40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 9 of 11
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
544 Entries
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
Next
ID
Date
Author
Type
Category
Subject
Text
402
Sat Nov 21 13:58:30 2020
Koji
Electronics
Characterization
Dark Current Measurement for InGaAs QPDs
Dark current measurement for InGaAs QPDs
(OSI FCI-InGaAs-Q3000) has been done using
Keithley 2450 and Frank's diode test
403
Sun Nov 22 13:49:12 2020
Koji
Electronics
Characterization
Impedance Measurement for InGaAs QPDs
To know any anomaly to the junction
capacitance of the QPD segments, the RF impedances
were tested with a hand-made impedance measurement.
404
Mon Nov 23 23:17:19 2020
Koji
Electronics
Characterization
The dark noise of the Q3000 QPDs
The dark noise levels of the four Q3000
QPDs were measured with FEMTO DLPCA200 low
noise transimpedance amp.
405
Tue Nov 24 10:45:07 2020
gautam
Electronics
Characterization
The dark noise of the Q3000 QPDs
I see that these measurements are done
out to 100 kHz - I guess there is no reason
to suspect anything at 55 MHz which is where
406
Tue Nov 24 12:27:18 2020
Koji
Electronics
Characterization
The dark noise of the Q3000 QPDs
The amplifier BW was 400kHz at the gain
of 1e7 V/A. And the max BW is 500kHz even
at a lower gain. I have to setup something
407
Fri Feb 5 07:40:37 2021
Stephen
Supply
General
OMC Unit 4 Build Machined Parts
OMC Unit 4 Build Machined Parts are currently
located in Stephen's office. See image
of large blue box from office, below.
408
Thu May 20 17:03:50 2021
Koji
General
General
SRS LCR meter SRS720 borrowed from Downs
Item loan: SRS LCR meter SRS720 borrowed
from Downs. The unit is at the 40m right
now for testing with an excelitas PD. Once
409
Sun May 30 15:17:16 2021
Koji
General
General
DCPD AF capacitance measirement
Attachment 1: System diagram.
The reverse bias voltage is controlled by
DS335. This can produce a voltage offset
410
Sun May 30 15:32:56 2021
Koji
General
General
DCPD AF capacitance measirement
Measurement result:
The capacitance at no bias was
460~500pF. This goes down to below 300pF
411
Wed Jul 7 14:21:50 2021
Stephen
Supply
General
OMC Unit 4 Build Machined Parts
More explicit insights into the inventory
for the Unit 4 build. Image of inventory
included below.
412
Thu Jun 23 21:03:33 2022
Koji
Facility
General
Moving the small optical table to CAML (TCS Lab)
I've cleared the small optical table
and wondered how to move it out of the room.
Fortunately, the north side of the big table
413
Tue Jun 28 16:13:34 2022
Koji
General
General
The small optical table not small enough to get out
The table width was an inch too large compared
to the door width. We need to tilt the table
and it seemed too much for us. Let's
414
Fri Jul 15 22:14:14 2022
Koji
General
General
OMC Lab recovery for the OMC #002 test
- The lab is chilly (18degC)
- Cleaned the lab and the optical
table a bit so that the delicate work can
415
Mon Jul 18 14:20:09 2022
Koji
General
General
OMC #002 Plan Portal
==
Initial Preparation ==
[Done] OMC #002
416
Tue Jul 19 03:17:56 2022
Koji
General
General
OMC #002 Power Budget before mirror cleaning
o Power Budget (2022/07/18)
NPRO ADJ -50 (min)
Fiber incident 62.8mW
417
Thu Jul 21 02:55:06 2022
Koji
General
General
OMC #002 Power Budget after mirror cleaning
o Power Budget after FirstContact
cleaning (2022/07/20)
NPRO ADJ -50 (min)
418
Thu Jul 21 13:21:27 2022
Koji
General
Configuration
Windows laptop for WincamD Beam'R2 recovery
The Windows laptop for WincamD/Beam'R2
(DELL Vostro3300) was not functional.
- Windows 7 got stuck in the starting
419
Thu Jul 21 14:35:35 2022
Koji
General
General
Bond reinforcement blocks for the invar brackets
Bond reinforcement blocks for the
invar brackets:
Attachment 1:
420
Thu Jul 21 14:55:48 2022
Koji
General
General
Optics bonding for the backscatter measurement
The backscatter beam is supposed to appear
in the backpropagation path. The transmission
of the OMC has a couple of optics, it's
421
Thu Jul 21 17:47:00 2022
Koji
General
General
The profile of the beam incident on the fiber input coupler
The profile of the beam incident on the
fiber input
The fiber input was deflected by
422
Fri Jul 22 00:31:17 2022
Koji
General
General
OMC #002 backscatter measurement
Measure the power ratio between the forward-propagating
and reverse-propagating beams.
Place a small deflecting
423
Fri Jul 22 17:41:01 2022
Koji
General
General
SRS LCR meter SRS720 returned to Downs
SRS LCR meter SRS720 was returned to Downs
as before.
