Came into lab today, with two main goals:
1) Bring Downs equipment for vibration measurements of cryo cooler during next operation
--> DONE, see photo
2) Assemble shields, with two layer scheme using electropolished and mill finish panels.
--> issue: the electropolished shield set was only partially shipped out in Ticket 15101 - unfortunately there was a misinterpretation by Logistics personnel regarding which parts to ship, due to the formatting of the ticket page. I will coordinate shipment of the balance of the panels to the vendor Able Electropolishing for completion of PO S479514 |