep 20 14:07:37 2010, rana, Computing, Computing, WS1: video settings fixed to have dual head Xinerama
|
Mon Sep 20 13:41:33 2010, rana, Computing, fubar, router was down so I power cycled it
|
Mon Sep 20 13:29:53 2010, rana, Computing, Computing, ws1 device query (this is very uninteresting)
|
Sun Sep 19 16:23:19 2010, Zach & Alastair, Electronics, GYRO, changes to PDH box #1437 and current CCW OLTF   
|
Fri Sep 17 17:25:32 2010, Frank, Laser, Pulser, remaining power in PC "OFF"-state 
|
Thu Sep 16 22:35:17 2010, Zach, Laser, GYRO, Gyro CCW open-loop TF  
|
Thu Sep 16 12:53:31 2010, Alastair, Lab Infrastructure, General, Seismometer now measuring   
|
Wed Sep 15 23:23:30 2010, Frank, Laser, General, 35W Laser ON
|
Wed Sep 15 18:33:58 2010, Alastair, Laser, General, What's up with the 808nm?
|
Wed Sep 15 22:10:46 2010, rana, Laser, General, What's up with the 808nm?
|
Wed Sep 15 22:54:03 2010, Frank, Laser, General, What's up with the 808nm?
|
Wed Sep 15 20:09:09 2010, Zach, Laser, GYRO, Updated SVN noise budget
|
Mon Sep 13 22:01:11 2010, Zach, Laser, GYRO, frustrating GYRO realizations 
|
Thu Sep 9 00:22:14 2010, Dmass, Electronics, stuff happens, Newport 3040 fukt?
|
Thu Sep 9 05:17:19 2010, Dmass, Electronics, stuff happens, Who cares!
|
Thu Sep 9 18:31:48 2010, Dmass, Electronics, stuff happens, Who cares!
|
Thu Sep 9 21:12:50 2010, Dmass, Electronics, stuff happens, Router Crashed again?
|
Thu Sep 9 21:45:26 2010, Dmass, Electronics, stuff happens, Router Crashed again?
|
Thu Sep 9 21:56:29 2010, Dmass, Electronics, stuff happens, Can't get data from 40m network?
|
Thu Sep 9 21:57:37 2010, Frank, Electronics, stuff happens, Router Crashed again?
|
Thu Sep 9 22:38:06 2010, Zach, Electronics, stuff happens, Router Crashed again?
|
Fri Sep 10 01:03:21 2010, Dmass, Electronics, stuff happens, Who cares!
|
Fri Sep 10 01:24:41 2010, Dmass, Electronics, stuff happens, SR560 needed
|
Fri Sep 10 16:32:32 2010, Dmass, Electronics, stuff happens, Who cares!
|
Mon Sep 13 21:34:47 2010, Dmass, Electronics, Doubling, Final Spectra: HEPA Test 
|
Sun Sep 12 01:24:38 2010, Zach, Laser, GYRO, new gyro noise spectrum
|
Fri Sep 10 16:33:38 2010, Frank, Computing, General, arp scan for ATF lab to update network diagram
|
Sat Sep 11 03:22:22 2010, rana, Computing, General, arp scan for ATF lab to update network diagram
|
Fri Sep 10 20:02:09 2010, Zach, Laser, GYRO, Refcav stabilization idea added to GyroDoc
|
Fri Sep 10 19:10:02 2010, Zach, Laser, GYRO, Gyro displacement noise analysis
|
Fri Sep 10 18:18:03 2010, Zach, Laser, GYRO, gyro taking data
|
Thu Sep 9 23:36:53 2010, Zach, Misc, GYRO, gyro noise budget updated in SVN
|
Thu Sep 9 12:23:50 2010, Zach, Laser, GYRO, PDH box SWEEP -> OUT TF
|
Thu Sep 9 14:49:01 2010, Koji, Laser, GYRO, PDH box SWEEP -> OUT TF
|
Thu Sep 9 17:10:39 2010, Zach, Laser, GYRO, PDH box SWEEP -> OUT TF
|
Thu Sep 9 20:28:12 2010, Koji, Laser, GYRO, PDH box SWEEP -> OUT TF
|
Thu Sep 9 13:12:24 2010, Alastair, Computing, General, paths and aliases
|
Wed Sep 8 17:51:15 2010, Alastair & Zach, Laser, GYRO, Windows are in   
|
Wed Sep 8 18:13:26 2010, Alastair & Zach, Laser, GYRO, Windows are in
|
Wed Sep 8 02:00:36 2010, Dmass, Laser, Doubling, Oven Snafu Update
|
Tue Sep 7 13:28:16 2010, Dmass, Laser, Doubling, MZ Freq Noise Spectrum / Noise Budget
|
Tue Sep 7 23:43:46 2010, Dmass, Laser, Doubling, MZ Freq Noise Spectrum / Noise Budget
|
Mon Sep 6 16:37:05 2010, Zach, Laser, GYRO, New gyro noise spectrum
|
Wed Sep 1 02:21:23 2010, rana, Computing, DAQ, some restarts on fb0: too many cooks
|
Wed Sep 1 04:43:45 2010, Dmass, Computing, DAQ, some restarts on fb0: too many cooks
|
Fri Sep 3 14:45:20 2010, Dmass, Computing, DAQ, Undocumented change?
|
Sat Sep 4 00:44:20 2010, Dmass, Computing, DAQ, Undocumented change?
|
Sat Sep 4 01:49:23 2010, Dmass, Computing, DAQ, Undocumented change?
|
Sat Sep 4 02:21:46 2010, Frank, Computing, DAQ, Undocumented change?
|
Sat Sep 4 03:34:42 2010, Dmass, Computing, DAQ, Undocumented change?
|
Mon Sep 6 16:23:19 2010, Dmass, Computing, DAQ, SSHD (re?)started
|
Wed Sep 1 20:31:26 2010, Dmass, Electronics, Doubling, Calibration Line
|
Thu Sep 2 19:10:04 2010, Dmass, Electronics, Doubling, Calibration Line 
|
Fri Sep 3 10:21:29 2010, Koji, Electronics, Doubling, Calibration Line
|
Tue Aug 31 22:07:03 2010, Dmass, Computing, DAQ, mDV NDS DTT DV etc
|
Wed Sep 1 00:13:32 2010, Frank, Computing, DAQ, mDV NDS DTT DV etc
|
Wed Sep 1 00:33:56 2010, Dmass, Computing, DAQ, mDV NDS DTT DV etc
|
Tue Aug 31 23:02:35 2010, Frank, Computing, DAQ, current channel list on fb1 - note to remove dead/unused channels
|
Tue Aug 31 01:19:12 2010, Dmass, Computing, DAQ, Foton and DTT brokeded
|
Tue Aug 31 02:37:53 2010, rana, Computing, DAQ, Foton and DTT brokeded
|
Tue Aug 31 12:30:40 2010, Frank, Computing, DAQ, Foton and DTT brokeded
|
Tue Aug 31 13:12:14 2010, Frank, Computing, DAQ, changed default shell on fb1 back to bash
|
Tue Aug 31 21:06:02 2010, Dmass, Computing, DAQ, FB1 SOFTWARE FREEZE
|
Tue Aug 31 21:46:21 2010, Dmass, Computing, DAQ, changed default shell on fb1 back to bash
|
Sun Aug 29 23:04:17 2010, rana, Lab Infrastructure, stuff happens, lab cleanup
|
Thu Aug 26 16:27:54 2010, Frank, Computing, DAQ, fb1 down?
|
Thu Aug 26 16:42:01 2010, Dmass, Computing, DAQ, fb1 down?
|
Thu Aug 26 17:00:12 2010, Frank, Computing, DAQ, fb1 down?
|
Thu Aug 26 19:45:52 2010, Dmass, Computing, DAQ, fb1 down?
|
Thu Aug 26 19:52:15 2010, Frank, Computing, DAQ, fb1 down?
|
Thu Aug 26 21:59:32 2010, Dmass, Computing, DAQ, fb1 down?
|
Fri Aug 27 11:20:54 2010, Zach, Computing, DAQ, fb1 down?
|
Fri Aug 27 16:55:55 2010, Frank, Computing, DAQ, working mDV example
|
Thu Aug 26 01:01:34 2010, Zach, Laser, GYRO, gyro back to gyro configuration 
|
Fri Aug 27 11:51:41 2010, Zach, Laser, GYRO, gyro back to gyro configuration
|
Wed Aug 25 01:28:35 2010, rana, Things to Buy, GYRO, Possible Vacuum system for the GYRO
|
Thu Aug 26 01:10:11 2010, Alastair, Things to Buy, GYRO, Possible Vacuum system for the GYRO
|
Thu Aug 26 17:09:08 2010, Alastair, Things to Buy, GYRO, Possible Vacuum system for the GYRO
|
Wed Aug 25 16:54:57 2010, Dmass, Computing, Doubling, nds server down?
|
Thu Aug 26 15:57:54 2010, Frank, Computing, Doubling, nds server down?
|
Fri Aug 20 15:36:01 2010, Dmass, Laser, Doubling, Spectrum Incoming.
|
Wed Aug 25 22:18:35 2010, Dmass, Laser, Doubling, Spectrum Incoming.
|
Wed Aug 25 22:58:12 2010, rana, Laser, Doubling, Spectrum Incoming.
|
Tue Aug 24 18:37:37 2010, Zach, Laser, GYRO, Gyro "single-arm" test
|
Tue Aug 24 19:24:58 2010, rana, Laser, GYRO, Gyro "single-arm" test
|
Tue Aug 24 20:06:16 2010, Zach, Laser, GYRO, Gyro "single-arm" test
|
Wed Aug 25 01:02:17 2010, rana, Laser, GYRO, Gyro "single-arm" test
|
Wed Aug 25 01:09:43 2010, Zach, Laser, GYRO, Gyro "single-arm" test
|
Tue Aug 24 18:52:50 2010, Dmass, Laser, Doubling, Notes
|
Mon Aug 23 20:56:44 2010, Zach, Computing, GYRO, New channels acquired
|
Tue Aug 24 15:50:22 2010, Dmass, Computing, GYRO, New channels acquired
|
Tue Aug 24 16:47:41 2010, Zach, Computing, GYRO, New channels acquired
|
Thu Aug 19 22:04:55 2010, Alastair & Rana, Computing, Computing, Front end rebuilt
|
Fri Aug 20 03:11:50 2010, rana, Computing, CDS, Front end rebuilt ----- BURT notes
|
Sat Aug 21 01:50:57 2010, rana, Computing, CDS, Front end rebuilt ----- BURT notes
|
Sat Aug 21 14:28:14 2010, Aidan, Computing, CDS, Front end rebuilt ----- BURT notes
|
Tue Aug 24 15:10:36 2010, Dmass, Computing, CDS, Front end rebuilt ----- BURT notes
|
Tue Aug 24 02:18:09 2010, Zach, Laser, GYRO, Gyro table displacement noise spectrum
|
Tue Aug 24 12:32:41 2010, Jenna, Laser, GYRO, Gyro table displacement noise spectrum
|
Tue Aug 24 02:38:42 2010, Zach, Laser, stuff happens, ThorLabs power meter head appears damaged
|
Tue Aug 24 03:00:20 2010, Dmass, Laser, stuff happens, ThorLabs power meter head appears damaged
|
Mon Aug 23 13:13:07 2010, Zach, Misc, GYRO, PDH box info put in wiki
|
Sat Aug 21 01:06:04 2010, Zach, Laser, GYRO, still noisy (till the day I die)
|
Fri Aug 20 21:58:43 2010, Zach, Electronics, GYRO, PDH box S/N: 2215 transfer function
|
Fri Aug 20 00:56:03 2010, Frank, Computing, DAQ, PSL RT fronend code shutdown
|
Thu Aug 19 11:44:23 2010, Alastair, Lab Infrastructure, Computing, Wiki
|
Thu Aug 19 13:18:17 2010, Alastair, Lab Infrastructure, Computing, Wiki
|
Wed Aug 18 21:14:49 2010, rana, Computing, General, The BURT situation
|
Thu Aug 19 11:17:43 2010, Frank, Computing, General, The BURT situation
|
Thu Aug 19 11:23:44 2010, Rana, Computing, General, The BURT situation
|
Thu Aug 19 12:01:13 2010, Frank, Computing, General, The BURT situation
|
Thu Aug 19 12:22:25 2010, Alastair, Computing, General, The BURT situation
|
Thu Aug 19 11:33:31 2010, Alastair, Lab Infrastructure, Computing, router...
