  190   Wed Jul 22 11:09:45 2009 MichelleMisc Weekly Update 5Over the course of the past week I've done
a few things. When I began alignment I discovered
that our laser was periodically shutting
  
  197   Thu Jul 23 16:31:28 2009 MichelleLaser I've done some things in lab.Update:
Today I aligned the laser beam through
the EOM with something resembling a normal
  
  200   Fri Jul 24 19:00:37 2009 ranaLaser I've done some things in lab.Make sure to use only ~5 mW to do all of the
alignment.
  
  236   Fri Aug 7 10:39:20 2009 MichelleLab Infrastructure Changing LasersWe have to tweak the alignment of our PDH
setup a bit, as well as change the cavity
and profile the beam at different locations.
  
  1889   Wed Dec 3 18:31:15 2014 KateLab Infrastructure First tilt-free seismometer entryStephanie Moon, Kate Dooley
We've started getting the lab in
order and some parts assembled for putting
 SuspensionFrameOrder.pdf 
  1891   Tue Dec 16 21:36:07 2014 KateLaser Fiber coupler workWe started working on getting some stable
light from the CTN experiment fiber-coupled
into the ATF lab. It's not set up and working
  
  2050   Wed Jun 22 13:42:38 2016 awadeMisc New silicon sample (8616P Tang) arrived: initial unbox and checkThe new Si sample (8616P Tang) has
arrived from Stanford. We will do scatter
measurements at 1550 nm (and maybe 2 um). Its
 12x 
  2184   Fri Nov 10 20:23:48 2017 awadeComputing Reset top level routerI had to reset the top level 10.0.1.1 router
as something had hung. 

None of the computers in ATF/PSL
  
  2186   Sun Dec 10 15:12:22 2017 awadeComputing Reset top level routerCouldn't see the outside internet this
afternoon.  Restarted 10.0.1.1 router
again.
  
  2198   Sat May 5 06:08:35 2018 EricUpdate LabJack U3 New SetupChanged the setup for LabJack testing so
that we can better isolate problems with
the DAC and ADC (if they exist). The previous
 Figure1.JPGFigure2.JPG 
  2202   Tue Jun 5 13:59:43 2018 EricSummary LabJack SummaryWe used the setup specified in the previous
eLog post. The design inputs
a digital signal which is stored as a control
 9x 
  2219   Sun Jul 22 20:12:23 2018 awadeDailyProgress Progress 7/22/18Noise plot

I might be a good
idea to plot your noise prediction on
top of your data for comparison.  Also,
  
  2222   Fri Jul 27 12:26:58 2018 John MartynDailyProgress Progress 7/25/18I don't think this 50 Ohm resistor
is a good idea. For the noise, you should
plot the LISO noise and data in units of
  
  2246   Wed Aug 22 14:13:18 2018 RahulLab Infrastructure Cryo-vacuum chamber layoutAttached file shows the layout of the new
cryo-vacuum chamber (on optical bench), jib
crane, cryocooler and pumping station in
 cryo_vacuum_schematic.jpg 
  2256   Mon Oct 22 09:46:10 2018 RahulLab Infrastructure Cryo vacuum chamber setupThe optical bench at the QIL has been re-arranged
to accommodate the new cryo vacuum chamber.
Today the vacuum chamber (collar fabricated
 lab.jpegGuages_and_controller.jpgCrane.jpgpumping_station.jpg 
  2258   Tue Oct 30 10:17:44 2018 RahulUpdate SHI CryocoolerWe have received the SHI cryocooler CH-104
(figure attached), which has been moved to
the QIL. I have inspected all the components
 cryocooler.jpgcompressor.jpgsupply_hose.jpgCold_test_report_SHI.jpg 
  2259   Fri Nov 2 08:59:26 2018 RahulUpdate Vacuum chamberWe have
our shiny new vacuum chamber (fabricated
 IMG_0005.jpgIMG_0008.jpgIMG_0007.jpg 
  2260   Fri Nov 9 14:57:54 2018 RahulUpdate Cryo-vacuum chamberSHI Cryocooler – Vacuum chamber
assembly

