40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 1 of 7  Not logged in ELOG logo
Entry  Tue Sep 20 08:54:33 2022, Koji, General, General, PD cage arrangement 
Upon the LLO work, the current PD arrangement in the cages are:
CAGE B
B1 OMC1 PDT (A1-23)
Entry  Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal 
== Initial Preparation ==


[Done] OMC #002 placement 
[Done] OMC #002 locking
Details OMC
ELOG 414


== Measurements ==
    Reply  Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning 
o Power Budget (2022/07/18)
NPRO ADJ -50 (min)
Fiber incident 62.8mW
       Reply  Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning 
o Power Budget after FirstContact cleaning (2022/07/20)
NPRO ADJ -50 (min)
Fiber incident --.-mW
    Reply  Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets IMG_1095.JPGIMG_1091.JPG
Bond reinforcement blocks for the invar brackets:


Attachment 1: CLASS A glass prisms (the surplus of the 2016 repair)
Attachment 2: Dirty
reiforcement bars made of Aluminum
There are also many dirty prisms in the kit obtained from Stephen
    Reply  Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement IMG_1098.JPG
The backscatter beam is supposed to appear in the backpropagation path. The transmission of the OMC has a couple of optics, it's not easy to access
that beam.
To try to deflect the beam either horizontally or vertically, small optical pieces were made. (Attachment)
    Reply  Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler fiber_beam_profile.pdf
The profile of the beam incident on the fiber input

The fiber input was deflected by a 45deg mirror. The beam profile was measured with WincamD. The beam was too strong (~60mW) even at the smallest
pump power (ADJ -50) of the NPRO. So the two ND20 filters were added to the lens right before the 45 deg mirror and the camera.
    Reply  Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement OMC_backscatter.pdf
Measure the power ratio between the forward-propagating and reverse-propagating beams.


Place a small deflecting mirror at the transmission.
Place a flat mirror at the deflected transmission. When the alignment
of this mirror is adjusted to retroreflect this beam, the DC of the cavity reflection PD increases, and also the CCD shows spurious fringes.
This
    Reply  Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks PXL_20220722_222013127.jpg
OMC Reinforcement blocks

1. P/N D1600316; Version v4; Type 01; Qty 30; Source Chemistry Machine Shop
2. P/N D1600316; Version v4; Type 02; Qty 15; Source Chemistry Machine Shop
    Reply  Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements IMG_1118.JPG
- Installed the High QE PDs to OMC #002


B1-22@Cage B1 was installed to the transmission DCPD
B1-23@Cage B1 was installed to the reflection
DCPD


Upon the installation, the legs of the PDs were cut by 3mm. Also, the tab of the PD could not be embedded in the DCPD housing.
       Reply  Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 IMG_1119.JPGIMG_1120.JPG
- DLPCA-200 trans-impedance amplifier was calibrated.
  Keithley source meter 2450 was connected to the amp. Provide current and read the output voltage with the precision digital voltage meter
(Agilent/Keysight).
    Reply  Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand PXL_20220727_072154009.jpg
Regarding: D1200971

- 4 CLASS A wire clamp obtained from the OMC spare
- 4 more DIRTY wire clamp obtained from WB experiments (they no longer use these)
    Reply  Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint IMG_1125.JPG
The optical surfaces were coated with FirstContact to keep them clean / somewhat protected during the transportation.
The PD aperture was sealed with FirstContact "caps" (made by Kate in 2016?).
    Reply  Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1) IMG_1126.JPGIMG_1135.JPGIMG_1127.JPGIMG_1129.JPGIMG_1130.JPG
Parts check

- D1300052-V3 SN001 is going to be used (Attachment 1)

- This is the PEEK version of the cable bracket (Attachment 2). The side thread holes have no Helicoils inserted. This
    Reply  Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  IMG_1132.JPGIMG_1133.JPGIMG_1136.JPG
Connector unmounting

- (Attachment 1) The connector nut rings were removed using an angled needle nose plier. The connector shell has a tight dimension
relative to the hole on the bracket. But of course, they could be extracted.
    Reply  Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3) IMG_1137.JPGIMG_1148.JPGIMG_1138.JPG
Checking the spare parts 

- Conclusion for OMC#2: need PEEK cable ties
- for more OMCs: need more BHCS / PEEK cable ties / Helicoils
    Reply  Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4) PXL_20220809_235457354.jpgPXL_20220811_011910569.jpgPXL_20220811_013746139.jpg
[Stephen Koji]

Now we got the C&Bed parts to continue to work on the cable bracket replacement.

1) Helicoil insertion
       Reply  Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5) 
- The hole size extension is going forwared now.

- Madeline and Chub are cleaning (sonicating) a drill (29/64=0.4531")
    Reply  Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  IMG_1155.JPGIMG_1149.JPGIMG_1150.JPG
The cable bracket was successfully replaced.


Looking from the QPD side (North side in Attachment 1), the connectors for the DCPDs and PZT are sticking out, and the
ones for QPDs are sticking to the other side. So only two rectangular holes (for QPDs) are facing north.


Top left is DCPDT
Top
    Reply  Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed IMG_1929.JPGIMG_1930.JPG
[Stephen Koji]

New cable ties were installed on the cable pegs attached to the long sides of the cable bracket.

 
    Reply  Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) IMG_1926.JPGPXL_20220816_011346581.jpg
[Stephen Koji]

Checked the delamination status:


The Invar bar on the cable bracket (DCPD side): Almost all delaminated (Attachment 1 left)
The invar bar on the cable bracket
       Reply  Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
EP30-2 preparation


Two Al foil cups + A sheet of Al foil (for test cure)
Set a tube on the glue gun
Attach an applicator tube
Push
a couple of times, and dispense the glue for a single stroke on a waste Al cup
Pour the 6g of glue to the other cup.
Add 0.3g of
          Reply  Wed Aug 24 02:51:23 2022, Koji, General, General, OMC #002 Delamination repair Part1 (3) 8x
Inspection of the bonding on the suspension interface side. All look good.
    Reply  Wed Aug 24 02:53:46 2022, Koji, General, General, OMC #002 Delamination repair Part2 (1) IMG_1168.JPGIMG_1169.JPGIMG_1170.JPGIMG_1171.JPGIMG_1175.JPG
Inspection of the delaminations in the optics side
       Reply  Wed Aug 24 03:20:59 2022, Koji, General, General, OMC #002 Delamination repair Part2 (2) 11x
Bonding
          Reply  Wed Aug 24 03:26:43 2022, Koji, General, General, OMC #002 Delamination repair Part2 (3) 8x
Inspection

 
    Reply  Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup IMG_1178.JPGIMG_1179.JPGIMG_1180.JPG
EP30-2 bonding setup
    Reply  Wed Aug 24 11:29:47 2022, Koji, General, General, OMC #002 ready for shipment IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg
[Stephen Koji]

The OMC #002 is ready for shipment.

