40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Entry  Tue Sep 14 04:14:25 2010, Dmass, Misc, Doubling, Doubling results summary 
    Reply  Wed Sep 15 17:04:36 2010, Dmass, Misc, Doubling, DON'T REMOVE OPTICS YET 
       Reply  Wed Sep 15 22:59:37 2010, Frank, Misc, Doubling, DON'T REMOVE OPTICS YET 
    Reply  Tue Sep 21 01:52:05 2010, Dmass, Misc, Doubling, Doubling results summary AllanVarSep2.pdf
       Reply  Thu Oct 6 23:44:09 2011, Dmass, Misc, Doubling, Finishing SHG paper AvarWhitePhase.pdfAvarWhiteFreqNoise.pdfAvarPhase1onfhalf.pdf
          Reply  Mon Oct 10 11:55:59 2011, Dmass, Misc, Doubling, Finishing SHG paper Avar2PhaseSchnatz.pdf
    Reply  Wed Sep 22 17:16:09 2010, Dmass, Misc, Doubling, Some notes on previous bounds 
       Reply  Mon Jan 24 17:17:59 2011, Dmass, Misc, Doubling, Some notes on previous bounds 
Message ID: 1059     Entry time: Wed Sep 15 22:59:37 2010     In reply to: 1054
Author: Frank 
Type: Misc 
Category: Doubling 
Subject: DON'T REMOVE OPTICS YET 
sorry, did this already earlier this afternoon. Only moved the laser and the first two turning mirrors as they
were in the 35W beam path.

<p>
<table width="98%" cellspacing="1" align="center" style="border: 1px solid rgb(72, 96, 144);">
    <tbody>
        <tr>
            <td style="background-color: rgb(72, 96, 144); color: white;" cellpadding="3px">Quote:</td>
        </tr>
        <tr>
            <td style="background-color: rgb(255, 255, 176);" cellpadding="10px">
            <p>Please wait to mess with the optical path until I take pictures (today)</p>
            </td>
        </tr>
    </tbody>
</table>
</p>
<p>&nbsp;</p>
ELOG V3.1.3-