40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Entry  Wed Apr 22 11:33:24 2009, Dmass, Computing, DAQ, DAQ back up and running 
    Reply  Wed Apr 22 14:47:47 2009, Dmass, Computing, DAQ, DAQ back up and running 
Message ID: 119     Entry time: Wed Apr 22 14:47:47 2009     In reply to: 118
Author: Dmass 
Type: Computing 
Category: DAQ 
Subject: DAQ back up and running 

This got the oms system back up and running. Data was going into the ADC, through the filters, and back out the DAC.

I got the ATF system up and running, but had to change one more thing.

in the /cvs/cds/caltech/target/fb/master file there is a line which tells you which .ini file to use (in /cvs/cds/caltech/chans/daq/) If this is not set correctly nothing will really work.

We can configure it to have more than one system run at the same time by giving them different dcuids, but until we want to do that, to change to a new system, after you configure your sys.ini file, you have to manually put it in the master file.

 

On to medm screens.

 

Quote:

This from Alex:

"Looks like we changed GM nodename from fb into fb0 in the code, so I had
to rename the node in /etc/gm/hostname.

It is up and running"

 

 

 

ELOG V3.1.3-