Attachment 1: Work done on Sept 19, 2022
    Reply  Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG
Inspected the past LLO add-on mass configuration.

There are unknown masses at the DCPD side. It looks like a small SS mass with an estimated mass of 5g. But the DCC number is unknown.

We are going to add 10g on each corner as well as the damping aterial. We should be able to figure out the fastener / mass configuration.
       Reply  Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation balance_mass_config_LLO.pdf
Here is the balance mass info for the LLO OMC#001 analyzed from the photographs


Added masses are: 50+10g, 50+20, 10+20+5, and 20+20+10 for the mass right above FM1/CM1/FM2 and CM2, respectively.
The length
of the 1/4-20 screws seem L=3/4"~1"


If we attach the additional mass, longer 1/4-20 screws (1", 1" 1/8, 1" 1/4)
    Reply  Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg
Shipping preparation for the LLO trip

Started July 15, 2022 and finished Aug 30. So it took ~1.5 months (with a
couple weeks of break)


Class B special tools
Entry  Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test PXL_20220716_035922673.jpgPXL_20220716_025319391.MP.jpgPXL_20220716_025334324.jpgPXL_20220716_035309066.jpgPXL_20220716_035411435.NIGHT.jpg
- The lab is chilly (18degC)

- Cleaned the lab and the optical table a bit so that the delicate work can be done. The diode test rig (borrowed from Downs - see OMC
ELOG 408 and OMC ELOG 409) was removed from the table and brought to the office (to return
    Reply  Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2 IMG_1106.JPGIMG_1107.JPGIMG_1110.JPG
More epoxy delamination check:

DCPD R (Attachment 1): Found half delaminated

DCPD T (Attachment 2): Found half delaminated
Entry  Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced 

New filter PN
Grainger
TK70457312T Mini-Pleat Air Filter, Style - Air Filters Box, Performance Rating MERV 14, Nominal Filter Size 12x24x2

 

Previous
Entry  Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs P_20210520_154841.jpg
Item loan: SRS LCR meter SRS720 borrowed from Downs. The unit is at the 40m right now for testing with an excelitas PD. Once it is done, the setup will
be moved to the OMC lab for testing the high QE PDs
    Reply  Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement PD_cap_meas.pdf20210529013015_IMG_0577.jpeg20210529013114_IMG_0580_2.jpeg20210529013200_IMG_0584.jpeg20210529013229_IMG_0586.jpeg
Attachment 1: System diagram. The reverse bias voltage is controlled by DS335. This can produce a voltage offset up to 10V. A G=+2 opamp
circuit was inserted so that a bias of up to +15V can be produced. The capacitances of the photodiodes were measured with SR720 LCR meter with a probe.
DS335 and SR720 were controlled from PC/Mac via serial connections.
       Reply  Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement highQEPD_capacitance.pdfC30665_capacitance.pdf
Measurement result:

The capacitance at no bias was 460~500pF. This goes down to below 300pF at 1.0~1.5V reverse bias. At maximum +15V, the capacitance goes down
to 200~220pF.
    Reply  Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs PXL_20220723_002330805.jpg
SRS LCR meter SRS720 was returned to Downs as before.

 
Entry  Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery IMG_1102.JPG
The Windows laptop for WincamD/Beam'R2 (DELL Vostro3300) was not functional. 
- Windows 7 got stuck in the starting up process (Google "startup repair loop")
- The battery can't charge and the adapter connection is flaky
Entry  Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out IMG-5203.jpg
The table width was an inch too large compared to the door width. We need to tilt the table and it seemed too much for us. Let's ask the transportation
for handling.

Photo courtesy by Juan
Entry  Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab) PXL_20220624_035628602.jpg
I've cleared the small optical table and wondered how to move it out of the room. Fortunately, the north side of the big table had wide enough clearance
and let the 36" wide table go through. This was easy without moving other heavy stuff.

From here to the door, a bit of work is required. A possibility is to roll the laser blocking wall to the south side of the big table. This will
Entry  Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts IMG_8117.JPG
OMC Unit 4 Build Machined Parts are currently located in Stephen's office. See image of large blue box from office, below.

Loaned item D1100855-V1-00-OMC08Q004
to Don Griffith for work in semi-clean HDS assy.
    Reply  Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts IMG_9238.JPGIMG_9236.JPG
More explicit insights into the inventory for the Unit 4 build. Image of inventory included below.

Machined Parts:


New fabrication = Contents of Storage-11112 are consistent with
Entry  Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs Q3000_dark_current.pdf
Dark current measurement for InGaAs QPDs (OSI FCI-InGaAs-Q3000) has been done using Keithley 2450 and Frank's diode test kit. Frank's setup uses
various custom instruments which are no longer exist, therefore the kit was used only for switching between the segments.

The diodes were serialized as 81, 82, 83, 84, continuing the numbering for the OMC QPDs. The numbers are engraved at the side and the back of
    Reply  Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf
To know any anomaly to the junction capacitance of the QPD segments, the RF impedances were tested with a hand-made impedance measurement.
All segments look almost identical in terms of capacitance.

Measurement setup:
       Reply  Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs Q3000_dark_noise_81.pdfQ3000_dark_noise_82.pdfQ3000_dark_noise_83.pdfQ3000_dark_noise_84.pdf
The dark noise levels of the four Q3000 QPDs were measured with FEMTO DLPCA200 low noise transimpedance amp.

