40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Entry  Mon Mar 28 14:29:22 2022, shruti, Safety, Cleanliness, Lab flooding Flooding.zip
    Reply  Mon Mar 28 16:09:57 2022, Aidan, Safety, Cleanliness, Lab flooding Flood_in_sub-basement-20220328.pdf
       Reply  Mon Mar 28 18:00:43 2022, Koji, Safety, Cleanliness, Lab flooding 
          Reply  Tue Mar 29 09:13:20 2022, Aidan, Safety, Cleanliness, Lab flooding IMG_8104.jpgIMG_8103.jpgIMG_8102.jpgIMG_8101.jpgIMG_8100.jpg
             Reply  Wed Mar 30 10:46:49 2022, Radhika, Safety, Cleanliness, Lab flooding IMG_3227.jpegIMG_3228.jpegIMG_3234.jpegIMG_3233.jpegIMG_3231.jpeg
                Reply  Wed Mar 30 16:25:06 2022, Koji, Safety, Cleanliness, Lab flooding 
                   Reply  Fri Apr 1 13:53:02 2022, Radhika, Safety, Cleanliness, Lab flooding 
                      Reply  Mon Apr 4 17:05:20 2022, Radhika, Safety, Cleanliness, Lab flooding IMG_3298.jpegIMG_3299.jpegIMG_3300.jpeg
Message ID: 2745     Entry time: Mon Apr 4 17:05:20 2022     In reply to: 2744
Author: Radhika 
Type: Safety 
Category: Cleanliness 
Subject: Lab flooding 

Pictures attached. WS1 and WS2 have been turned back on, since the replacement for the ceiling panels will not arrive for another few weeks according to Facilities.

Quote:

Facilities will be returning on Monday 4/4 between 8-9 AM to remove all ceiling panels above the workstations in B265B (QIL). Replacement of the panels is not yet scheduled, but in the meantime the open ceiling will be covered and the workstations will still be accessible. 

 

Attachment 1: IMG_3298.jpeg  1.664 MB  Uploaded Mon Apr 4 18:05:31 2022  | Hide | Hide all
IMG_3298.jpeg
Attachment 2: IMG_3299.jpeg  1.878 MB  Uploaded Mon Apr 4 18:05:43 2022  | Hide | Hide all
IMG_3299.jpeg
Attachment 3: IMG_3300.jpeg  2.059 MB  Uploaded Mon Apr 4 18:05:51 2022  | Hide | Hide all
IMG_3300.jpeg
ELOG V3.1.3-