Message ID: 1244     Entry time: Wed Jan 12 16:48:06 2011
Author: Zach 
Type: Laser 
Category: GYRO 
Subject: Clean slate 

 [Alastair, Zach]

We have completely dismantled the iGYRO. All optical components have been put in the cabinet closest to our table (on the west side), and all cables and electronics have been sorted and put away for easy retrieval. The only exceptions to this are some cables that are strung across the table (above) that we are sure to need later anyway. We also wiped the top of the table down with acetone to remove some dirty/sticky spots and outdated marks, as well as reinstalled the cable trays that used to be on the door to the PSL lab and put the cables back in an organized way. See pictures below. 

We will likely begin the reinstallation tomorrow.