The measurement has been done in the audio frequency band. The amp gain was 10^7 V/A. The reverse bias was set to be 5V and the DC output of
the amplifier was ~40mV which corresponds to the dark current of 4nA. It is consistent with the dark current measurement.
          Reply  Tue Nov 24 10:45:07 2020, gautam, Electronics, Characterization, The dark noise of the Q3000 QPDs 
I see that these measurements are done out to 100 kHz - I guess there is no reason to suspect anything at 55 MHz which is where this QPD will be reading
out photocurrent given the low frequency behavior looks fine? The broad feature at ~80 kHz is the usual SR785 feature I guess, IIRC it's got to do
with the display scanning rate.
             Reply  Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs 
The amplifier BW was 400kHz at the gain of 1e7 V/A. And the max BW is 500kHz even at a lower gain. I have to setup something special to see the RF band
dark noise.
With this situation, I stated "the RF dark noise should be characterized by the actual WFS head circuit." in the 40m ELOG.
Entry  Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan 
FEMTO DLPCA200 low noise preamp (brand new)

Keithley Source Meter 2450 (brand new) => Returned 11/23/2020

were brought to the OMC lab for temporary use.
Entry  Mon Nov 9 22:06:18 2020, Koji, Mechanics, General, 5th OMC Transport Fixture IMG_0211.jpgIMG_0221.jpg
I helped to complete the 5th OMC Transport Fixture. It was built at the 40m clean room and brought to the OMC lab. The fixture hardware (~screws) were
also brought there.
Entry  Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL 
Thorlabs' powermeter controler + S401C head was lent from OMC Lab. Returned to OMC Jul 15, 2022 KA

https://nodus.ligo.caltech.edu:8081/SUS_Lab/1856
Entry  Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika 
See this entry: https://nodus.ligo.caltech.edu:8081/40m/15642
Entry  Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting 20201008214515_IMG_0152.jpg20201008214519_IMG_0153.jpg20201008214536_IMG_0154.jpg20201008220955_IMG_0155.jpg20201008221019_IMG_0156_2.jpg
To spare some room on the optical table, I wanted to mount the two TFT monitor units on the HEPA enclosure frame.
I found some Bosch Rexroth parts (# 3842539840) in the lab, so the bracket was taken for the mount. This swivel head works very well. It's rigid
and still the angle is adjustable.
    Reply  Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting 
The image flipping of the display unit was fixed. The vendor told me how to fix it.

- Open the chassis by the four screws at the side.
- Look at the pass-through PCB board between the mother and display boards.
Entry  Thu Oct 8 19:55:22 2020, Koji, General, Characterization, Power Measurement of Mephisto 800NE 1166A Mephisto800NE_1166A.pdf
The output of Mephisto 800NE (former TNI laser) was measured.
The output power was measured with Thorlabs sensors (S401C and S144C). The reference output record on the chassis says the output was 837mW at 2.1A
injection.
Entry  Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake IMG_6080.JPGIMG_6079.JPG
[Koji, Jordan, Stephen]

The beam dumps, bonded on Fri 06 Dec 2019, were placed in the newly tuned and configured small dirty ABO at the Bake Lab on Fri 13 Dec 2019.

Images are shared and references are linked below
    Reply  Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake P_20191218_160650_vHDR_On.jpegP_20191218_160705_vHDR_On.jpegP_20191218_160733_003.jpeg
The beamdumps were taken out from the oven and packed in bags.

The bottom of the V are completely "wet" for 17 BDs among 20 (Attachment 1/2).

3 BDs showed insufficient glue or delamination although there is no sign of lack of rigidity. They were separated from the others in the pack.
       Reply  Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake 

are there any measurements of the BRDF of these things? I'm curious how much light is backscattered into the incoming beam and how much goes
out into the world.

Maybe we can take some camera images of the cleaned ones or send 1-2 samples to Josh. No urgency, just curiosity.
          Reply  Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake 
According to the past backscatter test of the OMC (and the black glass beamdump: not V type but triangular type on a hexagonal-mount), the upper limit
of the back reflection was 0.13ppm. https://nodus.ligo.caltech.edu:8081/OMC_Lab/209

I don't have a BRDF measurement. We can send a few black glass pieces to Josh.
Entry  Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check 
Check-in to the OMC lab to see the status. Nothing seemed changed. No bug. The HEPA is running normal. The particle level was 0.

Went into the HEPA enclosure and put a cover on the OMC. Because of the gluing template, the lid could not be close completely (that's expected
and fine).
Entry  Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven 
Black and Decker Glue Baking Oven came back to the OMC lab on Aug 10, 2020, Georgia had lent the unit for the SAMS assembly/testing.
Entry  Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending 
Tara: Laser Safety goggle -> Returned

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
    Reply  Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending 
Gabriele:

PZT HV Amp

Evan:
       Reply  Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending 
- The laser was removed and shipped to LHO today.

- UV illuminator / fused silica fiber light guide / UV power meter / UV face shield (Qty 2) will be shipped to MIT.
They are CIT properties except for the illuminator.
          Reply  Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG
Shipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super Spot MK III)

2. UV Power meter (American Ultraviolet AIB1001) Caltech property C30140
             Reply  Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending 
Kate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
                Reply  Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending 
To 40m

First Contact Kit by Calum

Class A Kapton sheets
                   Reply  Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending P_20200227_134755_vHDR_On.jpg
Item lending as per Ian's request: Particle Counter from OMC Lab to QIL

 
                      Reply  Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending 
The particle counter came back to the OMC lab on Aug 10, 2020

 
Entry  Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing 6x
[Stephen, Koji]

20 glass beamdumps were bonded at the 40m cleanroom.


Attachment 1: We had 20 fused silica disks with a V-groove and 40 black glass pieces
Entry  Tue Oct 22 15:54:59 2019, Koji, Electronics, Loan / Lending, Borrowed LB1005 from Cryo Cav 
From Cryo Cav setup

Borrowed LB1005 Servo box -> OMC

 
Entry  Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019 image_ep30-2_epoxy_kit_pcs_item_1582_location_downs_3303.JPG
The following is the current status of the epoxies used in assembly of the OMC (excerpt from C1900052)

Re-purchasing efforts are underway and/or complete


DONE

Masterbond EP30-2 currently located in Downs 303, Modal Lab (see image)

( WILL EXPIRE JANUARY 2020
Entry  Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 omc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy_20191022.pngomc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy.pptx
This post captures the curing timeline followed by OMC PZT Assys #9 and #10.