|
Thu Aug 19 11:49:15 2010, Frank, Lab Infrastructure, Computing, router...
|
Thu Aug 19 04:11:09 2010, Dmass, Laser, Doubling, PMC problem solved?
|
Wed Aug 18 20:15:45 2010, rana, Computing, DAQ, Never use lower case in MEDM/DAQ/CDS
|
Wed Aug 18 18:15:49 2010, Alastair, Zach and Rana, Laser, GYRO, PDH locking of the CCW loop 
|
Wed Aug 18 12:03:23 2010, Alastair, Electronics, GYRO, PDH boxes 
|
Wed Aug 18 11:52:00 2010, Alastair, Lab Infrastructure, General, Internet in lab was down again
|
Mon Aug 16 14:19:00 2010, Alastair, Laser, GYRO, Changed to Marconi on AOM
|
Mon Aug 16 15:31:27 2010, Zach, Laser, GYRO, Changed to Marconi on AOM
|
Tue Aug 17 10:18:02 2010, rana, Laser, GYRO, Changed to Marconi on AOM
|
Tue Aug 17 15:34:02 2010, Alastair, Laser, GYRO, Changed to Marconi on AOM
|
Wed Aug 18 03:01:23 2010, rana, Laser, GYRO, Excess noise mystery resolved
|
Wed Aug 18 10:31:28 2010, Alastair, Laser, GYRO, Excess noise mystery resolved
|
Mon Aug 16 19:01:20 2010, Alastair, Laser, GYRO, Noisy noise stuff
|
Mon Aug 16 12:33:08 2010, Alastair, Lab Infrastructure, ANTS!, How do we get rid of ants?
|
Mon Aug 16 13:25:03 2010, Zach, Lab Infrastructure, ANTS!, How do we get rid of ants?
|
Mon Aug 16 18:36:59 2010, Jenne, Lab Infrastructure, ANTS!, How do we get rid of ants?
|
Mon Aug 16 18:56:28 2010, 1954 B-movie, Lab Infrastructure, ANTS!, How do we get rid of ants?
|
Fri Aug 13 18:22:04 2010, Jenna, Laser, GYRO, Successful PLL
|
Thu Aug 12 18:32:37 2010, Alastair, Laser, GYRO, Beam overlap etc  
|
Fri Aug 13 15:50:39 2010, Jenna, Laser, GYRO, Beam overlap etc
|
Thu Aug 12 22:55:22 2010, Jenna, Laser, GYRO, Pictures   
|
Thu Aug 12 23:26:06 2010, Zach, Laser, GYRO, Pictures
|
Fri Aug 13 00:11:46 2010, Jenna, Laser, GYRO, Pictures
|
Fri Aug 13 10:18:20 2010, Jenna, Laser, GYRO, Pictures
|
Wed Aug 11 18:51:13 2010, Alastair, Laser, GYRO, attempted PLL
|
Wed Aug 11 22:42:52 2010, Koji, Laser, GYRO, attempted PLL
|
Tue Aug 10 20:29:53 2010, Jenna, Laser, GYRO, PD in transmission
|
Tue Aug 10 22:02:04 2010, Zach, Laser, GYRO, PD in transmission
|
Tue Aug 10 23:44:17 2010, rana, Laser, GYRO, PD in transmission
|
Wed Aug 11 14:36:54 2010, Alastair, Laser, GYRO, PD in transmission
|
Tue Aug 10 19:22:19 2010, Jenna, Laser, GYRO, Cavity is locking again!
|
Tue Aug 10 18:48:09 2010, Jenna, Laser, GYRO, Error signal investigations 
|
Tue Aug 10 18:23:46 2010, Jenna, Laser, GYRO, Error signal investigations 
|
Wed Aug 4 20:28:03 2010, Alastair, Laser, GYRO, Locking....
|
Wed Aug 4 23:19:19 2010, Alastair, Laser, GYRO, Locking....
|
Mon Aug 9 18:36:14 2010, rana, Laser, GYRO, Zach is feeeling excluded from this lack of locking
|
Mon Aug 9 20:48:38 2010, Dmass, Laser, GYRO, Zach is feeeling excluded from this lack of locking
|
Tue Aug 10 13:44:49 2010, Zach, Laser, GYRO, Zach is feeeling excluded from this lack of locking
|
Mon Aug 9 00:46:48 2010, Frank, Computing, General, netgpib
|
Fri Jul 30 13:38:56 2010, Dmass, Laser, Doubling, Mode Matching for Ovens
|
Tue Aug 3 21:43:40 2010, Dmass, Laser, Doubling, Mode Matching for Ovens
|
Tue Aug 3 23:15:14 2010, Dmass, Laser, Doubling, Mode Matching for Ovens
|
Wed Aug 4 17:21:56 2010, Alastair, Laser, Doubling, Mode Matching for Ovens
|
Sat Aug 7 19:04:07 2010, Dmass, Laser, Doubling, Mode Matching for Ovens
|
Sun Aug 1 23:16:45 2010, Dmass, Lab Infrastructure, General, WHERE IS THE WINCAMD? 
|
Mon Aug 2 00:50:58 2010, Zach, Lab Infrastructure, General, WHERE IS THE WINCAMD?
|
Mon Aug 2 12:24:01 2010, Dr. Evil, Lab Infrastructure, General, WHERE IS THE WINCAMD?
|
Mon Aug 2 14:15:10 2010, Dmass, Lab Infrastructure, General, WHERE IS THE WINCAMD?
|
Mon Aug 2 16:11:41 2010, Homer, Lab Infrastructure, General, WHERE IS THE WINCAMD?
|
Mon Aug 2 21:02:19 2010, Dmass, Lab Infrastructure, General, PMC Waist
|
Fri Aug 6 14:12:22 2010, Dmass, Lab Infrastructure, General, WHERE IS THE WINCAMD?  
|
Fri Aug 6 16:56:58 2010, Aidan, Lab Infrastructure, General, WHERE IS THE WINCAMD?
|
Sat Aug 7 13:45:52 2010, Dmass, Lab Infrastructure, General, WHERE IS THE WINCAMD?
|
Sat Aug 7 13:45:13 2010, Frank, Lab Infrastructure, General, wireless GPIB network devices now available
|
Fri Aug 6 00:44:06 2010, Frank, Lab Infrastructure, General, wifi bridges configured
|
Wed Aug 4 18:52:18 2010, Jenna, Laser, GYRO, AOM Feedback Signal
|
Wed Aug 4 20:26:30 2010, rana, Laser, GYRO, AOM Feedback Signal
|
Wed Aug 4 20:34:48 2010, Alastair, Laser, GYRO, AOM Feedback Signal
|
Wed Aug 4 17:24:11 2010, Alastair, Laser, GYRO, Photodiode for transmission
|
Wed Jul 14 14:39:09 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Thu Jul 15 15:41:40 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Fri Jul 16 18:54:57 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Sat Jul 17 01:41:20 2010, Koji, Laser, PSL, H1 NPRO Measured
|
Wed Jul 21 20:13:06 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Thu Jul 22 16:19:48 2010, Koji, Laser, PSL, H1 NPRO Measured
|
Fri Jul 23 00:45:46 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Tue Jul 27 00:10:20 2010, Dmass, Laser, PSL, PMC Calibrated
|
Tue Jul 27 19:04:35 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Wed Jul 28 19:51:10 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Fri Jul 30 16:48:11 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Sun Aug 1 18:37:07 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Mon Aug 2 00:46:13 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Mon Aug 2 22:23:36 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Tue Aug 3 01:31:15 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Tue Aug 3 13:47:55 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Tue Aug 3 17:27:20 2010, Dmass, Laser, PSL, H1 NPRO Measured
|
Mon Aug 2 16:30:34 2010, Jenne, Misc, PEM, Guralp Stuff removed to the 40m
|
Fri Jul 30 19:11:10 2010, Alastair, Laser, GYRO, Rubidium
|
Fri Jul 30 15:36:22 2010, Dmass, Computing, DAQ, Elog changes to the framebuilder
|
Fri Jul 30 01:56:07 2010, Dmass, Lab Infrastructure, Purchases, Bought some lenses
|
Thu Jul 29 12:09:56 2010, Alastair, Laser, GYRO, Seismometer Measurements Continued
|
Fri Jul 30 00:48:11 2010, Dmass, Laser, GYRO, Seismometer Measurements Continued
|
Thu Jul 29 20:05:05 2010, Alastair, Laser, GYRO, Rubidium clocks
|
Thu Jul 29 19:19:42 2010, Alastair, Laser, GYRO, CW beam alignment
|
Thu Jul 29 13:20:13 2010, Alastair, Computing, General, Dataviewer
|
Wed Jul 28 21:18:44 2010, Alastair, Laser, GYRO, Rubidium clock
|
Tue Jul 27 14:46:42 2010, Jenna, Laser, GYRO, Seismometer Measurements 
|
Thu Jul 22 10:13:31 2010, Alastair, Laser, GYRO, GYRO update
|
Thu Jul 22 21:27:23 2010, Zach, Laser, GYRO, GYRO update
|
Thu Jul 22 20:07:20 2010, Dmass, Computing, DAQ, FB0 Problem...fixed
|
Tue May 18 09:43:55 2010, Aidan, Computing, DAQ, Killed the DAQD process. It restarted automatically.
|
Tue Jul 20 18:12:02 2010, Aidan, Computing, DAQ, Killed the DAQD process. It restarted automatically.
|
Wed Jul 21 13:59:29 2010, Dmass, Computing, DAQ, Killed the DAQD process. It restarted automatically.
|
Wed Jul 21 14:20:54 2010, Jenne, Computing, DAQ, Killed the DAQD process. It restarted automatically.
|
Wed Jul 21 20:08:53 2010, Dmass, Computing, DAQ, Killed the DAQD process. It restarted automatically.