The attached picture shows a schematic
 Picture1.jpg 
  2265   Thu Nov 29 16:52:50 2018 RahulSummary Cryo-vacuum chamberI would like to give a brief update on
the ongoing effort for the assembly of the
cry-vacuum chamber at the QIL. Gabriele has
 bottom_plate_on_spacer.jpgCrane_dovetail.jpg 
  2266   Thu Nov 29 17:00:37 2018 RahulMisc Nor-Cal: leak rate of the chamber (collar)Nor-Cal indicated leak rate of the collar
is 9.8*10^-10 std. cc/ss (Std.cc/sec=
One cubic centimeter of gas flow per second
  
  2301   Fri Mar 8 17:05:52 2019 AnjaliUpdate Frequency stabilization of 2 micron source 

The schematic of the homodyne configuration
is shown below.
 Homodyne_setup_2micron.png 
  2403   Thu Aug 15 15:45:30 2019 DuoLab Infrastructure Floor plan around the big cryostatChris and I went to the lab and made some
plans about how to use the space around the
optics table. Attached a drawing of it. A
 autodraw_8_15_2019.png 
  2405   Sun Aug 18 14:16:59 2019 DuoSummary Measuring the dark current of PDKoji set up an experiment measuring the
dark current of the photodiodes. A bias voltage
is given and the current is converted to
 exp.pdfIMG_2921.png 
  2414   Tue Sep 3 16:47:08 2019 DuoLab Infrastructure QIL lab floor planWe plan to set up the big cryostat in the
QIL lab. We make a plan on how to use the
space in this area.
 qilfloor.pdf 
  2415   Wed Sep 4 22:14:12 2019 ranaLab Infrastructure QIL lab floor planwhat about attaching a crane to the ceiling
on one of the supporting beams?

 
  
  2426   Thu Sep 26 18:05:31 2019 DuoLab Infrastructure Cryo cooler and pump test run[Chris, Duo]
We tested the cryo cooler and the
turbo pump this afternoon. We ran the cryo
 IMG_0990.jpg 
  2433   Thu Oct 17 14:12:10 2019 DuoLab Infrastructure IOGEAR GWU637 failureThe spectrum analyzer SR785 uses a Ethernet-Wifi
converter GWU637 from IOGEAR to connect
to the WIFI in the lab. Today I am trying
  
  Draft   Mon Nov 18 17:17:29 2019 DuoSummary Restart model in QIL labHere are the commands.

ssh
fb4
  
  2551   Mon Apr 5 18:50:54 2021 RadhikaSummary Current PD testing schematicI'm attaching my rough first draft
of the QIL photodiode testing schematic.
Please provide comments for fixes/improvement!
 QIL_PD_testing.jpgQIL_PD_testing.graffle 
  2715   Mon Jan 31 15:40:21 2022 StephenDailyProgress 31 Jan Fastest Radiative Cooling run startedAs discussed during the 21 Jan 2022 meeting,
the next cryostat run will seek the fastest
radiative cooling (again, see QIL/2706)
  
  2716   Fri Feb 4 14:00:19 2022 RadhikaDailyProgress 31 Jan Fastest Radiative Cooling run startedAttached are best fits for cooldown runs
on 01/14 and 01/31. The setup for both cooldowns
can be found in the previous ELOGs. We noticed
 Cooldown_0114_analyzed.pdfCooldown_0131_analyzed.pdfCooldown_0131_copperbar_halfR.pdfCooldown_0131_flexstrap_halfR.pdf 
  2718   Mon Feb 7 16:06:36 2022 StephenDailyProgress 31 Jan Fastest Radiative Cooling run, ended 07 Jan[Radhika, Stephen]

The heater was turned on at 3:13pm
on Friday 2/4.
  
  2749   Tue Apr 5 16:47:46 2022 RadhikaDailyProgress Rerun of cooldown with indium gaskets in copper bar joints[Radhika, Stephen]

On Thursday 3/31 we opened up with
a goal to diagnose and fix the heater
 9x 
  2750   Wed Apr 6 10:31:55 2022 ranaDailyProgress Rerun of cooldown with indium gaskets in copper bar jointsI think this is a nice debugging find.
Its not very robust to use the workstations
as 24/7 script machines (as we have found
  