Source file posted in case any updates or edits need to be made.
Entry  Tue Oct 22 10:25:01 2019, Stephen, General, General, OMC PZT Assy #9 and #10 Production Cure Bake  OMC_ABO_PZT_Curing_Bake_effort_201906_thru_201909.xlsproduction_cure_bake_pzt_assys_9_and_10_20190927.png
OMC PZT Assy Production Cure Bake (ref. OMC elog 381) for PZT Assy #9 and #10 started 27
September 2019 and completed 28 September 2019. Captured in the below figure (purple trace). Raw data has been posted as an attachment as well.

We have monitored the temperature in two ways:
Entry  Mon Sep 23 21:29:51 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) IMG_8933.jpgIMG_8934.jpg
[Stephen, Shruti, Koji]

We worked on the gluing of the PZT sub-assy (#9 and #10) along with the designed arrangement by Shruti (OMC
ELOG 374).
    Reply  Mon Sep 30 23:16:53 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) IMG_8950.jpegIMG_8953.jpegIMG_8954.jpegIMG_8955.jpeg
Friday: [Stephen, Koji]

As the oven setting has qualified, we brought the PZT assys in the air bake oven.

Monday: [Stephen, Shruti, Koji]
Entry  Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready! image_showing_20190924_abo_qualifying_bake.png
Follow up on OMC elog 379

I was able to obtain the following (dark blue) bake profile, which I believe is adequate for our needs.

The primary change was a remounting of the thermocouple to sandwich it between two stainless steel masses. The thermocouple bead previously was
Entry  Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding  image_showing_20190923_abo_qualifying_bake.png
The 40m Bake Lab's Dirty ABO's OMEGA PID controller was borrowed for another oven in the Bake Lab (sound familiar? OMC
elog 377), so I have had to play with the tuning and parameters to recover. This bake seemed to inadequately match the intended temperature profile
for some reason (intended profile is shown by plotting prior qualifying bake for comparison). 
Entry  Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding index.png
The 40m Bake Lab's Dirty ABO's OMEGA PID controller was borrowed for another oven in the Bake Lab, so I have had to play
with the tuning and parameters to recover a suitable bake profile. This bake is pictured below (please excuse the default excel formatting).
Entry  Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding IMG_5216.JPGIMG_5215.JPG
The following items are presently staged at the 40m Bake Lab (see photo indicating current location) (noting items broght by Koji as well):


Bonding fixtures, now modified with larger washers to constrain springs, and with modification from OMC
elog 358.
Curved Mirrors and Tombstones as selected by Shruti in OMC elog 374.
PZTs
Entry  Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status IMG_5217.JPG
Here is a summary of the events of the last week, as they relate to EP30-2.

1) I lost the EP30-2 syringes that had been ordered for the OMC, along with the rest of the kit.


Corrective action: Found in the 40m Bake Lab garbing area.
Preventative action: log material moves and locations in the OMC
Entry  Thu Sep 5 15:40:42 2019, shruti, Optics, Configuration, PZT Sub-Assembly Diagrams_SubAssembly.pdfC10_C13_Combinations.pdfPlots_Config_Tolerance.pdf
Aim: To find the combinations of mounting prism+PZT+curved mirror to build two PZT sub-assemblies that best minimises the total vertical beam
deviation.

(In short, attachment 1 shows the two chosen sets of components and the configuration according which they must be bonded
to minimize the total vertical angular deviation.)
Entry  Thu Jan 10 18:37:50 2013, Koji, Optics, Characterization, Wedging of the PZTs PZT_wedging.pdf
Yesterday I measured the thickness of the PZTs in order to get an idea how much the PZTs are wedged.
For each PZT, the thickness at six points along the ring was measured with a micrometer gauge. 
The orientation of the PZT was recognized by the wire direction and a black marking to indicate the polarity.
    Reply  Thu Aug 22 12:35:53 2019, Stephen, Optics, Characterization, Wedging of the debonded PZTs 2019 August IMG_4775.JPGIMG_4770.JPG
Wedge and thickness measurements of PZTs 12 and 13 took place after debonding and cleaning - results are shown in the first image (handwritten post-it
format).

These thickness measurements seem to have come back thinner than previous measurements. It is possible that I have removed some PZT material
       Reply  Thu Aug 29 11:51:49 2019, shruti, Optics, Characterization, Wedging of the debonded PZTs - Calculation PZT_Wedging_Results.pdfPZT_Wedging_Calc.pdf
Using the measurements of PZTs 12,13 taken by Stephen, I estimated the wedging angle and orientation following Section 2.3.1 of T1500060. The results
can be found in Attachment1 and is summarised as follows.

For PZT 12, PZT 13 respectively:
Entry  Fri Aug 23 11:11:44 2019, shruti, Optics, Characterization, Finding the curvature bottom CircleFit.pdfSineFit.pdf
I attempted to fit the data taken by Koji of the beam spot precession at the CCD in order to find the location of the curvature bottom in terms
of its distance (d) and angle () from the centre of the mirror. This was done using
the method described in a previous similar measurement  and Section 2.1.3 of 
Entry  Mon Jul 1 12:49:42 2019, Koji, Optics, Characterization, Scattering measurement of A and C mirrors omc_cm_tis_062419.pdfomc_prism_tis_062419.pdf
Liyuan's scattering measurement for the A and C mirrors.
Entry  Mon Jul 1 12:38:49 2019, Koji, Optics, Characterization, A and M prisms perpendicularity measurement 6x
[Stephen, Koji]

The perpendicularity of some of the A and M prisms were tested.

Results
Entry  Mon Jun 24 12:54:58 2019, Koji, Clean, General, HEPA BOOTH 
https://www.airscience.com/purair-flow-laminar-flow-cabinets
Entry  Tue May 28 12:14:20 2019, Stephen, Optics, General, CM PZT Assembly Debonding of EP30-2 in Acetone 8x
[LiyuanZ, StephenA]

Downs B119

Summary: Beginning on 20 May 2019, two CM PZT assemblies were soaked in Acetone in an effort to debond the EP30-2 bonds
Entry  Thu May 23 23:27:38 2019, Koji, Optics, Characterization, IGHQEX3000 high power test HQEPD_high_power_test.pdfpd_images.png
LaserComponents IGHQEX3000 (Cage B2: Serial# B1-23) was exposed to the beam with the optical power from 1.6mW to 332mW. 
After each illumination, the dark current and the dark noise level were measured. Also the photo image of the PD surface was taken each time.