424
Fri Jul 22 17:47:38 2022
Koji
General
General
C&B request for the reinforcement blocks
OMC Reinforcement blocks
1. P/N D1600316; Version v4; Type
01; Qty 30; Source Chemistry Machine Shop
425
Mon Jul 25 18:25:04 2022
Koji
General
General
A/C Filter was replaced
New filter PN
Grainger
TK70457312T Mini-Pleat Air Filter,
426
Tue Jul 26 00:01:59 2022
Koji
General
General
OMC #002 delamination check 2
More epoxy delamination check:
DCPD R (Attachment 1):
Found half delaminated
427
Tue Jul 26 00:12:58 2022
Koji
General
General
High QE PD: QE measurements
- Installed the High QE PDs to OMC #002
B1-22@Cage B1 was
installed to the transmission DCPD
B1-23@Cage
428
Wed Jul 27 10:09:51 2022
Koji
General
General
4+4 wire clamp in hand
Regarding: D1200971
- 4 CLASS A wire clamp obtained
429
Wed Jul 27 10:34:09 2022
Koji
General
General
High QE PD: QE measurements 2
- DLPCA-200 trans-impedance amplifier was
calibrated.
Keithley source meter 2450
430
Wed Jul 27 10:34:30 2022
Koji
General
General
OMC #002 Protective FirstContact Paint
The optical surfaces were coated with FirstContact
to keep them clean / somewhat protected during
the transportation.
431
Wed Jul 27 23:52:18 2022
Koji
General
General
OMC #002 Cable bracket replacement (1)
Parts
check
- D1300052-V3 SN001 is going to
432
Thu Jul 28 00:28:15 2022
Koji
General
General
OMC #002 Cable bracket replacement (2)
Connector
unmounting
- (Attachment 1)
433
Thu Jul 28 00:46:47 2022
Koji
General
General
Subject: OMC #002 Cable bracket replacement (3)
Checking the spare parts
- Conclusion for OMC#2:
need PEEK cable
434
Wed Aug 10 18:42:27 2022
Koji
General
General
OMC #002 Cable bracket replacement (4)
[Stephen Koji]
Now we got the C&Bed parts
to continue to work on the cable bracket
435
Thu Aug 11 15:24:57 2022
Koji
General
General
OMC #002 Cable bracket replacement (5)
- The hole size extension
is going forwared now.
436
Mon Aug 15 21:31:56 2022
Koji
General
General
OMC #002 Cable bracket replacement (6)
The cable bracket was successfully
replaced.
Looking from the QPD side
437
Mon Aug 15 22:06:18 2022
Koji
General
General
OMC #002 new cable tie installed
[Stephen Koji]
New cable ties were installed on
the cable pegs attached to the long sides
438
Mon Aug 15 22:43:35 2022
Koji
General
General
OMC #002 Delamination repair Part1 (1)
[Stephen Koji]
Checked the delamination
status:
439
Mon Aug 15 22:49:03 2022
Koji
General
General
OMC #002 Delamination repair Part1 (2)
EP30-2
preparation
Two Al foil cups + A sheet
7x
440
Wed Aug 24 02:51:23 2022
Koji
General
General
OMC #002 Delamination repair Part1 (3)
Inspection of the bonding on the
suspension interface side. All look good.
8x
441
Wed Aug 24 02:53:46 2022
Koji
General
General
OMC #002 Delamination repair Part2 (1)
Inspection of the delaminations in the
optics side
442
Wed Aug 24 02:57:43 2022
Koji
General
General
EP30-2 bonding setup
EP30-2 bonding setup
443
Wed Aug 24 03:20:59 2022
Koji
General
General
OMC #002 Delamination repair Part2 (2)
Bonding
11x
444
Wed Aug 24 03:26:43 2022
Koji
General
General
OMC #002 Delamination repair Part2 (3)
Inspection
8x
445
Wed Aug 24 11:29:47 2022
Koji
General
General
OMC #002 ready for shipment
[Stephen Koji]
The OMC #002 is ready for
shipment.
446
Thu Aug 25 14:22:08 2022
Koji
General
General
LLO OMC #001 Ballast Mass investigation
Inspected the past LLO add-on mass configuration.
There are unknown masses at the
DCPD side. It looks like a small SS mass
447
Thu Aug 25 20:05:00 2022
Koji
General
General
LLO OMC #001 Ballast Mass investigation
Here is the balance mass info for the LLO
OMC#001 analyzed from the photographs
Added masses are: 50+10g,
448
Fri Aug 26 22:29:02 2022
Koji
General
General
Tool Shipping Prep
Shipping preparation for the LLO
trip
Started
July 15, 2022 and finished Aug 30. So it
449
Tue Sep 20 08:54:33 2022
Koji
General
General
PD cage arrangement
Upon the LLO work, the current PD arrangement
in the cages are:
CAGE B
450
Mon Sep 26 14:27:49 2022
Koji
General
General
LLO OMC ICS work
OMC
#001
ICS Link: https://ics.ligo-la.caltech.edu/JIRA/browse/ASSY-D1201439-1
Already
451
Mon Nov 7 21:16:16 2022
Camille
Optics
Configuration
Setting up the fiber couplers
[Camille, Koji]
Began setting up fiber assembly
for OMC testing: