Entry  Mon Jan 31 15:40:21 2022, Stephen, DailyProgress, , 31 Jan Fastest Radiative Cooling run started 
    Reply  Fri Feb 4 14:00:19 2022, Radhika, DailyProgress, , 31 Jan Fastest Radiative Cooling run started Cooldown_0114_analyzed.pdfCooldown_0131_analyzed.pdfCooldown_0131_copperbar_halfR.pdfCooldown_0131_flexstrap_halfR.pdf
       Reply  Wed Feb 9 15:21:27 2022, rana, Howto, TempCtrl, plots 
    Reply  Mon Feb 7 16:06:36 2022, Stephen, DailyProgress, , 31 Jan Fastest Radiative Cooling run, ended 07 Jan 
Message ID: 2718     Entry time: Mon Feb 7 16:06:36 2022     In reply to: 2715
Author: Stephen 
Type: DailyProgress 
Category:  
Subject: 31 Jan Fastest Radiative Cooling run, ended 07 Jan 

[Radhika, Stephen]

The heater was turned on at 3:13pm on Friday 2/4.

We specified a set temperature of 123K. However, the CTC100 PI control included a 1 W lower limit on the input to the heater, so there was a steady load of 1 W applied to the Silicon Workpiece over the weekend.

At 16:01 the cryocooler was turned off to start the warmup.

The CTC100 PI control was configured with a setpoint of 250 K on the Workpiece RTD, to aid in the warmup, and an allowable power range from 0 W to 22 W.