- No significant change of the dark current after each illumination.
Entry  Thu May 23 01:42:46 2019, Koji, Optics, Characterization, C30665 high power test C30665_high_power_test.pdfpd_surface.jpg
An Excelitas C30665 PD with the cap removed (SN07 in Case H slot #2) was exposed to the beam with the optical power of 1.4mW to 334mW. 
After each illumination, the dark current and the dark noise level were tested. Also the photo image of the PD surface was taken each time.

- No significant change of the dark current after each illumination.
Entry  Mon May 20 19:53:17 2019, Koji, Optics, Configuration, DCPD high power test BIAS.pdfP_20190520_204822.jpg
We want to perform a damage test of OMC DCPDs with high power beam. The OMC DCPD is the 3mm InGaAs photodiodes with high quantum efficiency, delivered
by Laser Components.
The sites want to know the allowed input power during the OMC scan for beam mode analysis. The nominal bias voltage of the PDs is +12V. Therefore,
    Reply  Wed May 22 07:31:37 2019, Koji, Optics, Configuration, Camera test (DCPD high power test) 20190521201838_IMG_7939_2.jpg
C30665 (3mm) camera test. The camera was Canon PowerShot G7X MkII. Exposure 1/15s, F 5.6, ISO 125, MF (~the closest), no zoom.
This image was taken before the beam illumination. Will tune the green lighting to have some gradient on the surface so that we can see any deformation
of the surface.
Entry  Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table 
That is an expanding fire pillow, also known as firebrick.  It is used to create a fire block where holes in fire-rated walls are made and prevents
lab fires from spreading rapidly to adjacent labs.  I had to pull cable from B254 to our labs on either side during a rather narrow window of time. 
Some of the cable holes are partially blocked, making it difficult to reach the cable to them. The cable is then just guided to the hole from a distance. 
Entry  Wed May 15 19:07:53 2019, Koji, Clean, General, What is this??? P_20190515_185602.jpgP_20190515_185844.jpg
Suddenly something dirty emerged in the lab. What is this? It looks like an insulation foam or similar, but is quite degraded and emits a lot of particulates.

This does not belong to the lab. I don't see piping above this area which shows broken insulation or anything. All the pipes in the room
are painted white.
Entry  Thu May 9 18:10:24 2019, Koji, Optics, Characterization, OMC(004): Spot position scan / power budget 190508.pngscattering_spots_CM1.png
(Now the CCD image is captured as a movie and the screen capture is easier!)

Various spot positions on CM1 and CM2 were tried to test how the transmission is dependent on the spot positions. CM1 has a
few bright spots while CM2 shows very dark scattering most of the case. Attachment 1 is the example images of one of the best alignment
Entry  Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy T1500060_OMC_Optical_Testing_Procedure.pdf
Notes on the OMC cavity alignment strategy

- x3=1.17 γ + 1.40 δ, x4=1.40 γ + 1.17 δ
- This means that the effect of the two curved mirrors (i.e. gouy phases) are very similar. To move x3 and x4 in common is easy, but to do differentially
Entry  Thu May 9 16:07:18 2019, Stephen, Mechanics, General, Improvements to OMC Bonding Fixture image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG
[Stephen, Koji]

As mentioned in eLOG 331, either increased thermal cycling or apparent improvements
in cured EP30-2 strength led to fracture of curved mirrors at unintended locations of bonding to the PEEK fixture parts.
Entry  Wed May 1 15:40:46 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering misalignment.pdf
Tried a few things.

1. Replaced CM1 (PZT ASSY #10=M21+PZT#22+C12) with PZT ASSY #7 (=M1+PZT#13+C13)

We tried PZT ASSY #7 at the beginning and had the spots at almost at the top edge of the curved mirrors. As we found a particle on the bottom
    Reply  Fri May 3 11:06:28 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering misalignment.pdf
Experiment on 5/1
- CM1 right knob was moved 1div (10um) backward such that the spots were better centered on the mirrors 
FM1 (A5): h=-0.2mm -> 0.4mm made the spot much darker but still it has a few scattering spots.
Entry  Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow 
[koji, joe]

The template or glass breadboard was wobbling, and we noticed that the caivty alignment became worse/better when it was pressed down. We saw
that it was the glass breadboard, so it was fixed into the transport fixture more securely. Now its alignement didn't change when it was pressed down.
Entry  Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1 
[koji,philip,joe,liyuan,stephen]

need to add spot positions.

Mirrors: PZT11,PZT22, A14, A5
Entry  Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors FSR_detuned_locking.pdfCM1_IMG_7702.JPGCM2_IMG_7704.JPG
[Koji,Philip, Liyuan, Joe]

CM1:

We moved the curved mirrors to these positions:
Entry  Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR CM1_IMG_7699.jpgCM2_IMG_7697.jpg
[Koji,Joe,Philip,stephen]

in units 20um per div on the micrometer [n.b. we reailised that its 10um per div on the micrometer]

CM1 inner screw pos: 11.5
    Reply  Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd misalignment4.pdf
 
Entry  Sat Apr 20 00:50:12 2019, Koji, Optics, Characterization, OMC(004): Spot positions misalignment2.pdfmisalignment3.pdf
Similarly to OMC ELOG 349 the spot positions after the replacement of CM2 were measured
(Attachment 1)
Also, the spot positions after the realignment were measured. (Attachment 2)
Entry  Thu Apr 18 20:47:54 2019, Joe, Optics, , OMC initial alignment and locking IMG_7676.JPGIMG_7666.JPGIMG_7670.JPGIMG_7883.JPGIMG_7882.JPG
[Joe, Phillip, Koji, Stephen]

*draft post, please add anymore info if I missed something*


made initial alignment of the cavity. To do this we used the periscope mirrors to aim the incoming beam at the centre of the
    Reply  Fri Apr 19 11:34:19 2019, Koji, Optics, , OMC initial alignment and locking misalignment1.pdf
The spot on CM1 was found displaced by 3.4mm (horiz.) and 3.0mm (vert.) in the upper right direction looking from the face side.
The spot on CM2 was found displaced by 1.2mm (horiz.) and 1.8mm (vert.) in the upper left direction looking from the face side.