|
Wed Jul 21 14:21:17 2010, Dmass, Laser, PSL, Characterizing the H1 NPRO  
|
Tue Jul 20 15:44:07 2010, Aidan, Computing, General, Fixed two new static IP addresses for TCS machines
|
Fri Jul 16 19:23:27 2010, Alastair, Laser, Fugly, noise measurement of locked cavity 
|
Mon Jul 19 13:34:39 2010, Zach, Laser, GYRO, noise measurement of locked cavity
|
Wed Jul 14 21:48:02 2010, Jenna, Laser, GYRO, CCW Lock
|
Mon Jul 12 18:48:15 2010, Jenna, Misc, GYRO, Translation Stages from 40m
|
Mon Jul 12 13:16:59 2010, Jenna, Laser, GYRO, CCW Alignment 
|
Thu Jul 8 00:16:43 2010, Dmass, Laser, Doubling, Forty Two
|
Thu Jul 8 13:17:01 2010, Dmass, Laser, Doubling, Forty Two
|
Wed Jul 7 13:59:26 2010, Jenna, Laser, GYRO, Mode Matching 
|
Tue Jul 6 21:07:42 2010, rana, Things to Buy, GYRO, IR viewer missing: found in TCS lab
|
Thu Jul 1 17:47:19 2010, Jenna, Laser, GYRO, Mode Matching Solution
|
Wed Jun 30 18:19:47 2010, Jenna, Laser, GYRO, Cavity Mirrors
|
Tue Jun 29 14:27:10 2010, Jenna, Laser, GYRO, Comparison of frequency noise and mechanical noise for the gyro cavity
|
Tue Jun 29 15:41:01 2010, Alastair, Laser, GYRO, Comparison of frequency noise and mechanical noise for the gyro cavity
|
Tue Jun 29 17:48:31 2010, Zach, Laser, GYRO, Comparison of frequency noise and mechanical noise for the gyro cavity
|
Wed Jun 30 00:35:28 2010, rana, Laser, GYRO, Comparison of frequency noise and mechanical noise for the gyro cavity
|
Mon Jun 28 17:33:32 2010, Jenna, Laser, GYRO, Mode Matching
|
Tue Jun 29 00:40:53 2010, Dmass, Laser, GYRO, Mode Matching
|
Tue Jun 29 13:12:56 2010, Alastair, Laser, GYRO, Mode Matching
|
Mon Jun 28 01:36:57 2010, Frank, Computing, General, currently no access to ATF from outside
|
Mon Jun 28 16:13:21 2010, Aidan, Computing, General, currently no access to ATF from outside
|
Mon Jun 21 20:46:40 2010, Dmass, Computing, General, Oven interfacing
|
Tue Jun 22 19:17:27 2010, Dmass, Computing, General, Oven interfacing
|
Tue Jun 22 21:53:24 2010, Dmass, Computing, General, Oven interfacing
|
Wed Jun 23 15:59:13 2010, Dmass, Computing, General, Oven interfacing
|
Wed Jun 23 21:53:50 2010, Dmass, Computing, General, Oven interfacing
|
Thu Jun 24 21:18:49 2010, Dmass, Computing, General, Oven interfacing
|
Sun Jun 27 18:02:51 2010, Dmass, Computing, General, Oven interfacing
|
Thu Jun 24 18:49:04 2010, Frank, Misc, General, USB-to-serial converter back at 40m
|
Wed Jun 23 18:15:59 2010, Aidan, Lab Infrastructure, HVAC, New temperature controllers  
|
Wed Jun 23 17:57:00 2010, Frank, Lab Infrastructure, HVAC, temperature fluctuations - before and after 
|
Wed Jun 23 13:47:01 2010, Frank, Lab Infrastructure, HVAC, latest particle counts
|
Sat Jun 19 19:20:29 2010, rana, Electronics, GYRO, IFR / Marconi Phase noise w/ Rubidium clock lock
|
Mon Jun 21 09:44:31 2010, Frank, Electronics, GYRO, IFR / Marconi Phase noise w/ Rubidium clock lock
|
Fri Jun 11 20:33:17 2010, Dmass, Computing, DAQ, Attempt at oven transfer functions
|
Wed Jun 16 15:54:20 2010, Dmass, Computing, DAQ, Attempt at oven transfer functions
|
Wed Jun 16 23:10:28 2010, Dmass, Computing, DAQ, Attempt at oven transfer functions
|
Thu Jun 17 15:14:58 2010, Dmass, Computing, DAQ, Attempt at oven transfer functions
|
Fri Jun 18 18:04:23 2010, Dmass, Computing, DAQ, Attempt at oven transfer functions
|
Fri Jun 18 18:07:53 2010, Dmass, Computing, DAQ, Attempt at oven transfer functions
|
Thu Jun 17 11:05:42 2010, Frank, Lab Infrastructure, HVAC, HVAC now working again
|
Fri Jun 18 00:48:11 2010, rana, Lab Infrastructure, HVAC, HVAC now working again
|
Fri Jun 4 23:22:41 2010, Dmass, Electronics, Doubling, Oven Control Updates
|
Tue Jun 15 23:47:09 2010, Dmass, Electronics, Doubling, Oven Control Updates
|
Mon Jun 14 14:40:10 2010, Frank, Misc, General, company for temp ctrls and diode drivers
|
Fri Jun 11 21:27:50 2010, Koji, Computing, General, X11 on WS1 can not find nVidia driver
|
Thu Jun 10 21:18:18 2010, Dmass, Computing, DAQ, FB0 fixed
|
Fri Jun 11 02:44:09 2010, Frank, Computing, DAQ, FB0 fixed
|
Tue Jun 8 10:49:34 2010, Frank, Lab Infrastructure, General, several things offline / not working as usual
|
Wed Jun 9 15:13:15 2010, Alastair, Lab Infrastructure, General, several things offline / not working as usual
|
Thu Jun 10 02:08:15 2010, Frank, Lab Infrastructure, General, several things offline / not working as usual
|
Tue Jun 8 10:35:16 2010, Aidan, Misc, stuff happens, Moved some equipment to 40m
|
Thu Jun 3 10:59:37 2010, Frank, Computing, DAQ, fb0 reboot
|
Fri Jun 4 13:52:44 2010, Frank, Computing, DAQ, fb0 reboot
|
Fri Jun 4 21:32:54 2010, Frank, Computing, DAQ, fb0 reboot
|
Wed May 19 22:40:19 2010, Dmass, Electronics, Doubling, Oddness with my box 
|
Wed May 19 23:33:18 2010, Dmass, Electronics, Doubling, Oddness with my box
|
Thu May 20 00:41:51 2010, Koji, Electronics, Doubling, Oddness with my box
|
Thu May 20 21:43:01 2010, Dmass, Electronics, Doubling, Oddness with my box
|
Fri May 21 17:42:29 2010, Dmass, Electronics, Doubling, The Box Itself 
|
Fri Jun 4 13:46:26 2010, Dmass, Electronics, Doubling, The Box Itself
|
Thu Jun 3 18:29:10 2010, Alastair & Rana, Laser, GYRO, Mode matching and cavity alignment
|
Thu Jun 3 15:49:06 2010, Frank, Computing, DAQ, fb0 still not working, plz reboot it - can't work since a week
|
Thu Jun 3 03:24:41 2010, Dmass, Lab Infrastructure, Fugly, Rack terrible-ness
|
Wed Jun 2 07:16:38 2010, Frank, Computing, DAQ, fb0 down?
|
Thu Jun 3 03:23:09 2010, Dmass, Computing, DAQ, fb0 down?
|
Wed Jun 2 20:24:26 2010, rana, alastair, Misc, GYRO, Optics moved
|
Fri May 7 16:51:09 2010, Frank, Lab Infrastructure, General, particle counter
|
Wed Jun 2 17:59:57 2010, rana, Lab Infrastructure, General, particle counter + lab temp
|
Wed Jun 2 11:20:02 2010, Alastair, Laser, GYRO, Mirror transmission
|
Wed Jun 2 14:05:59 2010, Alastair, Laser, GYRO, Mirror transmission
|
Wed Jun 2 17:11:58 2010, Zach, Laser, GYRO, Mirror transmission
|
Wed Jun 2 09:37:03 2010, Alastair, Lab Infrastructure, General, Particle count
|
Wed May 26 17:13:07 2010, Aidan, Lab Infrastructure, stuff happens, Moved a New Focus 9071 4-axis stage to 40m for doubling
|
Tue May 25 08:27:44 2010, Alastair, Laser, GYRO, PDH box 1 
|
Mon May 24 17:35:41 2010, Aidan, Laser, General, Lasers powered down
|
Mon May 24 11:02:14 2010, Zach, Lab Infrastructure, HVAC, Duct sealing photo summary 38x
|
Wed May 5 18:14:42 2010, Dmass, Laser, Doubling, Massive Update
|
Wed May 19 19:33:55 2010, Dmass, Laser, Doubling, More Update   
|
Wed May 19 19:54:40 2010, Dmass, Laser, Doubling, Massive Update
|
Mon May 17 16:46:23 2010, Alastair, Things to Buy, GYRO, mirrors
|
Thu May 13 20:47:34 2010, Frank, Computing, DAQ, fb0 online again
|
Sat May 8 01:08:42 2010, Frank, Computing, DAQ, fb0 fixed
|
Wed May 12 23:20:38 2010, Dmass, Computing, DAQ, fb0 fixed
|
Wed May 12 19:12:30 2010, Frank, Misc, General, lab temp back to normal
|
Wed May 12 14:44:18 2010, Frank, Misc, General, lab temperature
|
Wed May 12 11:17:50 2010, Frank, Lab Infrastructure, PEM, new, temporary sensor in corridor
|
Wed May 12 11:12:25 2010, Frank, Misc, General, the lab this morning
|
Wed May 12 03:48:07 2010, rana, Lab Infrastructure, HVAC, status
|
Tue May 11 16:53:08 2010, Alastair, Rana, Lab Infrastructure, HVAC, Particle count and temperature  
|
Tue May 11 20:12:54 2010, Zach, Lab Infrastructure, HVAC, Particle count and temperature
|
Tue May 11 21:03:57 2010, Alastair, Lab Infrastructure, HVAC, Particle count and temperature
|
Mon May 10 15:48:22 2010, Zach, Misc, General, camera at my desk
|
Sat May 8 17:24:55 2010, Zach, Misc, General, function for calculating parameters of an arbitrary cavity 
|
Sat May 8 13:53:01 2010, Zach, Laser, GYRO, cavity spectrum  
|
Tue Apr 27 11:46:30 2010, Zach, Misc, General, Where is the camera??
|
Wed Apr 28 15:28:04 2010, Zach, Misc, General, Where is the camera??
|
Fri May 7 16:40:31 2010, Frank, Misc, General, Where is the camera??
