40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Entry  Fri Aug 20 15:36:01 2010, Dmass, Laser, Doubling, Spectrum Incoming. MZ1_2pn.pdf
    Reply  Wed Aug 25 22:18:35 2010, Dmass, Laser, Doubling, Spectrum Incoming. MZSpecSumDiff.pdf
       Reply  Wed Aug 25 22:58:12 2010, rana, Laser, Doubling, Spectrum Incoming. 
Message ID: 962     Entry time: Fri Aug 20 15:36:01 2010     Reply to this: 984
Author: Dmass 
Type: Laser 
Category: Doubling 
Subject: Spectrum Incoming. 
  • File saved under /users/dmass/rawdata/MZSpecs/scrn000(2/3).txt
  • Calibration: 7.04Vpp = Green Diff Span (balanced)
  • 14.2Vpp = IR Diff Span (balanced)

 Big things not done:

  • Phase matching temperature found
  • Box not weighed down / screwed down

Would like to do

  • Quick calibration of MZ PZT control signal to get this trended as well, so I can simultaneously measure ERR and CONTROL of IR along side the  green spectrum
Attachment 1: MZ1_2pn.pdf  29 kB  Uploaded Fri Aug 20 19:20:20 2010  | Hide | Hide all
MZ1_2pn.pdf
ELOG V3.1.3-