The drawing on the left side of the attachment shows the estimated misalignment when we think they all come from the curved
Entry  Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking FSR_Scan_Fitfsrdata.pdfIMG_7679_cropped.jpg
[koji,philip, joe, liyuan, steven]

*still need to add photos to post*

PZT 11 was removed and inspected for so dust/dirt on the bottom of the prism. We saw a spot. We tried to remove this with acetone,
Entry  Fri Apr 19 09:21:07 2019, Philip, Optics, , Cleaning of OMC optics IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG
ach[Joe, Phillip, Koji, Stephen]

Work from 17.04.2019

First contact cleaning of OMC optics
Entry  Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1 
[Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
Entry  Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG
[Stephen, Philip, Koji, Joe]

Breadboard D1200105 SN06 was selected as described in eLOG 338. This log describes
unwrapping and preparation of the breadboard.
Entry  Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs 
Apr 16, 2019
Borrowed two laser goggles from the 40m. (Returned Apr 29, 2019)
Borrowed small isopropanol glass bottole from CTN.
Entry  Mon Apr 15 21:11:49 2019, Philip, Optics, Characterization, OMC(004): PZT testing for spare OMC 
[Koji, Philip]

Today we tested the functionality of the four remaining PZTs (11,12,13 and 22) .  Each PZT was placed within a collimated 500um beam.
Roughly half of the beam was blocked by the PZT. The PZT and a PD then acted as shadow sensor. Each PZT was tested with 0 and
    Reply  Tue Apr 16 11:36:36 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC 9x
Attachment 1: Shadow sensor setup for the PZT displacement test

Attachment 2: PZT endurance test. 4 PZTs were shaken at once.

Attachment 3~5: Function generator setup 100Hz, 3.5Vpp 1.75Voffset (meant be displayed for 50Ohm load)
    Reply  Tue Apr 16 21:16:11 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC 
After having dug into the past email, it turned out that these wires were the ones already replaced from the original teflonwires. The length of them
were confirmed to be ~19" (480mm). 




Quote:


Entry  Tue Apr 16 17:24:56 2019, Koji, Optics, Configuration, OMC(004): E Mirror selection E_Mirror_selection.pdf
We are going to use E6, E9, E11, and E14 for BS1, SM1, SM2, and SM3. They (and E18) are all very similar.

The attachment is the excerpt from T1500060 with some highlighting
Entry  Tue Apr 16 16:52:36 2019, Koji, Optics, Configuration, OMC(004): B Mirror selection B_Mirror_selection.pdf
We are going to use B6 for the DCPD BS (BS2), and B1 for the QPD BS (BS3). Their role can not be swapped.

B6 has the best loss among the available ones, while the perpendicularity is not so critical due to the short arm.

B1 has the OK perpendicularity, while the loss is also moderately good.
Entry  Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection A_Mirror_selection.pdf
We are going to use A5 and A14 for FM1 and FM2. (The role of these two can be swapped)

The reason for the selection is the better perpendicularity among the available prisms.

A11 has the best perpendicularity among them. However, the T didn't match with the others. The pair of A5 and A14 has a good matching with
Entry  Tue Apr 16 16:35:09 2019, Koji, Optics, Configuration, OMC(004): Glass breadboard selection BB_selection.pdf
D1200105 SN006 was selected as the breadboard for OMC(004).
The reason is the best parallelism among the unused ones. 

The attached is the excerpt from T1500060 with the #006 highlighted.
Entry  Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection 
[Koji Stephen]

(Friday afternoon) We retrieved the PZT sub-assemblies to the clean room.

We started removing the ASSYs from the fixtures. We noticed that some part of the glass and PZT are ripped off from the ASSY and stuck with the
    Reply  Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) 6x
Sub-ASSY #7

Probably the best glued unit among the four.

Attachment #1: Mounting Block SN001
    Reply  Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) 8x
Sub-ASSY #8

Probably the best glued unit among the four.

Attachment #1: Mounting Block SN007
    Reply  Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) 7x
Sub-ASSY #9

The most fractured unit among four.

Attachment #1: Mounting Block SN017
    Reply  Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)  IMG_7589.jpgIMG_7590.jpgIMG_7591.jpgIMG_7592.jpg
Sub-ASSY #10

Attachment #1: Mounting Block SN021

Attachment #2: PZT-Mounting Block bonding looks just excellent.
Entry  Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking temp_profile.pdfbake.xlsx
[Stephen Koji]

The baking of the PZT subassemblies was more complicated than we initially thought.

The four PZT subassemblies were placed in the air bake oven A. We meant to bake the assemblies with the ramp time of 2.5h, a plateau of 2h at
Entry  Thu Apr 11 21:22:26 2019, Koji, Mechanics, General, OMC(004): PZT sub-assembly gluing IMG_7561.jpgIMG_7567.jpg
[Koji Stephen]

The four PZT sub-assemblies were glued in the gluing fixtures. There were two original gluing fixtures and two additional modified fixtures for
the in-situ bonding at the repair of OMC(002).
Entry  Thu Apr 11 12:15:31 2019, Koji, Mechanics, Configuration, PZT sub assy mirror orientations PZT_subassy.pngPZT_subassy.pdf
 
Entry  Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding  
Preparation for the PZT subassembly bonding (Section 6.2 and 7.3 of T1500060 (aLIGO OMC optical
testing procedure)
- Gluing fixture (Qty 4)
    Reply  Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding  



Quote:



Preparation for the PZT subassembly bonding (Section 6.2 and 7.3 of T1500060
(aLIGO OMC optical testing procedure)
Entry  Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed P_20190405_222401.jpgP_20190405_222509.jpgP_20190405_222529.jpg
OMC(002) repair completed

When the cable harness of OMC(004) is going to be assembled, the cable harness of OMC(002) will be replaced with the PEEK one. Otherwise, the
work has been done.
Entry  Fri Apr 5 20:50:54 2019, Koji, Optics, Characterization, OMC(002): QPD alignment P_20190405_215906.jpgP_20190405_215927.jpg
QPD#              QPD1       QPD2
Housing#          #004       #008
Diode#            #44        #46
Entry  Fri Apr 5 01:08:17 2019, Koji, Optics, Characterization, OMC(002): DCPD / QPD alignment IMG_7521.JPGIMG_7529.JPGIMG_7539.JPGIMG_7541.JPG
The beam height in the cavity became totally different from the previous one and the shims needed to be much thicker than before. This is probably because
of the alignment of the newly-glue curved mirror.

