- Took a delay line box DB64 from QIL from the WOPO table to the 2um (formerly known as Crackle) lab. The box was marked Crackle on it.
- Took the compressed nitrogen cylinder for optics cleaning which was stored in Adaptive Optics lab.
- Took some lens from the cabinet in Adaptive optics lab.
- Took some other optics parts like pedestals, posts, lens mount etc.
See SUS_Lab/1877 |