Entry  Fri Nov 15 17:29:14 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab IMG_0270.JPGIMG_0269.JPG
    Reply  Tue Nov 19 20:16:40 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab IMG_0483.JPG
       Reply  Wed Nov 20 11:59:17 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
          Reply  Wed Nov 20 12:25:58 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
             Reply  Wed Nov 20 17:44:10 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab P_20191120_174034_vHDR_On.jpgP_20191120_174040_vHDR_On.jpg
                Reply  Thu Nov 21 21:45:10 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab DT02H_18_32PN.pdf
                   Reply  Fri Nov 22 13:21:26 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab IMG_0497.JPGIMG_0498.JPG
                      Reply  Fri Nov 22 15:33:40 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab P_20191122_150845_vHDR_On.jpg
                         Reply  Sat Nov 23 13:00:06 2019, Koji, Lab Infrastructure, Optics, Optical window transmission measurement optical_window_T.pdfP_20191122_183426_vHDR_On.jpgP_20191122_183436_vHDR_On.jpg
                         Reply  Tue Nov 26 15:36:59 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab IRLabsQIL.pdf
                            Reply  Wed Dec 4 13:54:04 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
Message ID: 2454     Entry time: Thu Nov 21 21:45:10 2019     In reply to: 2452     Reply to this: 2456
Author: Raymond 
Type: Lab Infrastructure 
Category: General 
Subject: Moved IR Labs cryostat into QIL from Cryo Lab 

Ordered the electrical feedthrough from IR Labs on overnight shipping. I've attached the diagram of the feedthrough, 32 pin is the only available configuration for this size feedthrough. 

Will attempt to use my makeshift 12 pin feedthrough if the proper one does not arrive tomorrow (thanks Koji for the 40m drill bit tip). I'll clear the bench of the IR Labs carcasses tomorrow.

UPDATE: feedthrough will arrive by 10:30 on Monday the 25th

Attachment 1: DT02H_18_32PN.pdf  101 kB  | Hide | Hide all
DT02H_18_32PN.pdf