As the beam height is 2~2.5mm higher, two shims need to be stacked. The preliminary check of the heights using the alignment disks (dummy PDs)
Entry  Fri Apr 5 01:07:18 2019, Koji, Optics, Characterization, OMC(002): transmitted beam images CM1trasns.pngCM2trasns.pngFM2trans2.png
There was a concern that the transmission from CM1 has additional fringes. The shape of the transmitted beams from CM1, CM2, and FM2 (main) werecaptured
with WinCamD.
Indeed CM1 and CM2 have the fringes, but it does not exist in the main transmission. So it seems that the fringes are associated with the curved
Entry  Thu Apr 4 20:07:39 2019, Koji, Supply, General, Purchase 
== Office Depot ==
Really Useful Box 9L x 6 (delivered)
Really Useful Box 17L x 5 (ordered 4/4)
Entry  Thu Mar 28 16:36:52 2019, Koji, Mechanics, Characterization, OMC(002) PZT characterization  PZT_Scan.pdfOMC_PZT_Response.pdf
As performed in the ELOG 202, the PZTs of the OMC 002 were tested.

DC response was measured by sweeping each PZT with 0-150V triangular voltage at 11Hz. Acquire 0.2sec of the tie series using an oscilloscope
to get the PDH error, cavity transmission, and the sweep signal.
Entry  Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items 
OMC #002 Optical tests


FSR measurement (done, 2019/1/8-9, 2019/4/1)
TMS measurement
(done, 2019/1/9)
TMS measurement (with DC voltage on PZTs) (done, 2019/1/10)
Cleaning
Entry  Sat Feb 2 20:35:02 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (after mirror replacement)  OMC_HOM_190110.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT.pdf
OMC (002) after repair
History:Mirror replacement after the damage at H1. Measurement date 2019/1/10
Entry  Sat Feb 2 20:28:21 2019, Koji, Optics, Characterization, Summary: OMC(003) HOM structure recalculation OMC_HOM_140705.pdfHOM_PZTV_PZT1_0V.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf
OMC (003)
History: Measurement date 2014/7/5, Stored for I1, Installed to H1 2016/8 upon damage on 002
Entry  Sat Feb 2 20:03:19 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (before mirror replacement) OMC_HOM_131011.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf
OMC (002)
History: Measurement date 2013/10/11, Installed to L1 2013/XX
Entry  Sat Feb 2 16:17:13 2019, Koji, Optics, Characterization, Summary: OMC(001) HOM structure recalculation OMC_HOM_130531.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_HOM.pdf
Each peak of the transfer function measurement was fitted again with a complex function:

Entry  Fri Feb 1 12:52:12 2019, Koji, Mechanics, General, PZT deformation simulation pzt.png
A simple COMSOL simulation was run to see how the PZT deforms as the voltage applied.

Use the geometry of the ring PZT which is used in the OMCs -  NAC2124 (OD 15mm, ID 9mm, H 2mm)
The material is PZT-5H (https://bostonpiezooptics.com/ceramic-materials-pzt) which
Entry  Sat Jan 12 22:49:11 2019, Koji, Optics, Characterization, PM-SM patch cable mode cleaning effect fiber_mode_cleaning.pdf
Mode cleaning capability of an optical fiber was measured. The conclusion is that the
leakage of the non-fiber mode to the fiber output is insignificant and also practically negligible.

The tested fiber was Thorlabs 5-m Polarization Maintaining Single-Mode fiber (P3-1064PM-FC-5, PM Patch Cable, PANDA, 1064 nm, FC/APC, 5m).
Entry  Thu Jan 10 20:45:00 2019, Koji, Optics, Characterization, PZT test cable OMC_PZT_wiring.pdf
As OMC SN002 already has the PZTs connected to the Mighty-Mouse connector, a test cable with a female mighty-mouse connector was made.

A small imperfection: When the cable was inserted to the connector shell, I forgot to mirror the pin out. Therefore the color and pin number
do not match.
Entry  Thu Jan 10 20:42:54 2019, Koji, Optics, Characterization, FSR / HOM Test of OMC SN002 
OMC SN002 = Former LHO OMC which CM1 was destroyed by the lock loss pulse in 2016. This OMC needs to be optically tested before storage.

The test items:


[done] FSR measurement with offset PDH locking (FM->AM conversion)
[done] FSR/finesse
Entry  Sun Sep 23 19:42:21 2018, Koji, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror reflectivities.pngtransmission.pngphase_diff.pngphase_difference_histogram.png
[Koji Gautam]


With Gautam's help, I ran a coating design code for an HR mirror with the standard quarter-wave design. The design used
here has 17 pairs of lambda/4 layers of SiO2 and Ta2O5 (=34 layers) with the fused silica as the substrate to realize
    Reply  Thu Sep 27 20:19:15 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror 
I started some analytic calculations of how OMC mirror motion would add to the noise in the BHD. I want to make some prettier plots, and am adding the
interferometer so I can also compute the noise due to backscatter into the IFO. However, since I've pushed the notebook I wanted to post an update.
Here's
       Reply  Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror 
I'm still not satisfied/done with the solution to this, but this has gone too long without an update and anyway probably someone else will have a
direction to take it that prevents me spinning my wheels on solved or basic questions.

The story will have to wait to be on the elog, but I've put it in the jupyter notebook. Basically:
Entry  Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion 
0. If you have an RF signal whose waveform is , the amplitude is constant and 1.

1. If the waveform 
Entry  Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab 40mLabModIndexSetup.pdf
Attached is a block diagram of the test setup used in the 40m lab to measure the modulation index of the IO modulator
    Reply  Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab modulation_depth.pdfmodulation_depth_zoom.pdf
[Rich Koji]

The impedances of the new LLO EOM were measured with the beat note setup at the 40m PSL (as described in the previous ELOG entry.

At the target frequencies (9.1MHz, 24.1MHz, 45.5MHz, 118.3MHz), the modulation responses were (0.09, 2.9e-3, 0.053, 0.021) rad/V.
Entry  Tue Aug 7 15:43:12 2018, Koji, Electronics, Characterization, New LLO EOM stuffed P_20180806_154457.jpgimpedance_eom.pdfimpedance_eom_zoom.pdf
[Rich, Dean, Koji]

Stuffed all inductors for the new LLO EOM. As the impedances were sensitive to the positions of the inductors in the housing, they were glued
with a glue gun.
Entry  Thu Jul 26 20:57:07 2018, Koji, Electronics, Characterization, 9MHz port tuned impedance impedance_eom.pdfeom9.pdfeom_models_9MHz.pdf
[Rich Koji]

The 9MHz port was tuned and the impedance was measured.
Entry  Mon Jul 2 11:30:22 2018, Koji, Electronics, Characterization, 3IFO EOM impedance measurement impedance_eom.pdfEOM_Z_DATA.zip
[Rich Koji]

3IFO EOM (before any modification) was tested to measure the impedance of each port.