|
Fri May 7 15:52:58 2010, Frank, Misc, Pulser, basic diagram for diode pulsing-test
|
Tue Apr 20 22:33:59 2010, Frank, Computing, DAQ, fb0 up again and working
|
Fri May 7 14:39:01 2010, Dmass, Computing, DAQ, fb0 up again and working
|
Thu May 6 19:45:10 2010, Dmass, Laser, stuff happens, Chalkboard
|
Fri May 7 03:22:50 2010, Bob, Laser, Doubling, Chalkboard
|
Fri May 7 11:15:58 2010, Bob, Laser, Doubling, Chalkboard
|
Fri May 7 07:42:09 2010, Aidan, Lab Infrastructure, HVAC, Re-sealing and laser keys
|
Fri May 7 10:16:24 2010, Zach, Lab Infrastructure, HVAC, Re-sealing and laser keys
|
Fri May 7 11:10:17 2010, Alastair, Lab Infrastructure, HVAC, Re-sealing and laser keys
|
Tue May 4 12:06:37 2010, Zach, Laser, GYRO, 6-m mirrors are OK--back to the drawing board
|
Wed May 5 15:09:35 2010, Zach, Laser, GYRO, 6-m mirrors are OK--back to the drawing board
|
Mon May 3 11:59:28 2010, Zach, Laser, GYRO, modifications
|
Mon May 3 12:19:52 2010, rana, Laser, GYRO, modifications
|
Wed Apr 28 19:57:19 2010, Dmass, Laser, PSL, KEYS TO 35W MISSING
|
Wed Apr 28 10:16:09 2010, Frank, Lab Infrastructure, General, lab cleanliness - latest particle counts
|
Wed Apr 28 11:19:36 2010, Alastair, Lab Infrastructure, General, lab cleanliness - latest particle counts
|
Wed Apr 28 13:21:11 2010, Alastair, Lab Infrastructure, General, lab cleanliness - latest particle counts
|
Wed Apr 28 14:57:14 2010, rana, Lab Infrastructure, General, lab cleanliness - latest particle counts
|
Wed Apr 28 19:10:57 2010, Dmass, Lab Infrastructure, General, lab cleanliness - latest particle counts
|
Wed Apr 28 15:39:45 2010, Zach, Lab Infrastructure, General, marking remaining holes
|
Wed Apr 28 19:07:07 2010, Frank, Lab Infrastructure, General, marking remaining holes
|
Wed Apr 28 09:24:01 2010, Aidan, Computing, fubar, elog craziness - test to try and crash elog
|
Fri Apr 23 17:20:34 2010, Zach, Electronics, GYRO, RFPD circuit
|
Tue Apr 20 19:54:24 2010, Frank, Computing, DAQ, card identification
|
Tue Apr 20 18:54:18 2010, Frank, Computing, DAQ, DAQ odyssey - part 2
|
Mon Apr 19 19:11:31 2010, Frank, Computing, DAQ, front-end down due to major software changes
|
Mon Apr 19 19:09:42 2010, Frank, Computing, DAQ, todays DAQ odyssey - part 1
|
Sun Apr 18 18:34:50 2010, Frank, Lab Infrastructure, General, router keeps diconnecting, backup connection installed
|
Sat Apr 17 19:05:50 2010, Frank, Lab Infrastructure, General, router problems
|
Tue Apr 13 15:32:51 2010, Koji, Laser, Doubling, Both MZ and ISS locked
|
Wed Apr 14 16:00:56 2010, Dmass, Laser, Doubling, Both MZ and ISS locked
|
Tue Apr 13 00:19:00 2010, Mott, Frank, Computing, DAQ, fb0 boot disk copies
|
Fri Apr 9 21:19:33 2010, Frank, Computing, DAQ, fb0 online again
|
Mon Mar 22 15:01:24 2010, Dmass, Laser, ISS, ISS Spectra   
|
Tue Mar 23 15:01:29 2010, Dmass, Laser, ISS, ISS Spectra 
|
Tue Mar 23 17:05:11 2010, Dmass, Laser, ISS, ISS Spectra
|
Tue Mar 23 21:24:57 2010, Dmass, Laser, ISS, ISS Spectra
|
Wed Mar 24 00:09:39 2010, Dmass, Laser, ISS, ISS Spectra
|
Wed Mar 24 22:12:49 2010, Mott, Laser, ISS, fb0 error
|
Fri Mar 26 17:05:43 2010, Mott, Laser, ISS, fb0 error
|
Tue Mar 30 16:44:20 2010, Mott, Laser, ISS, fb0 error
|
Fri Apr 9 11:35:56 2010, Mott, Laser, ISS, fb0 error
|
Thu Mar 25 02:06:53 2010, Dmass, Laser, ISS, ISS Spectra
|
Thu Mar 25 02:38:54 2010, Koji, Laser, ISS, ISS Spectra
|
Thu Mar 25 10:38:24 2010, mevans, Laser, ISS, ISS Spectra
|
Thu Mar 25 13:29:18 2010, Dmass, Laser, ISS, ISS Spectra
|
Thu Mar 25 14:16:32 2010, Dmass, Laser, ISS, MZ Spectra! 
|
Fri Apr 9 11:26:08 2010, Mott, Lab Infrastructure, General, GPIB Controllers
|
Tue Apr 6 11:51:15 2010, Koji, Laser, Doubling, MZ lock 
|
Wed Apr 7 21:29:48 2010, Dmass, Laser, Doubling, MZ lock
|
Wed Apr 7 19:12:47 2010, Zach, Laser, GYRO, Y1S reflectivities
|
Tue Apr 6 21:32:42 2010, Frank, Computing, General, spare hard disks
|
Tue Apr 6 21:06:21 2010, Frank, Misc, Pulser, diode damage tests
|
Mon Apr 5 14:46:05 2010, Alastair, Laser, GYRO, CCW locking
|
Fri Apr 2 19:54:27 2010, Alastair, Laser, GYRO, Box
|
Thu Mar 25 12:40:28 2010, Alastair, Things to Buy, General, Shoe covers on order - should be here in about 2 days
|
Wed Mar 24 20:09:49 2010, Zach & Alastair, Laser, GYRO, noise/signal diagram
|
Tue Mar 23 21:05:45 2010, Frank, Lab Infrastructure, General, laser safety sign replacement bulbs
|
Tue Mar 23 10:22:31 2010, Alastair, Laser, GYRO, Notch filter 
|
Tue Mar 23 10:32:46 2010, Zach, Laser, GYRO, Notch filter
|
Tue Mar 23 10:41:58 2010, Alastair, Laser, GYRO, Notch filter
|
Mon Mar 22 23:12:10 2010, Zach, Laser, GYRO, looking in the wrong place?
|
Tue Mar 23 10:10:20 2010, Alastair, Laser, GYRO, looking in the wrong place?
|
Tue Mar 23 10:22:30 2010, Zach, Laser, GYRO, looking in the wrong place?
|
Sat Mar 20 20:36:53 2010, Dmass, Laser, PSL, Power Steps
|
Mon Mar 22 19:46:06 2010, Dmass, Laser, PSL, Power Steps
|
Fri Mar 19 16:52:51 2010, Dmass, Laser, Doubling, Time Stamps
|
Fri Mar 19 21:25:48 2010, Dmass, Laser, Doubling, Time Stamps
|
Fri Mar 19 22:50:20 2010, Dmass, Laser, Doubling, Time Stamps 
|
Sat Mar 20 19:03:34 2010, Dmass, Laser, Doubling, Time Stamps
|
Fri Mar 19 15:20:47 2010, Dmass, Computing, DAQ, Foton Broken?
|
Thu Mar 18 16:47:36 2010, Alastair, Lab Infrastructure, GYRO, Enclosure not yet ready...
|
Wed Mar 17 16:18:32 2010, Dmass, Laser, PSL, Realignment
|
Wed Mar 17 20:17:27 2010, Dmass, Laser, PSL, Realignment
|
Thu Mar 18 16:26:06 2010, Dmass, Laser, PSL, Realignment
|
Thu Mar 18 15:59:46 2010, Frank, Laser, stuff happens, Amplifier service
|
Wed Mar 17 18:01:16 2010, Alastair, Laser, GYRO, First sensitivity curve
|
Wed Mar 17 18:57:55 2010, Alastair, Laser, GYRO, Second sensitivity curve
|
Wed Mar 17 09:12:34 2010, Koji, Laser, PMC, PSL glitch investigation
|
Tue Mar 16 17:34:35 2010, Alastair & Zach, Laser, GYRO, GYRO CAVITY LOCKED IN BOTH DIRECTIONS  
|
Wed Mar 17 05:19:24 2010, rana, Laser, GYRO, GYRO CAVITY LOCKED IN BOTH DIRECTIONS
|
Wed Mar 17 08:48:32 2010, Aidan, Laser, GYRO, GYRO CAVITY LOCKED IN BOTH DIRECTIONS
|
Tue Mar 16 16:57:34 2010, Alastair, Lab Infrastructure, GYRO, Rehousing stuff
|
Fri Mar 12 17:27:22 2010, Alastair, Laser, GYRO, Isomet shmisomet
|
Sat Mar 13 07:32:20 2010, rana, Electronics, GYRO, Isomet shmisomet
|
Sat Mar 13 11:45:20 2010, Alastair, Electronics, GYRO, Isomet shmisomet
|
Fri Mar 12 21:44:28 2010, Dmass, Laser, Doubling, Data Time Stamps for LV Meeting
|
Thu Mar 11 14:52:28 2010, Zach, Laser, GYRO, A tale of two PDs
|
Fri Mar 12 09:18:44 2010, Alastair, Laser, GYRO, A tale of two PDs
|
Thu Mar 11 02:04:24 2010, Dmass, Laser, ISS, ISS Woes
|
Thu Mar 11 02:36:04 2010, Dmass, Laser, ISS, ISS Woes
|
Wed Mar 10 13:41:17 2010, Zach, Laser, GYRO, CW error signal nonexistent
|
Wed Mar 10 16:36:45 2010, Alastair, Laser, GYRO, CW error signal nonexistent
|
Wed Mar 10 18:34:10 2010, rana, Laser, GYRO, CW error signal nonexistent
|
Tue Mar 9 21:13:24 2010, Dmass, Laser, ISS, Adding ISS
|
Tue Mar 9 23:55:29 2010, Dmass, Laser, ISS, Adding ISS
|
Wed Mar 10 12:52:10 2010, Dmass, Laser, ISS, Adding ISS
|
Mon Mar 8 21:22:56 2010, Zach, Laser, GYRO, summing amp for CW loop
|
Tue Mar 9 12:10:03 2010, rana, Laser, GYRO, summing amp for CW loop
|
Tue Mar 9 12:38:40 2010, Zach, Laser, GYRO, summing amp for CW loop
|
Mon Mar 8 02:19:45 2010, Dmass, Electronics, Doubling, AC Coupling...
|
Mon Mar 8 21:25:22 2010, Dmass, Electronics, Doubling, AC Coupling...  
|
Tue Mar 9 03:59:51 2010, Dmass, Electronics, Doubling, AC Coupling... 8x
|
Tue Mar 9 00:24:30 2010, Dmass, Laser, Doubling, Mach Zehnder Contrast
|
Mon Mar 8 21:54:01 2010, Zach, Laser, GYRO, update
|
Mon Mar 8 13:53:42 2010, Dmass, Computing, DAQ, Don't do this to the front end...
|
Mon Mar 8 21:06:35 2010, Zach, Computing, DAQ, Don't do this to the front end...
|
Sat Mar 6 15:02:37 2010, Dmass, Computing, DAQ, Test Points Busted
|
Fri Mar 5 16:23:51 2010, Alastair, Laser, GYRO, Locking and other stuff
|
Fri Mar 5 15:46:15 2010, Mott, Laser, Fiber, Mode Shape of Fiber Laser
|
Thu Mar 4 20:41:42 2010, Alastair, Laser, GYRO, Finesse measurement
|
Thu Mar 4 22:18:05 2010, Zach, Laser, GYRO, Finesse measurement
|
Thu Mar 4 22:33:15 2010, rana, Laser, GYRO, Finesse measurement
|
Fri Mar 5 09:12:06 2010, Alastair, Laser, GYRO, Finesse measurement
|
Fri Mar 5 13:25:21 2010, Koji, Laser, GYRO, Finesse measurement
|
Thu Mar 4 01:38:40 2010, rana, Electronics, GYRO, UPDH box s/n 1437 examined
|
Fri Mar 5 02:42:03 2010, rana, Electronics, GYRO, UPDH box s/n 1437 upgraded 
|
Fri Mar 5 00:46:10 2010, Dmass, Laser, Doubling, Mach Zehnder Rebuild 
|
Fri Mar 5 00:12:56 2010, rana, Electronics, General, Voltage Regulator Noise w/ the python GPIB scripts
|
Fri Mar 5 00:09:29 2010, Dmass, Lab Infrastructure, General, Camera Maintanence
|
Wed Mar 3 17:58:29 2010, Dmass, Electronics, Doubling, GreenPD Noise 
|
Thu Mar 4 01:26:50 2010, rana, Electronics, Doubling, GreenPD Noise
|
Thu Mar 4 23:07:50 2010, Dmass, Electronics, Doubling, GreenPD Noise
|
Thu Mar 4 23:03:14 2010, Dmass, Laser, Doubling, MZ Complete!
|
Wed Mar 3 15:49:09 2010, Frank, Computing, DAQ, hard disk replaced
|
Wed Mar 3 00:22:05 2010, Dmass, Electronics, General, OP AMP WOES
|
Wed Mar 3 08:39:41 2010, rana, Electronics, General, OP AMP WOES
|
Tue Mar 2 20:09:16 2010, Zach, Laser, GYRO, cavity "locked" in both directions
|
Tue Mar 2 21:03:36 2010, Koji, Laser, GYRO, cavity "locked" in both directions
|
Tue Mar 2 12:41:23 2010, Dmass, Electronics, Doubling, Op Amps  
|
Mon Mar 1 19:41:25 2010, Zach, Laser, GYRO, AOM double-pass
|
Wed Feb 24 00:27:14 2010, Dmass, Lab Infrastructure, Doubling, Doubling Crystal Damaged
|
Thu Feb 25 01:00:31 2010, Dmass, Lab Infrastructure, Doubling, Doubling Experiment Update!
