I submitted the PD board design for manufacture today. I didn't know what was the best way to do this, so I've put it in through Techmart by attaching the .zip file. I'll call the company in a couple of days to check that they received the order. It should take 4days to manufacture so we should have them soon. I'll update the svn folder with the current design and put the files on the DCC. |