Entry  Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov]
[Dec]
Entry  Wed Nov 7 01:28:20 2012, Koji, Optics, Characterization, Wedge angle test (A1) wedge_measurement.pngwedge_measurement_setup.png
Wedge angle test
Result: Wedge angle of Prism A1: 0.497 deg +/- 0.004 deg

 
Entry  Wed Oct 17 20:36:04 2012, Koji, Optics, General, RoC test cavity locked detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf
The RoC test setup has been built on the optical table at ATF.

The cavity formed by actual OMC mirrors have been locked.
Entry  Tue Oct 16 15:51:01 2012, Koji, General, General, Plan Update: October [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov] [Dec]

Facility/Supplies
Entry  Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!] 

    Work done
    
        Floor cleaning
[ELOG]
        Placing sticky
mats [ELOG]
        Label Maker
Entry  Tue Oct 16 14:50:54 2012, jamie, jeff, General, General, OMC breadboard/plate measurement dimensions 
We have measured the dimensions and mass of the OMC glass plates/breadboards:




S/N
Mass (g)
Length
(mm)
Width (mm)
Height (mm)
Notes


01
6146
449.66
149.85
41.42,
Entry  Fri Oct 12 17:15:19 2012, Koji, Optics, General, Loan from the 40m / ATF 

    HWP set
         
    
        Optics: CVI QWPO-1064-08-2-R10

       Mount: New Focus #9401
        
Entry  Tue Oct 9 05:03:15 2012, Koji, Electronics, General, OMC Test Electronics Setup electronics_setup.pngelectronics_setup.pdf
 
Entry  Tue Oct 9 04:59:24 2012, Koji, Optics, General, OMC Test Optical Setup OMC_test_setup.pngOMC_test_setup.pdf

 
Entry  Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response 
EGE&G 2mm photodiode angle response measured by Sam T1100564-v1
Entry  Fri Oct 5 03:39:58 2012, Koji, Optics, General, RoC Test setup RoC_test_setup.pdfRoC_test_setup.png
Based on Zach's experiment design, I wrote up a bit more detailed optical layout for the mirror test.
Entry  Tue Sep 25 14:18:14 2012, Koji, Clean, General, Particle Counts 
Particle counts
Before the prefilter is installed: 0.5um 1191cnts, 0.7um 346cnts
2:20 prefilter installed
    Reply  Mon Oct 1 16:06:55 2012, Koji, Clean, General, Particle Counts 
1. It turned out that the particle counter MET ONE 227A at ATF shows 
(particle count)/(0.1 ft^3) 
Entry  Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools P8171968.jpgP8171969.jpg
Last Friday, new workbenches were installed. Vladimir got a new table and a cleanroom stool.
Entry  Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack P8131959.JPGP8131961.JPG
Clean supplies & some cleaning tools are located at the right side of the entrance.
The file cabinet there was moved to the left side of the door, but will be removed eventually.
Entry  Mon Aug 13 17:01:35 2012, Koji, Clean, General, Particle Counts 
Aug 13, 2012 / 0.5um 1000~2000/(0.1 cu ft) / 0.7um   400-600/(0.1 cu ft) by ATF particle counter (MET ONE 227A)
They are counts/(0.1 ft^3)! These numbers should be multiplied by 10 to know the particle "CLASS".
Entry  Mon Aug 13 16:59:11 2012, Koji, Clean, General, Room Cleaning Log 
Floor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug 15, 2012)
Floor wiped with a wet wiper (Sep 25, 2012)
Entry  Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier P8131960.JPG
It seemed that a laser safety barrier was installed today!?
Entry  Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect P8011949.JPGP8011947.JPGP8011948.JPG
- The floor of the room was cleaned and waxed!
- Sticky mats are placed! Now we require shoe covers!
Entry  Tue Jul 31 21:33:17 2012, Koji, General, General, Plan Update: August [!] 
Completed work of the previous months: [Jul] [Aug] [Sep] [Oct] [Nov] [Dec]

Facility/Supplies

    Work done
    
        Floor
Entry  Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!] 

    Completed Work: Facility/Supplies
    
        Plug a big hole on the wall [ELOG]
        Purchasing work benches
Entry  Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references 
Nicolas Smith,
LIGO Document T0900383-v1 
3mm Photodiode Characterization for Enhanced LIGO
Entry  Fri Jun 29 11:26:04 2012, Zach, Optics, Characterization, RoC measurement setup RoC_measurement_setup.pngRoC_measurement_setup.graffle.zip
Here is the proposed RoC measurement setup. Koji tells me that this is referred to as "Anderson's method".
We would like to use a linear cavity to measure the RoC of the curved mirrors independently (before forming the ring cavity), since the degeneracy
of HOMs will make the fitting easier.
    Reply  Sun Jul 22 15:56:53 2012, Zach, Optics, Characterization, RoC measurement setup detailed_RoC_setup.pngdetailed_RoC_setup.graffle.zip
Here is a more detailed version of the setup, so that we can gather the parts we will need.
Entry  Wed Jul 18 23:20:13 2012, Koji, Optics, Characterization, Mode scan results of ELIGO 
Nic Smith sent me a bunch of elog lists where the results of the mode scan can be found.
From Nic:
There have been many mode scan analyses done at LLO:
Entry  Sat Jul 14 02:16:07 2012, Koji, General, General, Plan Update: July P7071878.jpg
Facility/Supplies

    Work in progress     
    
        Floor cleaning
        Plug slits on the roof of the HEPA booth - blanking panels have been ordered 
Entry  Thu Jun 21 03:07:27 2012, Zach, Optics, Configuration, Parameter selection / mode definition geom_bowtie.pnggeom_non-bowtie.png
EDIT 2 (ZK): As with the previous post, all plots and calculations
here are done with my MATLAB cavity modeling utility, 
Entry  Wed Jun 20 20:37:45 2012, Zach, Optics, Configuration, Topology / parameter selection 8x
EDIT (ZK): All the plots here were generated using my MATLAB
cavity modeling tool, ArbCav
Entry  Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched P6191706.jpg
 
Entry  Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List 
Facility

    Work
    
        Replacing wooden work benches
        
    
       W60" x H28-34" x D30" 
Entry  Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan 
LIGO Document G1200683-v1: 
aLIGO OMC fabrication and testing plan
aLIGO OMC wiki