Entry  Mon Feb 24 18:41:06 2020, Raymond, Lab Infrastructure, HVAC, Table Shielding for 2020-02-25 HVAC repairs QIL_HVACshielding1_2020-02-24.JPGQIL_HVACshielding2_2020-02-24.JPGQIL_HVACshielding3_2020-02-24.JPGQIL_HVACshielding4_2020-02-24.JPG
    Reply  Tue Feb 25 15:12:22 2020, Raymond, Chris, Koji, Chub, Aidan, Lab Infrastructure, HVAC, HVAC work concluded for today 
       Reply  Mon Mar 9 13:13:02 2020, Koji, Lab Infrastructure, HVAC, HVAC work concluded for today 
Message ID: 2486     Entry time: Mon Feb 24 18:41:06 2020     Reply to this: 2487
Author: Raymond 
Type: Lab Infrastructure 
Category: HVAC 
Subject: Table Shielding for 2020-02-25 HVAC repairs 

[Raymond, Chris, Koji, Chub, Aidan, Duo]

Both tables were surrounded with plastic shielding in preparation for the HVAC maintenance/repairs to be performed tomorrow, Tuesday 24/02/2020. The IR Lab cryostat roughing and turbo pumps were turned off to avoid overheating while inside their new plastic cocoon. Sticky floor mats were placed in the oil-slick area in front of the flammables cabinet to improve safety for all foot traffic in the area, as well as to mitigate the urge to boogie while working in the lab. 

Attachment 1: QIL_HVACshielding1_2020-02-24.JPG  1.963 MB  | Hide | Hide all
QIL_HVACshielding1_2020-02-24.JPG
Attachment 2: QIL_HVACshielding2_2020-02-24.JPG  2.396 MB  | Hide | Hide all
QIL_HVACshielding2_2020-02-24.JPG
Attachment 3: QIL_HVACshielding3_2020-02-24.JPG  1.767 MB  | Hide | Hide all
QIL_HVACshielding3_2020-02-24.JPG
Attachment 4: QIL_HVACshielding4_2020-02-24.JPG  1.811 MB  | Hide | Hide all
QIL_HVACshielding4_2020-02-24.JPG