|
Fri Feb 26 01:50:06 2010, Dmass, Lab Infrastructure, Doubling, Doubling Experiment Update!
|
Fri Feb 26 16:19:05 2010, Dmass, Lab Infrastructure, Doubling, Doubling Experiment Update!   
|
Wed Feb 24 04:35:04 2010, Dmass, Laser, Doubling, New Mach Zehnder Layout!
|
Mon Feb 22 15:44:47 2010, Frank, Computing, DAQ, day(s) for data rescue?
|
Thu Feb 18 18:14:20 2010, Zach, Laser, GYRO, update (AOM)
|
Fri Feb 19 10:22:26 2010, Alastair, Laser, GYRO, update (AOM)
|
Mon Feb 22 13:24:04 2010, Alastair, Laser, GYRO, update (AOM)
|
Mon Feb 22 13:14:26 2010, Frank, Computing, DAQ, fb0 replacement disks arrived
|
Thu Feb 18 18:49:21 2010, Dmass, Electronics, Doubling, Bad PD?!
|
Thu Feb 18 21:16:01 2010, Dmass, Electronics, Doubling, Bad PD?!
|
Fri Feb 19 01:04:35 2010, Dmass, Electronics, Doubling, Bad PD?!
|
Fri Feb 19 07:54:14 2010, rana, Electronics, Doubling, Bad PD?!
|
Thu Feb 18 18:04:07 2010, Mott, Laser, Fiber, Mode Shape of the fiber laser
|
Thu Feb 18 20:09:32 2010, Mott, Laser, Fiber, Mode Shape of the fiber laser
|
Thu Feb 18 00:45:53 2010, Dmass, Laser, Doubling, AA Noise, and slow channels added...
|
Thu Feb 18 04:29:02 2010, Dmass, Laser, Doubling, AA Noise, and slow channels added...   
|
Thu Feb 11 19:07:09 2010, Dmass, Laser, Doubling, Intensity Noise Measurement, and Coherence
|
Wed Feb 17 17:46:56 2010, Dmass, Laser, Doubling, Intensity Noise Measurement, and Coherence
|
Wed Feb 17 03:40:10 2010, Dmass, Computing, Doubling, MATLAB MZ SUBTRACTION CODE
|
Sat Feb 13 13:29:22 2010, Koji, Computing, Doubling, MATLAB MZ SUBTRACTION CODE
|
Sun Feb 14 04:31:09 2010, Dmass, Computing, Doubling, MATLAB MZ SUBTRACTION CODE
|
Tue Feb 16 19:28:25 2010, Frank, Computing, General, fb0 is now working again
|
Wed Feb 17 01:27:24 2010, Frank, Computing, General, fb0 is now working again
|
Tue Feb 16 16:54:58 2010, Alastair, Laser, GYRO, Curved mirror for AOM
|
Tue Feb 16 13:21:08 2010, Alastair, Laser, GYRO, Beam scan for AOM double pass  
|
Tue Feb 16 11:39:38 2010, Frank, Computing, General, fb0 error
|
Tue Feb 16 03:32:58 2010, dmass, Computing, Doubling, Matlab MZ Subtraction Code Update
|
Thu Feb 11 16:40:27 2010, Alastair, Laser, GYRO, More stuff for gyro
|
Thu Feb 11 15:19:44 2010, Mott, Laser, Fiber, Fiber Mach-Zehnder
|
Tue Feb 9 01:55:37 2010, Dmass, Laser, Doubling, Noise Spectra (Done) 6x
|
Tue Feb 9 16:23:51 2010, Dmass, Laser, Doubling, Noise Spectra (Done) 
|
Wed Feb 10 08:29:38 2010, rana, Laser, Doubling, Noise Spectra (Done)
|
Tue Feb 9 17:58:15 2010, Zach, Laser, GYRO, Gyro cavity locked in other direction 
|
Wed Feb 10 08:27:08 2010, rana, Laser, GYRO, Fisheye
|
Tue Feb 9 23:27:45 2010, Dmass, Lab Infrastructure, Optics, Window Fun
|
Tue Feb 9 17:03:48 2010, Frank, Misc, General, Marconi missing
|
Tue Feb 9 17:28:24 2010, Alberto, Misc, General, Marconi missing
|
Tue Feb 9 17:55:17 2010, Alberto, Misc, General, Marconi missing
|
Mon Feb 8 10:40:52 2010, Zach, Lab Infrastructure, General, Where is stuff
|
Mon Feb 8 11:49:28 2010, rana, Lab Infrastructure, General, Where is stuff
|
Tue Feb 9 01:01:20 2010, dmass, Lab Infrastructure, General, Where is stuff
|
Mon Feb 8 19:54:08 2010, Alastair, Laser, GYRO, locked in one direction
|
Fri Feb 5 17:42:00 2010, Dmass, Laser, Doubling, PD Noise Spectra 6x
|
Sat Feb 6 18:20:18 2010, Dmass, Laser, Doubling, PD Noise Spectra
|
Thu Feb 4 12:00:08 2010, Zach, Laser, GYRO, Cavity finesse and HR mirror transmission measurement
|
Thu Feb 4 10:22:41 2010, Zach, Lab Infrastructure, General, USB floppy drive missing
|
Thu Feb 4 00:59:23 2010, rana, Computing, fubar, ELOG restarted: no more .ps files
|
Wed Feb 3 17:15:12 2010, Dmass, Computing, DAQ, NDS INFO FOR NOT THE 40m
|
Wed Feb 3 03:06:23 2010, Dmass, Computing, DAQ, NDS server down?
|
Tue Feb 2 18:13:26 2010, Zach, Laser, GYRO, Gyro servo signal spectra
|
Tue Feb 2 09:47:28 2010, Zach, Laser, GYRO, gyro update and TF
|
Tue Feb 2 11:00:03 2010, rana, Laser, GYRO, gyro update and TF
|
Tue Feb 2 14:33:41 2010, Zach, Laser, GYRO, gyro update and TF
|
Mon Feb 1 12:10:52 2010, Dmass, Laser, Doubling, Data Time Stamps
|
Sat Jan 30 04:13:53 2010, Dmass, Computing, Doubling, Frequency Domain Subtraction
|
Fri Jan 29 17:53:03 2010, Dmass, Computing, fubar, Mental Computing Broken
|
Tue Jan 26 00:38:21 2010, Dmass, Laser, Doubling, Calibrated Mach Zehnder Spectra etc 11x
|
Tue Jan 26 01:07:06 2010, Dmass, Laser, Doubling, Calibrated Mach Zehnder Spectra etc
|
Tue Jan 26 03:24:58 2010, rana, Laser, Doubling, Calibrated Mach Zehnder Spectra etc
|
Tue Jan 26 18:44:31 2010, Dmass, Laser, Doubling, Calibrated Mach Zehnder Spectra etc
|
Thu Jan 28 22:57:22 2010, Dmass, Laser, Doubling, Calibrated Mach Zehnder Spectra etc 
|
Fri Jan 29 01:32:05 2010, rana, Laser, Doubling, Calibrated Mach Zehnder Spectra etc 
|
Thu Jan 28 18:56:00 2010, Zach, Laser, GYRO, Gyro cavity LOCKED 
|
Thu Jan 28 23:29:30 2010, rana, Laser, GYRO, Gyro cavity LOCKED
|
Thu Jan 28 21:08:27 2010, Dmass, Computing, DAQ, PD Trend Confusion...
|
Thu Jan 28 09:18:24 2010, Alastair, Laser, GYRO, Beam scan of Gyro Npro
|
Thu Jan 28 16:52:21 2010, Koji, Laser, GYRO, Beam scan of Gyro Npro
|
Wed Jan 27 21:12:03 2010, Alastair, Laser, GYRO, Cavity alignment
|
Tue Jan 26 16:55:50 2010, Zach, Laser, GYRO, new short-term setup
|
Tue Jan 26 15:57:01 2010, Aidan, Laser, Fiber, FS - phase noise measurements
|
Tue Jan 26 13:52:44 2010, Aidan, Laser, Fiber, Fiber setup - voltages and power levels throughout the experiment
|
Tue Jan 26 11:00:45 2010, Aidan, Laser, Fiber, Fiber stabilization loop transfer function measurements & calculation 
|
Tue Jan 26 10:01:03 2010, Zach, Laser, GYRO, alignment/locking
|
Tue Jan 26 00:18:38 2010, Dmass, Laser, Doubling, Decimate Confusion
|
Mon Jan 25 11:35:15 2010, Aidan, Laser, Fiber, Fiber layout - before dismantling 
|
Fri Jan 22 11:59:57 2010, Aidan, Laser, Fiber, Whitening filter in Pomona box data from SR785 
|
Fri Jan 22 15:10:35 2010, Aidan, Laser, Fiber, Whitening filter in Pomona box data from SR785
|
Thu Jan 21 23:02:36 2010, Aidan, Laser, Fiber, Characterizing fiber stabilization measurement - sidebands and mode-matching
|
Fri Jan 22 15:08:50 2010, Aidan, Laser, Fiber, Characterizing fiber stabilization measurement - sidebands and mode-matching
|
Fri Jan 22 11:09:45 2010, Aidan, Laser, Fiber, Whitening filter and RF spectra data
|
Thu Jan 21 19:03:24 2010, Dmass, Laser, Doubling, Spectra for MZ   
|
Tue Jan 19 09:18:47 2010, Aidan, Laser, Fiber, Double passed stabilization - mark II
|
Tue Jan 19 18:16:53 2010, Aidan, Laser, Fiber, Double passed stabilization - mark II - hmmm
|
Tue Jan 19 09:17:09 2010, Aidan, Computing, DAQ, New fiber channels in frame
|
Mon Jan 18 17:53:13 2010, Aidan, Computing, DAQ, Front end restarted - "burtrestore = 1" was the trick
|
Thu Jan 14 12:16:35 2010, Alastair, Misc, Purchases, Parts for the Gyro
|
Sun Jan 17 05:26:46 2010, rana, Misc, Purchases, Parts for the Gyro
|
Sat Jan 16 23:16:45 2010, Aidan, Computing, DAQ, Restarted front end ... and then it broke
|
Fri Jan 15 16:46:14 2010, Frank, Computing, General, monitor utility
|
Thu Jan 14 18:08:50 2010, Dmass, Laser, Doubling, Note to Self
|
Thu Jan 14 02:01:43 2010, Dmass, Computing, DAQ, Optimal Filters
|
Thu Jan 14 14:52:44 2010, Dmass, Computing, DAQ, Optimal Filters
|
Thu Jan 14 01:53:11 2010, Dmass, Computing, DAQ, DAQ Changes
|
Tue Jan 12 02:33:15 2010, Dmass, Laser, Doubling, Craziness!
|
Tue Jan 12 00:47:42 2010, Dmass, Laser, PSL, Calibration Lines added
|
Mon Jan 11 21:17:34 2010, Zach, Laser, GYRO, oldskool plot 2.0
|
Mon Jan 11 20:18:46 2010, Zach, Laser, GYRO, oldskool plot 
|
Mon Jan 11 15:05:29 2010, Zach, Laser, GYRO, SB frequency (with FSR = 95 MHz)
|
Sun Jan 10 20:01:41 2010, Dmass, Computing, DAQ, Problems with transfer functions
|
Thu Jan 7 17:27:04 2010, Zach, Lab Infrastructure, fubar, tip of the iceberg
|
Thu Jan 7 11:04:16 2010, Zach, Laser, GYRO, Modulator impedance spectra  
|
Tue Dec 29 05:33:25 2009, rana, Things to Buy, GYRO, What Mounts to Use for the Gyro? 
