40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog, Page 56 of 56  Not logged in ELOG logo
    Reply  Wed May 18 21:53:31 2022, rana, DailyProgress, Emissivity estimation, Megastat Inner Shield for emissivity estimation 
    Reply  Tue May 31 17:53:07 2022, rana, DailyProgress, Emissivity estimation, Si wafer emissivity testing 
    Reply  Fri Jun 10 16:23:04 2022, rana, DailyProgress, Emissivity estimation, Megastat cooldown - repainted inner shield aquadag, added aquadag foil to cold plate 
    Reply  Sun Nov 27 15:13:42 2022, rana, DailyProgress, Emissivity estimation, Alumina samples 
Entry  Wed Jun 2 20:24:26 2010, rana, alastair, Misc, GYRO, Optics moved 
Entry  Fri Feb 4 19:38:49 2011, rana, joeB, Computing, DAQ, fb0 problems fixed: daqd, nds, and atffe all now running Untitled.png
    Reply  Sun Dec 27 23:47:34 2009, rana?, Laser, GYRO, SB frequency 
    Reply  Tue Apr 22 16:25:24 2008, rob, Laser, PSL, Profile of 35W PSL 
    Reply  Wed Aug 19 11:20:03 2009, rob, Computing, DAQ, billions flower.png
    Reply  Wed Aug 19 11:27:59 2009, rob, Computing, PMC, PMC Loop Changed 
    Reply  Mon Sep 28 17:43:47 2009, rob, Computing, DAQ, Hack @ DAQ 
Entry  Tue Sep 7 09:14:22 2021, shruti, Misc, Equipment transfer, TED200C borrowed 
    Reply  Fri Feb 25 17:09:53 2022, shruti, Update, WOPO, Waking up WOPO - green beam 
    Reply  Fri Mar 4 11:49:45 2022, shruti, Update, WOPO, Waking up WOPO - attempts at readout LO_shot_noise.pdf
    Reply  Tue Mar 22 09:19:38 2022, shruti, Update, WOPO, Waking up WOPO - back to green path before_opt.jpgaround_waveguide.png
Entry  Mon Mar 28 14:29:22 2022, shruti, Safety, Cleanliness, Lab flooding Flooding.zip
    Reply  Thu Apr 21 10:33:33 2022, shruti, Update, WOPO, Still figuring out the readout electronics and fixing of some stuff 
    Reply  Thu Feb 2 07:49:23 2012, steve, Laser, GYRO, New vacuum system viewport design 
    Reply  Wed Mar 7 08:50:04 2012, steve, Laser, GYRO, chamber leak hunting advice 
    Reply  Wed Mar 7 09:05:22 2012, steve, Laser, GYRO, input-side viewports installed & design flaw 
Entry  Fri Aug 17 19:59:28 2012, tara, Electronics, TempCtrl, temp control for EOM 
Entry  Tue Aug 21 23:29:38 2012, tara, Misc, TempCtrl, thermal insulation for cold finger and EOM IMG_1607.JPGIMG_1608.jpgIMG_1609.JPG
Entry  Wed Sep 12 20:56:59 2012, tara, Electronics, General, seismometers installed IMG_1730.jpgIMG_1731.jpgIMG_1729.jpgIMG_1732.jpg
    Reply  Thu Sep 27 03:33:55 2012, tara, Laser, GYRO, PSL/Gyro beat setup beat_2012_09_27
Entry  Wed Dec 12 16:10:19 2007, tobin, Lab Infrastructure, HVAC, Lab Temperature 
Entry  Wed Dec 12 16:19:00 2007, tobin, Lab Infrastructure, HVAC, Lab Temperature temperature.pdf
Entry  Thu Dec 13 18:47:02 2007, tobin, Lab Infrastructure, HVAC, Lab Temperature 
Entry  Tue Dec 18 13:49:50 2007, tobin, Lab Infrastructure, HVAC, Lab Temperature temperature-20071218.pdf
Entry  Fri Dec 21 21:27:12 2007, tobin, Lab Infrastructure, HVAC, Lab Temperature 
Entry  Wed Jan 2 15:10:24 2008, tobin, Lab Infrastructure, HVAC, Lab Temperature 
Entry  Thu May 29 20:00:48 2008, tobin, Computing, Fugly, borkspace compiling 
Entry  Sun Jun 1 18:52:49 2008, tobin, Computing, General, borkspace compiling 
ELOG V3.1.3-