Mon Mar 28 14:29:22 2022, shruti, Safety, Cleanliness, Lab flooding
|
Mon Mar 28 16:09:57 2022, Aidan, Safety, Cleanliness, Lab flooding
|
Mon Mar 28 18:00:43 2022, Koji, Safety, Cleanliness, Lab flooding
|
Tue Mar 29 09:13:20 2022, Aidan, Safety, Cleanliness, Lab flooding    
|
Wed Mar 30 10:46:49 2022, Radhika, Safety, Cleanliness, Lab flooding    
|
Wed Mar 30 16:25:06 2022, Koji, Safety, Cleanliness, Lab flooding
|
Fri Apr 1 13:53:02 2022, Radhika, Safety, Cleanliness, Lab flooding
|
Mon Apr 4 17:05:20 2022, Radhika, Safety, Cleanliness, Lab flooding  
|
|
Message ID: 2742
Entry time: Wed Mar 30 10:46:49 2022
In reply to: 2741
Reply to this: 2743
|
Author: |
Radhika |
Type: |
Safety |
Category: |
Cleanliness |
Subject: |
Lab flooding |
|
|
[Radhika, Shruti]
This morning, facilities removed all the porous ceiling panels that had been soaked/damaged by water (in B265B: above WS1 and WS2, see Attachments 1+2; In B265A, see Attachment 3). Specifically in B265A, an enclosure was created (Attachment 4) and a dehumidifier was placed inside. All monitors/equipment underneath the panels were thoroughly covered, and the floors were swept up afterward.
No work was done above the North table in the QIL. I asked about it and facilities said they would look into it, but it wasn't on the schedule for today. A member of facilities also pointed out that the sink in the QIL was running black liquid (Attachment 5). It looks like soil/dirt entered the water pipes? This seemed to also be outside of their scope for today. |
|
|
|
|
|
|
|
|
|
|