|
Tue Dec 29 18:27:41 2009, Frank, Things to Buy, GYRO, What Mounts to Use for the Gyro?
|
Mon Jan 4 16:05:12 2010, Alastair, Things to Buy, GYRO, What Mounts to Use for the Gyro?
|
Mon Dec 28 23:26:55 2009, Frank, Misc, General, how projects function
|
Mon Dec 28 16:20:34 2009, Frank, Computing, DAQ, booting VME crates from fb1
|
Mon Dec 21 20:43:15 2009, Zach, Laser, GYRO, SB frequency 
|
Tue Dec 22 00:14:23 2009, Koji, Laser, GYRO, SB frequency
|
Wed Dec 23 12:07:52 2009, rana, Laser, GYRO, SB frequency
|
Wed Dec 23 19:46:25 2009, Zach, Laser, GYRO, SB frequency
|
Sun Dec 27 23:47:34 2009, rana?, Laser, GYRO, SB frequency
|
Mon Dec 28 08:21:55 2009, Zach, Laser, GYRO, SB frequency
|
Fri Dec 18 19:11:17 2009, rana, Things to Buy, GYRO, Test of the G&H HR mirrors from MIT
|
Fri Dec 18 22:38:25 2009, Koji, Things to Buy, GYRO, Test of the G&H HR mirrors from MIT
|
Fri Dec 18 01:00:00 2009, Dmass, Laser, Doubling, Confusion Abounds 
|
Fri Dec 18 06:57:30 2009, rana, Laser, Doubling, Confusion Abounds ^2
|
Fri Dec 18 13:27:12 2009, Dmass, Laser, Doubling, Confusion Abounds ^3
|
Fri Dec 18 15:42:22 2009, Dmass, Laser, Doubling, Confusion Abounds ^3
|
Thu Dec 17 23:49:38 2009, Dmass, Computing, DAQ, Rebuilt ATF.mdl, added channel
|
Sat Dec 12 18:02:47 2009, Dmass, Computing, DAQ, framebuilding funniness
|
Thu Dec 17 19:52:22 2009, Aidan, Computing, DAQ, framebuilding funniness - "hold please"
|
Thu Dec 17 20:40:35 2009, Aidan, Computing, DAQ, Restarting DAQ - something else to avoid
|
Sat Dec 12 17:42:23 2009, Dmass, Laser, Doubling, Mach Zehnder BOXED Spectrum 
|
Sat Dec 12 22:54:03 2009, Dmass, Laser, Doubling, Mach Zehnder BOXED Spectrum  
|
Mon Dec 14 18:58:41 2009, Dmass, Laser, Doubling, Mach Zehnder BOXED Spectrum
|
Tue Dec 15 02:35:35 2009, Dmass, Laser, Doubling, Mach Zehnder BOXED Spectrum   
|
Tue Dec 15 06:25:32 2009, rana, Laser, Doubling, fitting and combining the streams
|
Tue Dec 15 18:37:55 2009, Dmass, Laser, Doubling, fitting and combining the streams
|
Wed Dec 16 22:45:03 2009, Dmass, Laser, Doubling, fitting and combining the streams
|
Wed Dec 16 15:04:20 2009, Zach, Lab Infrastructure, GYRO, Turf Wars 
|
Wed Dec 16 16:43:25 2009, rana, Lab Infrastructure, GYRO, Turf Wars
|
Wed Dec 16 16:56:19 2009, Zach, Lab Infrastructure, GYRO, Turf Wars
|
Mon Dec 14 11:46:04 2009, Zach, Laser, GYRO, Carrier HOM resonance comparison
|
Tue Dec 15 03:07:24 2009, rana, Laser, GYRO, Carrier HOM resonance comparison
|
Tue Dec 15 11:08:30 2009, Zach, Laser, GYRO, Carrier HOM resonance comparison
|
Tue Dec 15 02:43:25 2009, rana, Electronics, GYRO, Noise of the 80 MHz RFPD for the transmitted port
|
Mon Dec 14 10:54:35 2009, Frank, Laser, PSL, medm screens available
|
Sat Dec 12 23:38:47 2009, Dmass, Laser, Doubling, Pictures! Box and Setup  
|
Fri Dec 11 19:33:54 2009, Frank, Computing, DAQ, Beckhoff (Laser) channel to EPICS channel translation moved to 10.0.1.12
|
Fri Dec 11 19:13:59 2009, Zach, Laser, GYRO, Carrier HOM resonances in gyro
|
Wed Dec 9 16:39:34 2009, Dmass, Laser, Doubling, Contrast Data...
|
Wed Dec 9 16:25:19 2009, Dmass, Laser, Doubling, PD Reflections
|
Wed Dec 9 11:53:42 2009, Frank, Laser, stuff happens, laser data unavailable since 1 week
|
Wed Dec 9 00:45:31 2009, Dmass, Laser, Doubling, Realigned the MZ
|
Tue Dec 8 15:33:49 2009, Frank, Lab Infrastructure, General, ATF particle counts
|
Mon Dec 7 14:01:18 2009, Aidan, Computing, fubar, Front-end is down ...
|
Mon Dec 7 17:18:40 2009, Aidan, Computing, DAQ, Front-end is back up (Alex's comments)
|
Mon Dec 7 17:15:56 2009, Dmass, Laser, Doubling, Crystal OK?
|
Fri Dec 4 16:15:12 2009, Dmass, Lab Infrastructure, General, Isopropyl
|
Tue Dec 1 19:41:45 2009, Dmass, Laser, Doubling, Doubling Crystal 
|
Thu Dec 3 00:00:31 2009, Dmass, Laser, Doubling, Doubling Crystal
|
Thu Dec 3 15:20:31 2009, Dmass, Laser, Doubling, Doubling Crystal
|
Wed Dec 2 14:04:50 2009, Zach, Laser, GYRO, Gyro diagram
|
Tue Dec 1 01:59:22 2009, Zach, Laser, GYRO, Gyro noise budget 
|
Sat Nov 21 16:03:58 2009, Frank, Computing, DAQ, FE error messages
|
Sat Nov 21 17:52:27 2009, Koji, Computing, DAQ, FE error messages
|
Mon Nov 23 17:01:01 2009, Frank, Computing, DAQ, FE error messages
|
Mon Nov 23 15:50:07 2009, Mott, Computing, General, slight change to network topology
|
Mon Nov 23 14:28:51 2009, Mott, Computing, General, slight change to network topology
|
Wed Nov 18 21:08:41 2009, Aidan, Mott, Laser, Fiber, Out of loop measurement of stabilized fiber phase noise
|
Thu Nov 19 10:20:52 2009, rana, Laser, Fiber, Out of loop measurement of stabilized fiber phase noise
|
Fri Nov 20 10:59:29 2009, Aidan, Laser, Fiber, Out of loop measurement of stabilized fiber phase noise
|
Thu Nov 19 21:36:19 2009, Dmass, Laser, Doubling, Doubling Noise List
|
Thu Nov 19 16:06:09 2009, Alberto, Computing, General, Elog debugging output - Down time programmed today to make changes
|
Thu Nov 19 18:50:22 2009, Alberto, Computing, General, Elog debugging output - Down time programmed today to make changes
|
Mon Nov 9 16:57:30 2009, Dmass, Laser, Doubling, Doubling Noise Experiment 
|
Wed Nov 11 15:51:30 2009, Dmass, Laser, Doubling, Doubling Noise Experiment
|
Tue Nov 17 15:00:27 2009, Dmass, Laser, Doubling, Doubling Noise Experiment
|
Tue Nov 17 21:48:26 2009, Dmass, Laser, Doubling, Doubling Noise Experiment  
|
Tue Nov 17 22:34:39 2009, Koji, Laser, Doubling, Doubling Noise Experiment
|
Tue Nov 17 18:46:36 2009, Aidan, Laser, Fiber, Heterodyne beat on far side of fiber
|
Tue Nov 17 12:17:33 2009, Aidan, Laser, Fiber, Beam propagation after partial reflector on far side of fiber
|
Tue Nov 17 16:27:17 2009, Aidan, Laser, Fiber, Added cylindrical lenses to fiber transmission
|
Mon Nov 16 11:33:16 2009, Aidan, Computing, DAQ, Unable to restart framebuilder ...
|
Mon Nov 16 11:50:27 2009, Aidan, Computing, DAQ, Unable to restart framebuilder ...
|
Tue Nov 17 12:13:23 2009, Frank, Computing, DAQ, Unable to restart framebuilder ...
|
Wed Nov 11 18:20:29 2009, Dmass, Laser, Doubling, Data
|
Thu Nov 12 08:54:51 2009, Dmass, Laser, Doubling, Data
|
Fri Nov 13 16:38:25 2009, Dmass, Laser, Doubling, Data
|
Fri Nov 13 17:21:06 2009, Dmass, Laser, Doubling, Data
|
Sun Nov 15 14:21:41 2009, rana, Laser, Doubling, Data
|
Fri Nov 13 20:23:28 2009, Aidan, Mott, Laser, Fiber, Double-passed fiber beam and the 20MHz beat
|
Sat Nov 14 18:23:05 2009, rana, Laser, Fiber, Double-passed fiber beam and the 20MHz beat
|
Sun Nov 15 13:50:48 2009, Aidan, Laser, Fiber, Frequency Counter: BK Precision 1856D
|
Fri Nov 13 12:54:57 2009, Aidan, Computing, DAQ, Naming conventions ...
|
Fri Nov 13 15:11:40 2009, Jenne, Computing, DAQ, Naming conventions ...
