40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Entry  Fri Nov 15 17:29:14 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab IMG_0270.JPGIMG_0269.JPG
    Reply  Tue Nov 19 20:16:40 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab IMG_0483.JPG
       Reply  Wed Nov 20 11:59:17 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
          Reply  Wed Nov 20 12:25:58 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
             Reply  Wed Nov 20 17:44:10 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab P_20191120_174034_vHDR_On.jpgP_20191120_174040_vHDR_On.jpg
                Reply  Thu Nov 21 21:45:10 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab DT02H_18_32PN.pdf
                   Reply  Fri Nov 22 13:21:26 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab IMG_0497.JPGIMG_0498.JPG
                      Reply  Fri Nov 22 15:33:40 2019, Koji, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab P_20191122_150845_vHDR_On.jpg
                         Reply  Sat Nov 23 13:00:06 2019, Koji, Lab Infrastructure, Optics, Optical window transmission measurement optical_window_T.pdfP_20191122_183426_vHDR_On.jpgP_20191122_183436_vHDR_On.jpg
                         Reply  Tue Nov 26 15:36:59 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab IRLabsQIL.pdf
                            Reply  Wed Dec 4 13:54:04 2019, Raymond, Lab Infrastructure, General, Moved IR Labs cryostat into QIL from Cryo Lab 
Message ID: 2450     Entry time: Wed Nov 20 11:59:17 2019     In reply to: 2448     Reply to this: 2451
Author: Koji 
Type: Lab Infrastructure 
Category: General 
Subject: Moved IR Labs cryostat into QIL from Cryo Lab 

Ah, I have designed the PD holder with the venting targeted for 1/4-20 holes with 1" grid...

The dog clamps to hold the PD units also need to be compatible with 4-40 screws.

How big the hole diameter should be? Can you find a suitable drill at the 40m?

 