Entry  Fri Jul 17 15:54:42 2020, Stephen, Lab Infrastructure, Cryo vacuum chamber,  
    Reply  Fri Jul 24 04:46:51 2020, Stephen, Lab Infrastructure, Cryo vacuum chamber,  
Message ID: 2498     Entry time: Fri Jul 24 04:46:51 2020     In reply to: 2497
Author: Stephen 
Type: Lab Infrastructure 
Category: Cryo vacuum chamber 
Subject:  

Copper parts picked up July 23rd and brought to QIL, now only waiting on PO# S477874 and the pirani gauge from Koji's bulk JPL order

Quote:

Torque driver set for QIL setup bolted joints, with range 15 in*oz - 50 in*lb, p/n WIHA 5HYL9, is on order from Grainger, with anticipated delivery in the week of July 20th. Refer to  PO S477925. *update* Tracking Number UPS 1Z19W9330321365493

Cryo connection copper parts PO S475316 will be finished early next week by the machine shop in Torrance, I'll bring them to campus or to Raymond's place (TBD).

 