A historical note - electricians from Facilities visited the lab several weeks ago and installed new electrical service. To do this with a minimum of disruption to the lab, they de-installed some electrical outlets along the south wall and reused the conductors. They also taped up plastic sheeting to the table enclosure to protect the squeezing and laser stabilization experiments. |