40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 9 of 11
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
544 Entries
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
Next
Thu Sep 10 04:03:42 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary)
Wed Sep 23 17:49:50 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary)
Tue Dec 15 13:42:37 2015, Koji, Optics, Characterization, Dimensions / packaging of HQE PDs
Sun Mar 6 02:13:28 2016, Koji, Optics, Characterization, PD glass reflections
Sun Mar 13 22:02:09 2016, Koji, Optics, Characterization, HQEPD QE measurement (direct comaprison)
Sat Mar 26 01:49:48 2016, Koji, Optics, Characterization, HQEPD QE
Tue Aug 23 23:36:54 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC)
7x
Thu Aug 25 02:17:09 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC)
Fri Sep 9 19:43:32 2016, Koji, Optics, General, D1102211 OMC Diode Mount Glass Block went to Downs
Mon Nov 21 21:19:20 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling
Wed Dec 7 19:18:10 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling
Tue May 16 19:05:18 2017, Koji, Optics, Configuration, OMC SN002 fix - temporary optics
Fri Jun 23 01:58:11 2017, Koji, Optics, General, OMC #002 Repair - CM1 gluing
6x
Fri Jun 23 10:55:07 2017, Koji, Optics, General, Dust layer on black glass beam dumps?
Sat Jul 1 15:29:57 2017, Koji, Optics, General, Black glass cleaning / Final bonding for the emergency repair for OMC #002
Thu Feb 22 20:21:02 2018, Koji, Optics, Characterization, aLIGO EOM test
Mon Apr 2 17:27:04 2018, Koji, Optics, Characterization, aLIGO EOM test
Sat May 5 22:51:04 2018, Koji, Optics, General, 3IFO EOM Optical test
Tue May 15 19:53:45 2018, Koji, Optics, General, EOM Q comparison
Wed May 30 17:44:23 2018, Koji, Optics, Characterization, 3IFO EOM surface check
Sun Sep 23 19:42:21 2018, Koji, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
Thu Sep 27 20:19:15 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
Thu Jan 10 20:42:54 2019, Koji, Optics, Characterization, FSR / HOM Test of OMC SN002
Thu Jan 10 20:45:00 2019, Koji, Optics, Characterization, PZT test cable
Sat Jan 12 22:49:11 2019, Koji, Optics, Characterization, PM-SM patch cable mode cleaning effect
Sat Feb 2 16:17:13 2019, Koji, Optics, Characterization, Summary: OMC(001) HOM structure recalculation
Sat Feb 2 20:03:19 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (before mirror replacement)
Sat Feb 2 20:28:21 2019, Koji, Optics, Characterization, Summary: OMC(003) HOM structure recalculation
Sat Feb 2 20:35:02 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (after mirror replacement)
Fri Apr 5 01:07:18 2019, Koji, Optics, Characterization, OMC(002): transmitted beam images
Fri Apr 5 01:08:17 2019, Koji, Optics, Characterization, OMC(002): DCPD / QPD alignment
Fri Apr 5 20:50:54 2019, Koji, Optics, Characterization, OMC(002): QPD alignment
Mon Apr 15 21:11:49 2019, Philip, Optics, Characterization, OMC(004): PZT testing for spare OMC
Tue Apr 16 11:36:36 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC
9x
Tue Apr 16 16:35:09 2019, Koji, Optics, Configuration, OMC(004): Glass breadboard selection
Tue Apr 16 16:52:36 2019, Koji, Optics, Configuration, OMC(004): B Mirror selection
Tue Apr 16 17:24:56 2019, Koji, Optics, Configuration, OMC(004): E Mirror selection
Tue Apr 16 21:16:11 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC
Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1
Thu Apr 18 20:47:54 2019, Joe, Optics, , OMC initial alignment and locking
Fri Apr 19 09:21:07 2019, Philip, Optics, , Cleaning of OMC optics
Fri Apr 19 11:34:19 2019, Koji, Optics, , OMC initial alignment and locking
Sat Apr 20 00:50:12 2019, Koji, Optics, Characterization, OMC(004): Spot positions
Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors
Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1
Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow
Wed May 1 15:40:46 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
Fri May 3 11:06:28 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
Next
ELOG V3.1.3-