40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Message ID: 33     Entry time: Tue Feb 26 21:05:47 2008
Author: Stefan Ballmer 
Type: Laser 
Category: General 
Subject:  
Additionally to what Rana mentioned, there are two more signals hooked up:

SUS_LEFT (Ch4): PMC PZ control signal (from the SR560 loop)
SUS_RIGHT (Ch5): PMC transmitted power

We also hooked up the SUS_L_ACT (Ch4) DAC to the Laser temperature control.
Using this we closed the slow loop for the PMC
ELOG V3.1.3-