04/01/21
Aidan and I removed the old PD from the cryo chamber in order to start testing C3 (plan for tomorrow, 04/02).
Steps:
- Brought chamber up to room pressure, disconnected readout wires and vacuum pump.
- Picked up chamber and placed it upside down on makeshift support stand (see pics).
- Unscrewed outer and inner insulation plates.
|