40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 9 of 13  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categoryup Subject Text Attachments
  214   Thu Jul 31 15:07:53 2014 KojiGeneralGeneralItem lendingTara: Laser Safety goggle ->
Returned

Evan:
  
  215   Mon Aug 4 18:59:50 2014 KojiGeneralGeneralA memorandomOn breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808
  
  216   Tue Aug 5 13:03:25 2014 KojiGeneralGeneralMissing cable componentsDCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282
PD faster: 92210A07 Qty 4: MCMASTER
  
  219   Sat Jan 17 11:40:04 2015 KojiGeneralGeneral3rd OMC completedJan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables
were installed (Helicoils inserted)
  
  220   Fri Jan 30 19:31:08 2015 KojiGeneralGeneralItem lendingGabriele:

PZT HV Amp

Evan:
  
  221   Tue Feb 3 18:23:49 2015 KojiGeneralGeneralItem lending- The laser was removed and shipped to
LHO today.

- UV illuminator / fused silica
  
  222   Wed Feb 4 20:07:24 2015 KojiGeneralGeneralItem lendingShipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super
Spot MK III)
 C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG 
  223   Wed Feb 18 21:51:23 2015 KojiGeneralGeneralNotes on OMC Transportation Fixtures & PelicanLLO has one empty OMC transportation fixture.

LHO has one empty OMC transportation
fixture.
  
  226   Tue Jul 21 20:20:12 2015 KojiGeneralGeneralItem lendingKate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
  
  235   Thu Aug 20 01:35:01 2015 KojiElectronicsGeneralOMC DCPD in-vacuum electronics chain testWe wanted to know the  transimpedance
of the OMC DCPD at high frequency (1M~10M).
For this purpose, the OMC DCPD chain
 OMC_DCPD_Chain.pdfOMC_DCPD_Transimpedance.pdf 
  236   Wed Aug 26 11:31:33 2015 KojiElectronicsGeneralOMC DCPD in-vacuum electronics chain testThe noise levels of the output pins (pin1/pin6)
are measured. Note that the measurement is
done with SE. i.e. There was no common mode
 OMC_DCPD_OutputNoise.pdf 
  239   Sun Sep 6 16:50:51 2015 KojiElectronicsGeneralUnit test of the EOM/AOM Driver S1500118TEST
Result: S1500118

Additional
 P9037810.JPGRF_AM_spectra.pdf 
  249   Tue Dec 29 12:15:46 2015 KojiGeneralGeneralGlasgow polarizer passed to KateThe Glasgow polarizer was passed to Kate
on Dec 17, 2015.
  
  262   Fri Jul 22 22:24:05 2016 KojiGeneralGeneralHQEPD inventoryAs of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016
  
  264   Mon Aug 15 10:09:10 2016 KojiGeneralGeneralPrev H1 OMC shipped to CITPrevious H1 OMC shipped from LHO to CIT

https://ics-redux.ligo-la.caltech.edu/JIRA/browse/Shipment-8196
  
  265   Mon Aug 22 12:58:16 2016 KojiGeneralGeneralUV bond samples -> Garilynn- FS base + Mounting Prism

- FS or SF2 1/2" piece + FS
or SF2 1/2" piece
  
  268   Fri Sep 9 14:34:31 2016 KojiGeneralGeneralItem lendingTo 40m

First Contact Kit by Calum

Class A Kapton sheets
  
  269   Fri Sep 9 19:43:32 2016 KojiOpticsGeneralD1102211 OMC Diode Mount Glass Block went to DownsD1102211 OMC Diode Mount Glass Block (11pcs)
have been given to Calum@Downs
  
  270   Mon Nov 21 21:19:20 2016 KojiOpticsGeneralLWE NPRO Laser / Input Optics / Fiber Coupling- About 1.5 month ago, an 700mW LWE NPRO
has been brought to OMC Lab.

- The SOP can be found here.
  
  271   Wed Dec 7 19:18:10 2016 KojiOpticsGeneralLWE NPRO Laser / Input Optics / Fiber CouplingFIber Input Mount 132deg
Fiber output mount 275deg
-> 525mW P: 517mW S: 8mW extinction
  
  272   Wed Dec 7 21:18:35 2016 KojiGeneralGeneralOMC placed on the table / the beam roughly alignedThe OMC mode matching sled was fixed on
the nominal part of the table. Then the OMC
was located at the nominal position marked
 DSC_0082.jpgDSC_0084.jpg 
  273   Thu Dec 8 21:17:09 2016 KojiGeneralGeneralOMC placed on the table / the beam roughly alignedThe OMC cavity was locked. The alignment
was precisely adjusted. The mode matching
was optimized by the lens positions. The
  
  274   Thu Jan 19 20:57:53 2017 KojiSupplyGeneralPurchaseOrdered:

Office Depot
v AA battery Qty. 24
  
  275   Thu Feb 16 17:23:12 2017 KojiSupplyGeneralPurchase
BNC Patch Panel

8x
Amphenol Connex 112443 / Isolated BNC FEMALE
TO FEMALE BULKHEAD ISOLATED ADAPTER - 50
  
