Entry  Fri Mar 18 19:34:35 2022, Radhika, DailyProgress, Cryo vacuum chamber, Megastat cooldown 3/18 - adding indium gaskets to copper bar joints 8x
    Reply  Thu Mar 24 16:08:35 2022, Radhika, DailyProgress, Cryo vacuum chamber, Megastat cooldown 3/18 - adding indium gaskets to copper bar joints cooldown_0319_vs_0310.pdf
Message ID: 2734     Entry time: Fri Mar 18 19:34:35 2022     Reply to this: 2736
Author: Radhika 
Type: DailyProgress 
Category: Cryo vacuum chamber 
Subject: Megastat cooldown 3/18 - adding indium gaskets to copper bar joints 

Today I opened up Megstat to add indium in between the copper bar joints, with the hopes of speeding up cooldown and informing the thermal model.

Outline of procedure:

  • Disconnected RTD pins/sockets and removed suspension from chamber (with test mass)
  • Removed inner shield and outer shield from chamber       
    • Cleaned up residual grease/aquadag from cold plate
  • Opened up bottom conflat of the T to access ends of the 2 copper bars
  • Unbolted copper bars and removed from chamber [Attachment 1]
    • Gave copper bars a good wipe down with isopropyl to remove old grease
  • Placed 2 indium gaskets previously prepared by Stephen between joints of the two bars [Attachments 2, 3, 4]
    • Fed the bars back through the chamber tube and placed additional indium gasket between top bar and cold head
    • Placed last indium gasket between flexible strap and bottom copper bar in chamber body
  • Bolted up the copper bars, passed through 2 sheets of aluminized mylar to insulate copper bars [Attachment 5]
  • Resecured the cold head RTD with spring clamp, inserted mylar "cap" around cold heat [Attachments 6, 7]
  • Touched up shields
    • Reapplied grease to bottom lip of inner shield
    • Added some more kapton tape to secure peek sheets to bottom lip of outer shield
    • Reinserted shields, bolted down inner shield
  • Reinserted suspension frame with test mass [Attachment 8]
  • Reconnected RTDs and closed up

The roughing pump was turned on at 7:20pm, followed by the cryocooler at 7:50pm.

Attachment 1: IMG_3191.jpeg  346 kB  Uploaded Thu Mar 24 16:58:41 2022  | Hide | Hide all
IMG_3191.jpeg
Attachment 2: IMG_3197.jpeg  371 kB  Uploaded Thu Mar 24 16:58:51 2022  | Hide | Hide all
IMG_3197.jpeg
Attachment 3: IMG_3194.jpeg  370 kB  Uploaded Thu Mar 24 16:59:00 2022  | Hide | Hide all
IMG_3194.jpeg
Attachment 4: IMG_3195.jpeg  354 kB  Uploaded Thu Mar 24 16:59:08 2022  | Hide | Hide all
IMG_3195.jpeg
Attachment 5: IMG_3206.jpeg  233 kB  Uploaded Thu Mar 24 16:59:23 2022  | Hide | Hide all
IMG_3206.jpeg
Attachment 6: IMG_3204.jpeg  88 kB  Uploaded Thu Mar 24 16:59:40 2022  | Hide | Hide all
IMG_3204.jpeg
Attachment 7: IMG_3205.jpeg  102 kB  Uploaded Thu Mar 24 16:59:51 2022  | Hide | Hide all
IMG_3205.jpeg
Attachment 8: IMG_3210.jpeg  246 kB  Uploaded Thu Mar 24 17:00:56 2022  | Hide | Hide all
IMG_3210.jpeg
ELOG V3.1.3-