40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Entry  Mon Feb 7 11:57:38 2022, Stephen, DailyProgress, Cryo vacuum chamber, Doubled Thermal Linkage Capacity run started 11 Feb 2022 D2000310_y-004_section_double_linkage_20220207.png
    Reply  Tue Feb 15 11:59:22 2022, Radhika, DailyProgress, Cryo vacuum chamber, Doubled Thermal Linkage Capacity run started 11 Feb 2022 Cu_bar_comparison.pdfcooldown_0211_all.pdf
       Reply  Tue Feb 15 16:54:27 2022, rana, DailyProgress, Cryo vacuum chamber, Doubled Thermal Linkage Capacity run started 11 Feb 2022 
    Reply  Wed Feb 16 11:35:18 2022, Stephen, DailyProgress, Cryo vacuum chamber, Doubled Thermal Linkage Capacity run started 11 Feb 2022 
Message ID: 2722     Entry time: Wed Feb 16 11:35:18 2022     In reply to: 2717
Author: Stephen 
Type: DailyProgress 
Category: Cryo vacuum chamber 
Subject: Doubled Thermal Linkage Capacity run started 11 Feb 2022 

[Stephen, Radhika]

The heater was turned on on Wed, 2/16 at 11:30am, with control setpoint 123K. The lower power limit was verified to be 0W.

The cryocooler was turned off on Thu, 2/17 at 12pm. The heater control setpoint was changed to 295K for warmup. The plan is to address the wacky cold head RTD on Monday.

ELOG V3.1.3-