  281   Fri Jun 23 01:58:11 2017 KojiOpticsGeneralOMC #002 Repair - CM1 gluing[Alena, Koji]

Jun 21: Alena and Koji
worked on gluing of the CM1 mirror on the
 6x 
  282   Fri Jun 23 10:55:07 2017 KojiOpticsGeneralDust layer on black glass beam dumps?I wondered why the black glass beam dumps
looked not as shiny as before. It was in
fact a layer of dusts (or contaminants) accumulated
 black_glass_dust.JPG 
  283   Sat Jul 1 15:29:57 2017 KojiOpticsGeneralBlack glass cleaning / Final bonding for the emergency repair for OMC #002[Alena, Koji] 

Report of the work on June
30.
 DSC_0347.jpgDSC_0348.jpgDSC_0350.jpgDSC_0352.jpgDSC_0354.jpg 
  284   Sat Jul 1 21:33:18 2017 KojiGeneralGeneralSome purchase notes- Forgot to close the cylinder valve...

v HEPA prefilter (20"x20"x1"
MERV 7)
  
  285   Wed Jul 5 16:59:44 2017 KojiGeneralGeneralThe OMC #002 was packed[Stephen Koji]

The OMC #002 was packed for the
transportation to Downs.
 DSC_0360.JPG 
  288   Fri Sep 8 15:14:05 2017 KojiFacilityGeneralPreparation for the plumbing work[Steve, Aaron, Koji]

We've finished the preparation
for the forthcoming plumbing work on (nominally)
 7x 
  289   Mon Nov 27 20:24:24 2017 KojiGeneralGeneralA former LHO PD (Trans) removed from the OMC #002 for the shipment to StockholmAttachment 1: The PD was
removed from the transmission side of the
OMC #002 (former LHO OMC - the one blasted
 6x 
  290   Thu Nov 30 12:18:41 2017 StephenGeneralGeneralPreparation for Modal Testing on 4 DecemberNorna Robertson, Stephen Appert || 
29 Nov 2017, 2 pm to 4 pm  || 
227 Downs, CIT
  
  294   Sat May 5 22:51:04 2018 KojiOpticsGeneral3IFO EOM Optical testThe 3IFO EOM test performed at
the 40m. Result: 40m
ELOG 13819
  
  295   Tue May 15 19:53:45 2018 KojiOpticsGeneralEOM Q comparisonQs' were estimated with a lorentzian
function (eye fit)

  
  300   Mon Jul 2 15:27:31 2018 Rich AbbottElectronicsGeneralWork on EOM (3rd IFO unit)Koji, Rich

We took apart the unit removed
from the 3rd IFO (Unit serial number aLIGO
 EOM3_aLIGO_3rdIfo.JPG 
  307   Wed Aug 29 11:06:30 2018 KojiGeneralGeneralRF AM RIN and dBc conversion0. If you have an RF signal whose waveform
is , the amplitude is constant and 1.
  
  308   Sun Sep 23 19:42:21 2018 KojiOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirror[Koji Gautam]


With Gautam's help,
I ran a coating design code for an HR mirror
 reflectivities.pngtransmission.pngphase_diff.pngphase_difference_histogram.png 
  309   Thu Sep 27 20:19:15 2018 AaronOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirrorI started some analytic calculations of
how OMC mirror motion would add to the noise
in the BHD. I want to make some prettier
  
  310   Thu Nov 1 19:57:32 2018 AaronOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirrorI'm still not satisfied/done with the
solution to this, but this has gone too long
without an update and anyway probably someone
  
  314   Fri Feb 1 12:52:12 2019 KojiMechanicsGeneralPZT deformation simulationA simple COMSOL simulation was run to see
how the PZT deforms as the voltage applied.

Use the geometry of the ring PZT
 pzt.png 
  321   Thu Apr 4 20:07:39 2019 KojiSupplyGeneralPurchase== Office Depot ==
Really
Useful Box 9L x 6 (delivered)
  
  325   Fri Apr 5 23:30:20 2019 KojiGeneralGeneralOMC (002) repair completedOMC(002)
repair completed

When the cable harness of OMC(004)
 P_20190405_222401.jpgP_20190405_222509.jpgP_20190405_222529.jpg 
  326   Wed Apr 10 19:22:24 2019 KojiGeneralGeneralOMC(004): preparation for the PZT subassembly bonding Preparation for the PZT subassembly
bonding (Section 6.2 and 7.3 of T1500060
(aLIGO OMC optical testing procedure)
  
  327   Thu Apr 11 10:54:38 2019 StephenGeneralGeneralOMC(004): preparation for the PZT subassembly bonding


Quote:


  
  329   Thu Apr 11 21:22:26 2019 KojiMechanicsGeneralOMC(004): PZT sub-assembly gluing[Koji Stephen]

The four PZT sub-assemblies were
glued in the gluing fixtures. There were
 IMG_7561.jpgIMG_7567.jpg 
  330   Thu Apr 11 21:22:58 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly air baking[Stephen Koji]

The baking of the PZT subassemblies
was more complicated than we initially thought.
 temp_profile.pdfbake.xlsx 
  331   Sun Apr 14 23:58:49 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection[Koji Stephen]

(Friday afternoon) We retrieved
the PZT sub-assemblies to the clean room.
  
  332   Mon Apr 15 00:08:32 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7)Sub-ASSY
#7

Probably the best glued unit among
 6x 
  333   Mon Apr 15 00:39:04 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8)Sub-ASSY
#8

Probably the best glued unit among
 8x 
  334   Mon Apr 15 01:07:30 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9)Sub-ASSY
#9

The most fractured unit among four.
 7x 
ELOG V3.1.3-