Entry  Mon Jul 26 01:30:42 2021, Koji, Summary, Cryo vacuum chamber, Prep for the 2nd cooling of the suspension 
    Reply  Mon Jul 26 22:49:00 2021, Koji, Summary, Cryo vacuum chamber, Aquadag painting 10x
       Reply  Wed Jul 28 00:59:47 2021, Koji, Summary, Cryo vacuum chamber, The test mass successfully suspended P_20210727_154143.jpegP_20210727_190356.jpegP_20210727_190426.jpegP_20210727_190543.jpeg
          Reply  Thu Jul 29 00:42:38 2021, Koji, Summary, Cryo vacuum chamber, The test mass successfully suspended 
             Reply  Thu Jul 29 13:11:17 2021, Koji, Summary, Cryo vacuum chamber, Cooling progress: Update temp_log_cool_down_20210728_1830.pdfcooling_model1.pdfcooling_model2.pdfOSEM_cooling.pdf
                Reply  Fri Jul 30 12:22:56 2021, Koji, Summary, Cryo vacuum chamber, Cooling curve comparisons comparison_cold_head.pdfcomparison_inner_shield.pdfcomparison_test_mass.pdf
                   Reply  Sun Aug 1 22:22:00 2021, Koji, Summary, Cryo vacuum chamber, Cooling update temp_log_cool_down_20210728_1830.pdfcooling_meas.pdfOSEM_cooling.pdfcooldown_210728.zip
                      Reply  Mon Aug 2 13:25:32 2021, Stephen, DailyProgress, Cryo vacuum chamber, Warmup started 02 August 
                         Reply  Tue Aug 3 23:56:00 2021, Koji, DailyProgress, Cryo vacuum chamber, Warmup started 02 August P_20210804_000247.jpgP_20210803_235421.jpg
Message ID: 2620     Entry time: Wed Jul 28 00:59:47 2021     In reply to: 2619     Reply to this: 2621
Author: Koji 
Type: Summary 
Category: Cryo vacuum chamber 
Subject: The test mass successfully suspended 

[Stephen Koji]

While Stephen worked on the RTD reattachment, I worked on the suspension part.

- First of all, we found that the magnet was delaminated from the silicon mass (Attachment 1). It was bonded on the test mass again.

- The suspension frame was tweaked so that we have ~max suspension length allowed.

- The first attempt of suspending the mass with steel wires (0.0017" = 43um dia.) failed. Stephen and I went to downs and brought some reels.

- I chose the wire with a diameter of 0.0047" (= 119um) (Attachment 2). ~8x stronger! The suspension was successfully built and the mass is nicely sitting on the 4 strain releasing bars (improvised effort). (Attachments 3/4)

We can install the suspension in the chamber tomorrow (today, Wed)!

 

Attachment 1: P_20210727_154143.jpeg  1.442 MB  Uploaded Wed Jul 28 02:02:12 2021  | Hide | Hide all
P_20210727_154143.jpeg
Attachment 2: P_20210727_190356.jpeg  2.840 MB  Uploaded Wed Jul 28 02:02:12 2021  | Hide | Hide all
P_20210727_190356.jpeg
Attachment 3: P_20210727_190426.jpeg  3.207 MB  Uploaded Wed Jul 28 02:02:12 2021  | Hide | Hide all
P_20210727_190426.jpeg
Attachment 4: P_20210727_190543.jpeg  3.241 MB  Uploaded Wed Jul 28 02:02:12 2021  | Hide | Hide all
P_20210727_190543.jpeg
ELOG V3.1.3-