|
Fri Nov 13 14:37:11 2009, Mott, Electronics, Fiber, Isomet and Marconi Phase noise Datasets 
|
Thu Nov 12 14:40:34 2009, Dmass, Computing, DAQ, 16 Hz comb in test points
|
Fri Nov 6 19:46:57 2009, Aidan, Laser, Fiber, VCO phase noise requirements for Fiber Stabilization 
|
Sun Nov 8 13:14:43 2009, Aidan, Laser, Fiber, Correction: VCO phase noise requirements for Fiber Stabilization 
|
Sun Nov 8 14:23:46 2009, Aidan, Laser, Fiber, VCO as LO phase noise requirements for FS 
|
Mon Nov 9 10:36:04 2009, Aidan, Laser, Fiber, VCO as LO phase noise requirements for FS   
|
Sun Nov 8 14:10:06 2009, Frank, Lab Infrastructure, General, ATF particle counter - first data available
|
Sat Nov 7 04:09:32 2009, Mott, Electronics, Fiber, NEOS Phase noise
|
Wed Nov 4 18:45:33 2009, Frank, Laser, RefCav, reference cavity replaced and locked    
|
Wed Nov 4 18:36:44 2009, Frank, Lab Infrastructure, General, some AC leaks sealed
|
Wed Nov 4 17:49:17 2009, Mott, Electronics, Fiber, Plant Phase Noise Measurements for Fiber Stabilization 
|
Tue Nov 3 11:44:05 2009, Zach, Laser, GYRO, revised sensitivity calculation
|
Tue Nov 3 22:21:40 2009, rana, Laser, GYRO, revised sensitivity calculation
|
Mon Nov 2 22:55:07 2009, Frank, Lab Infrastructure, General, custom made 35ft cables arrived
|
Fri Oct 30 21:26:10 2009, Frank, Computing, General, updated network schematic
|
Fri Oct 30 21:08:49 2009, Frank, Computing, DAQ, disk space for frames
|
Fri Oct 30 19:41:31 2009, Frank, Laser, RefCav, reference cavity moved to ATF 8x
|
Fri Oct 30 13:02:53 2009, Frank, Computing, DAQ, FE hard drives replaced
|
Fri Oct 30 12:25:06 2009, Frank, Lab Infrastructure, DAQ, new PEM channels
|
Fri Oct 23 17:00:08 2009, Frank, Lab Infrastructure, General, environmental monitoring data now available
|
Sat Oct 24 05:04:13 2009, Frank, Lab Infrastructure, General, environmental monitoring data now available
|
Mon Oct 26 17:23:43 2009, Frank, Lab Infrastructure, General, environmental monitoring data now available
|
Wed Oct 28 08:00:20 2009, rana, Lab Infrastructure, General, environmental monitoring data now available
|
Fri Oct 23 16:48:32 2009, Frank, Computing, DAQ, fb1 now online
|
Fri Oct 23 12:35:18 2009, Frank, Computing, DAQ, fb1 not working
|
Tue Oct 20 19:37:57 2009, Mott, Electronics, Fiber, Marconi Phase Noise  
|
Wed Oct 21 01:19:49 2009, Koji, Electronics, Fiber, Marconi Phase Noise
|
Wed Oct 21 16:10:57 2009, Mott, Electronics, Fiber, Marconi Phase Noise
|
Wed Oct 21 20:45:12 2009, Koji, Electronics, Fiber, Marconi Phase Noise
|
Thu Oct 22 14:59:43 2009, Mott, Electronics, Fiber, Marconi Phase Noise
|
Thu Oct 22 22:10:58 2009, Koji, Electronics, Fiber, Marconi Phase Noise
|
Thu Oct 22 17:11:41 2009, Frank, Lab Infrastructure, General, pictures of leaks 10x
|
Thu Oct 22 13:54:04 2009, Frank, Computing, DAQ, Newport opc license
|
Wed Oct 21 18:35:54 2009, Frank, Lab Infrastructure, General, Environmental monitoring - first data
|
Wed Oct 21 16:07:25 2009, Frank, Lab Infrastructure, General, new particle counter
|
Tue Oct 20 20:06:04 2009, Frank, Computing, General, fileserver, home directories and new framebuilder
|
Tue Oct 20 18:21:41 2009, Frank, Lab Infrastructure, General, dirty air
|
Tue Oct 20 18:14:06 2009, Frank, Misc, FSS, old refcav at 40m
|
Mon Oct 19 17:32:54 2009, Zach, Misc, GYRO, shot-noise-limited sensitivity
|
Sun Oct 18 19:17:20 2009, Frank, Computing, General, new network addresses
|
Fri Oct 16 20:51:06 2009, Frank, Laser, General, 35W laser & DAQ up and running
|
Fri Oct 16 19:48:32 2009, Frank, Computing, General, network changed and up again
|
Fri Oct 16 17:01:50 2009, Frank, Computing, General, network address changes done NOW
|
Fri Oct 16 14:28:51 2009, Zach, Laser, GYRO, Diagram
|
Thu Oct 15 20:48:02 2009, Frank, Computing, DAQ, network up again
|
Thu Oct 15 17:16:56 2009, Frank, Computing, DAQ, DAQ and network down the next couple of hours
|
Wed Aug 19 15:11:42 2009, Frank, Computing, DAQ, laser data now online
|
Wed Oct 14 23:49:03 2009, rana, Computing, DAQ, laser data now online 
|
Thu Oct 15 10:57:18 2009, Frank, Computing, DAQ, laser data now online
|
Thu Oct 15 10:34:22 2009, Frank, Computing, General, network changes 
|
Wed Oct 14 20:28:07 2009, Frank, Computing, DAQ, fileserver and network in the lab
|
Wed Oct 14 20:18:52 2009, Frank, Lab Infrastructure, General, BNC cables and patch panels
|
Tue Oct 13 18:39:36 2009, Frank, Computing, General, firefox and java plugin
|
Tue Oct 13 18:15:49 2009, Frank, Misc, General, optomechanics now in stock
|
Wed Oct 7 21:54:47 2009, Frank, Computing, General, new, static IP address
|
Sun Oct 11 04:22:20 2009, rana, Computing, General, new, static IP address
|
Mon Oct 12 22:38:06 2009, rana, Computing, General, new, static IP address
|
Mon Oct 12 17:09:27 2009, Frank, Lab Infrastructure, General, environmental monitoring
|
Sat Oct 10 00:44:36 2009, Aidan, Laser, Fiber, MZ phase/frequency noise
|
Fri Oct 9 20:33:21 2009, Frank, Misc, Purchases, optomechanics / small monitors / long BNC cables
|
Fri Oct 9 20:20:03 2009, Frank, Computing, General, matlab R2009b on WS2
|
Fri Oct 9 20:05:12 2009, Frank, Computing, General, new monitors @ WS2
|
Wed Oct 7 15:55:03 2009, Alex M, Laser, Fiber, FS layout
|
Wed Oct 7 22:04:49 2009, Aidan, Laser, Fiber, FS layout
|
Wed Oct 7 22:00:43 2009, Aidan, Laser, Fiber, Beam profile of double-passed transmission from fiber.
|
Wed Oct 7 02:47:41 2009, Aidan, Misc, stuff happens, Digital camera is in my office
|
Wed Oct 7 00:51:35 2009, Aidan, Laser, Fiber, AOM installed and running on far side of fiber
|
Wed Oct 7 01:14:26 2009, Aidan, Laser, Fiber, AOM installed and running on far side of fiber
|
Wed Oct 7 00:05:17 2009, Aidan, Misc, Fiber, Intraaction 70 MHz AOM - photos    
|
Tue Oct 6 23:37:06 2009, Aidan, Lab Infrastructure, General, Enclosure and cable tray installation 
|
Thu Oct 1 11:05:09 2009, Zach, Misc, General, Telemarketers
|
Wed Sep 30 19:15:20 2009, Dmass, Computing, DAQ, DAQ VERY NOT BROKEN
|
Wed Sep 30 11:55:45 2009, Zach, Laser, GYRO, PZT transfer function 
|
Tue Sep 29 02:56:13 2009, Dmass, Computing, DAQ, DAQ VERY BROKEN
|
Tue Sep 29 18:02:20 2009, Dmass, Computing, DAQ, DAQ VERY BROKEN
|
Tue Sep 29 00:29:08 2009, Dmass, Laser, PMC, PMC Loop Model  
|
Mon Sep 28 20:40:53 2009, Aidan, Misc, stuff happens, Please do not leave the permanent marker by the whiteboard ...
|
Mon Sep 28 16:53:07 2009, Zach, Misc, General, AOMs 
|
Mon Sep 28 17:17:08 2009, Koji, Misc, General, AOMs
|
Mon Sep 28 17:56:42 2009, Zach, Misc, General, AOMs
|
Sun Sep 27 21:37:41 2009, Dmass, Computing, DAQ, Hack @ DAQ
|
Mon Sep 28 17:43:47 2009, rob, Computing, DAQ, Hack @ DAQ
|
Sun Sep 27 18:48:33 2009, Dmass, Lab Infrastructure, General, New Noise Source!
|
Fri Sep 25 21:30:14 2009, Frank, Laser, MOPA, laser power back to 30+W
|
Wed Sep 23 21:19:23 2009, Frank, Computing, General, new network address space
|
Wed Sep 23 21:09:10 2009, Frank, Laser, PMC, new output coupler for 35W laser PMC path
|
Wed Sep 23 19:29:38 2009, Aidan, Electronics, Fiber, VCO and mixer transfer function - saturated.  
|
Wed Sep 23 12:43:47 2009, Frank, Lab Infrastructure, General, new beam analyzer
|
Tue Sep 22 14:45:51 2009, Aidan, Electronics, Fiber, DAQ transfer function - phase delay bit me as well  
|
Mon Sep 21 23:10:40 2009, Frank, Computing, DAQ, network working again
|
Fri Sep 18 20:49:04 2009, Frank, Lab Infrastructure, General, new optical filters (ND and longpass)
|
Fri Sep 18 20:44:07 2009, Frank, Laser, PMC, PMC now re-aligned
|
Fri Sep 18 20:39:57 2009, Frank, Laser, Pulser, setup with pockel cell doesn't work
|
Fri Sep 18 11:30:44 2009, Zach, Laser, GYRO, Open-loop transfer function  
|
Fri Sep 18 13:42:24 2009, Koji, Laser, GYRO, Open-loop transfer function
|
Fri Sep 18 14:13:51 2009, Zach, Laser, GYRO, Open-loop transfer function 
|
Fri Sep 18 15:04:22 2009, Koji, Laser, GYRO, Open-loop transfer function
|
Fri Sep 18 15:31:32 2009, Zach, Laser, GYRO, Open-loop transfer function
|
Fri Sep 18 16:36:54 2009, Koji, Laser, GYRO, Open-loop transfer function
|
Thu Sep 17 16:14:36 2009, Aidan, Laser, Fiber, Yesterday's spectra with shot noise included
|
Thu Sep 17 18:35:09 2009, rana, Laser, Fiber, Yesterday's spectra with shot noise included
|
Fri Sep 18 16:07:15 2009, Aidan, Laser, Fiber, (nearly) Calibrated noise spectra through DAQ 
|
Thu Sep 17 15:43:20 2009, Zach, Laser, GYRO, Friends of the electron: help, please
|
Thu Sep 17 22:56:20 2009, Koji, Laser, GYRO, Friends of the electron: help, please
|
Fri Sep 18 09:40:27 2009, Zach, Laser, GYRO, Friends of the electron: help, please
|
Thu Sep 17 21:14:20 2009, Frank, Laser, Pulser, first tests
|
Thu Sep 17 18:22:05 2009, Aidan, Computing, Fiber, Loop closed with DAQ. Script running overnight
|
Thu Sep 17 08:22:16 2009, Aidan, Laser, General, Chiller warning - DI cartridge needs changing
|
Thu Sep 17 14:46:29 2009, not Aidan, Laser, General, Chiller warning - DI cartridge needs changing
|
Thu Sep 17 09:53:06 2009, Aidan, Lab Infrastructure, Purchases, Lighting for bench
|
Thu Sep 17 09:48:19 2009, Aidan, Laser, Fiber, Closed loop with DAQ. Success.
|
Wed Sep 16 17:15:59 2009, Aidan, Computing, Fiber, Whitening filter and noise spectra
|
Wed Sep 16 12:24:38 2009, Frank, Computing, DAQ, new workstation
|
Wed Sep 16 12:20:51 2009, Frank, Lab Infrastructure, General, cleaning the lab
|
Wed Sep 16 12:13:00 2009, Frank, Computing, DAQ, new FB disk space comming soon
|
Wed Sep 16 12:09:21 2009, Frank, Laser, General, 35W laser - laser update
|
Tue Sep 15 16:28:31 2009, Zach, Laser, GYRO, Drumroll please...
|
Tue Sep 15 23:14:19 2009, Koji, Laser, GYRO, Drumroll please... 
|
Tue Sep 15 23:37:33 2009, rana, Laser, GYRO, Drumroll please...
|
Wed Sep 16 09:58:46 2009, Zach, Laser, GYRO, Drumroll please...
