Subject: Two under table equipment racks purchased for North Table - one installed so far 

I bought two racks to house all our electronics which is currently taking up space on the North Table. The legs were exactly the same length as the clearance between the floor and the bottom fo the table - but not after I got the hacksaw involved. Thankfully the legs have plugs on the top whic cover up the sharp bits that I cut.

Next step is to start transferring the equipment below the table.

Attachment 1: IMG_4407.jpg  3.713 MB  Uploaded Thu Aug 26 17:13:34 2021  | Hide | Hide all
IMG_4407.jpg
Attachment 2: IMG_4423.jpg  2.911 MB  Uploaded Thu Aug 26 17:16:29 2021  | Hide | Hide all
IMG_4423.jpg
Attachment 3: IMG_4421.jpg  1.874 MB  Uploaded Thu Aug 26 17:16:38 2021  | Hide | Hide all
IMG_4421.jpg
Attachment 4: IMG_4422.jpg  1.186 MB  Uploaded Thu Aug 26 17:16:46 2021  | Hide | Hide all
IMG_4422.jpg
ELOG V3.1.3-