40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Message ID: 2285     Entry time: Fri Dec 21 15:23:02 2018
Author: Rahul 
Type: DailyProgress 
Category: Cryo vacuum chamber 
Subject: Chamber closed for 1st pump down test 

The cryo vacuum chamber was closed yesterday (Thursday) for the 1st pump down test. The figure below shows various components which was attached on to the CF flanges. Later I will post the results of the ongoing pump down test.

Attachment 1: Picture1.jpg  353 kB  | Hide | Hide all
Picture1.jpg
Attachment 2: Picture2.jpg  411 kB  | Hide | Hide all
Picture2.jpg
Attachment 3: Picture3.png  1.983 MB  | Hide | Hide all
Picture3.png
Attachment 4: Picture4.jpg  539 kB  | Hide | Hide all
Picture4.jpg
ELOG V3.1.3-