40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Message ID: 2646     Entry time: Wed Aug 18 13:06:03 2021
Author: Aidan, Stephen 
Type: Lab Infrastructure 
Category: Cleanliness 
Subject: North table clean-up 

Stephen and I spent about an hour today tidying up the North Table in preparation for 2um photodiode testing in the Megastat.

Decepticon - Transformers Wiki

I ordered two more wire racks (24" deep, 36" wide, 27" high with two shelves each) to go under the table and serve as instrumentation racks.

Attachment 1: IMG_4230a.jpg  995 kB  Uploaded Wed Aug 18 14:09:33 2021  | Hide | Hide all
IMG_4230a.jpg
Attachment 2: IMG_4232a.jpg  1.146 MB  Uploaded Wed Aug 18 14:10:12 2021  | Hide | Hide all
IMG_4232a.jpg
ELOG V3.1.3-