|
Wed Sep 16 09:49:51 2009, Aidan, Electronics, Fiber, Open and closed loop fiber noise with wnd without whitening filter 
|
Tue Sep 15 13:30:02 2009, Aidan, Electronics, Fiber, Whitening Filter transfer function   
|
Wed Sep 16 06:52:57 2009, Aidan, Electronics, Fiber, Whitening Filter transfer function
|
Tue Sep 15 16:45:04 2009, Aidan, Electronics, Fiber, Effect of whitening filter on fiber stabilization out of loop PD
|
Mon Sep 14 17:31:31 2009, Zach, Laser, GYRO, DAQ it up
|
Wed Sep 9 14:08:51 2009, Alastair, Lab Infrastructure, General, Lens kit is lookin' good 
|
Tue Sep 8 13:40:22 2009, Alastair, Electronics, GYRO, New filter transfer function 
|
Tue Sep 8 09:36:07 2009, Alastair, Electronics, GYRO, Slow feedback filter version 1
|
Fri Sep 4 20:57:02 2009, Alastair, Laser, GYRO, Feedback
|
Fri Sep 4 15:49:11 2009, Frank, Laser, General, 35W laser - bad beam profile
|
Fri Sep 4 20:36:55 2009, Dmass, Laser, General, 35W laser - bad beam profile
|
Fri Sep 4 17:49:30 2009, Alastair, Laser, GYRO, Feedback
|
Fri Sep 4 15:35:53 2009, Frank, Laser, DAQ, All laser channels online
|
Fri Sep 4 15:33:12 2009, Frank, Computing, DAQ, DV doesn't work in "realtime"-mode
|
Thu Sep 3 18:06:17 2009, Alastair, Laser, GYRO, Locking & Feedback
|
Mon Aug 31 14:11:16 2009, Dmass, Computing, DAQ, More Disrepair for the DAQ
|
Mon Aug 31 10:17:15 2009, Dmass, Lab Infrastructure, HVAC, Smokey Flavor in Lab
|
Mon Aug 31 00:20:23 2009, Dmass, Things to Buy, Purchases, "Can we have a pool dad?"
|
Sat Aug 29 18:49:06 2009, Zach, Laser, General, Diagram/Pictures  
|
Thu Aug 27 20:00:59 2009, Alastair, Lab Infrastructure, stuff happens, Lenses
|
Thu Aug 27 21:40:20 2009, (not) Alastair, Lab Infrastructure, stuff happens, Lenses
|
Fri Aug 28 10:26:12 2009, Alastair, Lab Infrastructure, stuff happens, Lenses
|
Fri Aug 28 10:52:35 2009, Alastair, Lab Infrastructure, stuff happens, Lenses
|
Fri Aug 28 12:26:14 2009, Dmass, Lab Infrastructure, stuff happens, Lenses
|
Fri Aug 28 12:39:00 2009, Alastair, Lab Infrastructure, stuff happens, Lenses
|
Fri Aug 28 13:04:13 2009, Dmass, Lab Infrastructure, Purchases, Bought some lens mounts
|
Wed Aug 26 01:05:27 2009, Zach, Laser, General, modifications with some success
|
Wed Aug 26 15:06:51 2009, rana, Laser, General, modifications with some success
|
Sun Aug 23 18:21:32 2009, Aidan, Laser, DAQ, Whitening Filter for Fiber signals into DAQ
|
Sun Aug 23 12:41:18 2009, Aidan, Misc, General, Lower lab temperature 3 degrees. Too warm in here.
|
Sun Aug 23 12:37:54 2009, Aidan, Laser, Fiber, Low Freq Acoustic Noise source [50-200Hz] identified
|
Sat Aug 22 21:04:28 2009, Aidan, Laser, Fiber, Closed Loop on Single Pass again - strange saturation at low freq.
|
Fri Aug 21 18:47:42 2009, Zach, Laser, General, some more progress
|
Fri Aug 21 18:44:33 2009, Aidan, Lab Infrastructure, General, Marconi Memory Setting 103 - 80.0001MHz
|
Fri Aug 21 11:10:57 2009, Zach, Alastair, Laser, General, Progress with triangular cavity
|
Wed Aug 12 16:30:01 2009, Dmass, Computing, PMC, PMC Loop Changed 
|
Wed Aug 19 11:27:59 2009, rob, Computing, PMC, PMC Loop Changed
|
Wed Aug 19 09:42:38 2009, Aidan, Computing, DAQ, Overflows: PMC PZT output in the billions of counts ... burtrestore issue?
|
Wed Aug 19 11:20:03 2009, rob, Computing, DAQ, billions
|
Tue Aug 18 17:49:52 2009, Aidan, Laser, Fiber, MZ beam overlap after tweaking alignment: better @ 9% but still low
|
Tue Aug 18 08:50:56 2009, Aidan, Computing, DAQ, Overflows on DAQ channels 
|
Tue Aug 18 14:08:43 2009, DMass, Computing, DAQ, Overflows on DAQ channels
|
Tue Aug 18 02:45:39 2009, Dmass, Electronics, General, Bad Scope?
|
Tue Aug 18 09:15:21 2009, Dmass, Electronics, General, Bad Scope?
|
Tue Aug 18 03:37:57 2009, Dmass, Computing, DAQ, fb0 not ok.
|
Mon Aug 17 23:02:53 2009, Dmass, Laser, PMC, PMC Mode Matching = <click to see>
|
Mon Aug 17 18:17:42 2009, Aidan, Connor, Laser, Fiber, High PD noise due to poor overlap at output of MZ interferometer
|
Thu Aug 13 19:37:59 2009, Dmass, Laser, Doubling, Phase Matching Curve Measured 
|
Thu Aug 13 20:46:37 2009, Koji, Misc, Doubling, Phase Matching Curve Measured
|
Thu Aug 13 03:35:17 2009, Dmass, Laser, PSL, PSL On - Long measurement Running
|
Thu Aug 13 03:31:12 2009, Dmass, Laser, Doubling, Alignment/optimization of PMC and oven
|
Wed Aug 12 19:09:33 2009, Aidan, Connor, Laser, Fiber, Increased 80MHz signal by realigning and increasing power to PDs
|
Wed Aug 12 19:24:37 2009, Aidan, Connor, Laser, Fiber, Increased 80MHz signal by realigning and increasing power to PDs
|
Wed Aug 12 11:19:57 2009, Aidan, Things to Buy, General, New Focus Order pending ...
|
Wed Aug 12 14:12:22 2009, Aidan, Things to Buy, General, New Focus Order pending ...
|
Wed Aug 12 01:02:21 2009, Dmass, Laser, PMC, PMC Locked - loop more stable 
|
Wed Aug 12 02:03:33 2009, Dmass, Laser, PMC, PMC Locked - loop more stable
|
Wed Aug 12 03:27:45 2009, rana, Laser, General, PMC Locked - loop more stable
|
Wed Aug 12 03:42:35 2009, Dmass, Laser, General, PMC Locked - loop more stable
|
Tue Aug 11 22:33:54 2009, Dmass, Laser, PMC, SR560 - Yoink
|
Tue Aug 11 18:59:34 2009, Michelle, Zach, Laser, General, Locked! 
|
Tue Aug 11 18:14:49 2009, Aidan, Misc, General, Hive of activity ...
|
Tue Aug 11 16:38:25 2009, Aidan, Things to Buy, General, Ordered mixers, splitters, LPFs and HPFs
|
Tue Aug 11 15:33:38 2009, Aidan, Electronics, General, Marconi Memory Settings 101 and 102 
|
Mon Aug 10 17:34:43 2009, Michelle, Laser, General, Working Beam Profiler
|
Tue Aug 11 12:52:09 2009, Koji, Laser, General, Working Beam Profiler
|
Tue Aug 11 00:16:29 2009, Dmass, Electronics, EOM, Wenzel Gone (for now)
|
Mon Aug 10 20:33:17 2009, Aidan, Connor, Electronics, General, Power reflected from AOMs when driven off resonance 
|
Wed Jul 22 20:40:13 2009, Aidan, Lab Infrastructure, fubar, Filing cabinet lock engaged ... with no key
|
Mon Aug 10 20:14:11 2009, Aidan, Lab Infrastructure, fubar, Filing cabinet lock engaged ... with no key
|
Mon Aug 10 19:32:54 2009, Aidan, Connor, Laser, Fiber, Calibrated fiber stabilized phase and freq. noise measurement
|
Mon Aug 10 08:43:22 2009, Aidan, Laser, Fiber, DC intensity noise measurement over the weekend
|
Fri Aug 7 17:40:30 2009, Dmass, Laser, PSL, EOM Impedance Matching
|
Sat Aug 8 09:26:09 2009, rana, Laser, PSL, EOM Impedance Matching
|
Mon Aug 10 04:14:02 2009, Dmass, Laser, PSL, EOM Impedance Matching  
|
Fri Aug 7 10:39:20 2009, Michelle, Lab Infrastructure, , Changing Lasers
|
Thu Aug 6 16:35:34 2009, Dmass, Computing, DAQ, DAQ, Hard Drives, and Size
|
Fri Aug 7 02:06:34 2009, rana, Computing, DAQ, DAQ, Hard Drives, and Size
|
Thu Aug 6 10:01:34 2009, Aidan, Connor, Laser, Fiber, Phase matching the RF and LO signals in the fiber stabilization ... wow, that helps.
|
Thu Aug 6 09:55:39 2009, Aidan, Computing, DAQ, And it all comes crashing down again ...
|
Tue Aug 4 15:01:28 2009, Dmass, Computing, DAQ, Transfer Functions and DTT
|
Tue Aug 4 18:41:49 2009, Dmass, Computing, DAQ, Transfer Functions and DTT
|
Tue Aug 4 19:33:47 2009, Koji, Computing, DAQ, Transfer Functions and DTT
|
Tue Aug 4 21:55:00 2009, Dmass, Computing, DAQ, Transfer Functions and DTT
|
Tue Aug 4 23:52:06 2009, Koji, Computing, DAQ, Transfer Functions and DTT
|
Wed Aug 5 16:59:45 2009, Dmass, Computing, DAQ, Transfer Functions and DTT
|
Wed Aug 5 15:14:55 2009, Dmass, Computing, CDS, AWG and TP now up
|
Wed Aug 5 10:10:11 2009, Michelle, Misc, General, Weekly Update (7?)
|
Tue Aug 4 15:46:46 2009, Dmass, Lab Infrastructure, HVAC, Temperature update
|
Wed Jun 24 15:17:59 2009, Dmass, Computing, CDS, Nokia Wireless Device
|
Tue Aug 4 15:37:17 2009, Dmass, Computing, CDS, Nokia Wireless Device
|
Mon Aug 3 22:53:11 2009, Dmass, Laser, PMC, Photodiodes and Power meters - confusion
|
Mon Aug 3 17:32:52 2009, Dmass, Electronics, PMC, Blood Feud Over 
|
Mon Aug 3 22:41:26 2009, Dmass, Electronics, PMC, Blood Feud Over
|
Mon Aug 3 21:23:46 2009, Aidan, Connor, Laser, Fiber, Success! Fiber noise suppression ... again (but not calibrated)
|
Sun Aug 2 22:48:53 2009, Dmass, Laser, PSL, PMC Locked - 10% Transmission
|
Sun Aug 2 17:01:45 2009, Dmass, Laser, PSL, PMC Locking woes
|
Sun Aug 2 22:43:44 2009, Dmass, Laser, PSL, PMC Locking woes
|
Sun Aug 2 22:41:23 2009, Dmass, Electronics, General, Photodiode Woes
|
Fri Jul 31 01:12:41 2009, Dmass, Laser, PSL, ReReReLocking the PMC aaaaaand stuck.
|
Fri Jul 31 14:38:51 2009, Dmass, Laser, PSL, ReReReLocking the PMC aaaaaand stuck.
|
Fri Jul 31 14:58:14 2009, Koji, Laser, PSL, ReReReLocking the PMC aaaaaand stuck.
|
Fri Jul 31 12:27:19 2009, Aidan, Connor, Laser, Fiber, Adjusting angle of fiber-input-HWP to minimize fluctuations in the output
|
Thu Jul 30 21:39:49 2009, Aidan, Connor, Laser, Fiber, FIber Input HWP set to 356.4 degrees.  ![]() | |