The impedance plot and the impedance data (triplets of freq, reZ, imZ) were attached to this entry.
    Reply  Wed Jul 4 18:30:51 2018, Koji, Electronics, Characterization, EOM circuit models eom_models.pdfeom9.pdfeom24.pdfeom45.pdf180704_3IFO_EOM_model.zip
The circuit models for the 3IFO EOM (before mods) were made using LISO.
Then the modification plan was made to make it a new LLO EOM.

Impedance data, LISO model, Mathematica files are zipped and attached at the end.
Entry  Tue Jul 3 12:07:47 2018, Rich Abbott, Electronics, Characterization, Notes on 3rd IFO EOM EOM_Analysis2.pdf
Attached please see my notes summarizing the models for the electrodes and inductors within the 3rd IFO EOM
Entry  Mon Jul 2 15:27:31 2018, Rich Abbott, Electronics, General, Work on EOM (3rd IFO unit) EOM3_aLIGO_3rdIfo.JPG
Koji, Rich

We took apart the unit removed from the 3rd IFO (Unit serial number aLIGO #3, XTAL 10252004) to see what makes it tick.  Koji has done a
fine job of adding the plots of the impedance data to this log book.  Attached are some details of the physical construction showing the capacitor
Entry  Mon Jul 2 12:29:01 2018, Koji, Electronics, Characterization, Impedances of individual components (3IFO EOM) impedance_coils.pdfimpedance_xtals.pdfq_coils.pdfcomponent_models.pdfliso_models.zip
[Rich Koji]

The impedances of the individual components from the 3IFO EOM (before modification) were tested.
Each component was modeled by LISO. The LISO model (in PDF and txt) are attached at the end of the entry.
Entry  Wed May 30 17:44:23 2018, Koji, Optics, Characterization, 3IFO EOM surface check IMG_5756.JPGIMG_5757.JPGIMG_5758.JPGIMG_5759.JPGLooking_at_Hole2.png
3IFO EOM dark microscope images courtesy by GariLynn and Rich

Attachment1/2: Hole #1
Attachment3/4: Hole #2
Entry  Wed May 30 16:40:38 2018, Koji, Mechanics, Characterization, EOM mount stability test 
https://awiki.ligo-wa.caltech.edu/wiki/EOM_Mount_Stability
Entry  Tue May 15 19:53:45 2018, Koji, Optics, General, EOM Q comparison 
Qs' were estimated with a lorentzian function (eye fit)



Current LHO EOM (final version, modulation depth measurement 2018/4/5)
Entry  Sat May 5 22:51:04 2018, Koji, Optics, General, 3IFO EOM Optical test 
The 3IFO EOM test performed at the 40m. Result: 40m ELOG 13819
Entry  Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven 9CE80545-7A58-4236-B7E3-1EE6C4042DAA.jpeg
I’ve borrowed the black and decker toaster oven to dry some sonicated parts. It is temporarly located in the QIL lab. 
Entry  Thu Feb 22 20:21:02 2018, Koji, Optics, Characterization, aLIGO EOM test 
POSTED to 40m ELOG
    Reply  Mon Apr 2 17:27:04 2018, Koji, Optics, Characterization, aLIGO EOM test 
2nd optical test http://nodus.ligo.caltech.edu:8080/40m/13725
Entry  Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December 
Norna Robertson, Stephen Appert ||  29 Nov 2017, 2 pm to 4 pm  ||  227 Downs, CIT

We made some preparations for modal testing, but did not have enough time to make measurements. Below is an after-the-fact log, including some
observations and photos of the current state of the OMC bench.
Entry  Mon Nov 27 20:24:24 2017, Koji, General, General, A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm 6x
Attachment 1: The PD was removed from the transmission side of the OMC #002 (former LHO OMC - the one blasted by the optical pulse in
Aug 2016).
It was confirmed that the PD has the scribing mark saying "A".
Entry  Fri Sep 8 15:14:05 2017, Koji, Facility, General, Preparation for the plumbing work 7x
[Steve, Aaron, Koji]

We've finished the preparation for the forthcoming plumbing work on (nominally) Sept 16th Saturday.
We've covered most of the west side of the OMC lab with plastic sheets and wraps.
Entry  Tue Mar 28 21:04:27 2017, Koji, Electronics, Characterization, PDH amp 6x
Attachment 1: PDH amp RF part (before the preamp was installed)

Attachment 2: RF-AF transmission

Attachment 3: Attachment 3: LO dependence
    Reply  Sat Jul 29 18:44:38 2017, rana, Electronics, Characterization, PDH amp 
attachment 6: DCPD preamp looks like the opamp is wired for positive feedback?
       Reply  Sat Jul 29 21:42:51 2017, Koji, Electronics, Characterization, PDH amp 
The polarities indicated in the right circuits were opposite, obviously.
Entry  Wed Jul 5 16:59:44 2017, Koji, General, General, The OMC #002 was packed DSC_0360.JPG
[Stephen Koji]

The OMC #002 was packed for the transportation to Downs.

===> And transported to Downs 227 on Jul 6th.
Entry  Sat Jul 1 21:33:18 2017, Koji, General, General, Some purchase notes 
- Forgot to close the cylinder valve...

v HEPA prefilter (20"x20"x1" MERV 7)

- Replace the filter for the air conditioning
Entry  Sat Jul 1 15:29:57 2017, Koji, Optics, General, Black glass cleaning / Final bonding for the emergency repair for OMC #002 DSC_0347.jpgDSC_0348.jpgDSC_0350.jpgDSC_0352.jpgDSC_0354.jpg
[Alena, Koji] 

Report of the work on June 30.

1. Cleaning of the black glass beam dumps
Entry  Fri Jun 23 10:55:07 2017, Koji, Optics, General, Dust layer on black glass beam dumps? black_glass_dust.JPG
I wondered why the black glass beam dumps looked not as shiny as before. It was in fact a layer of dusts (or contaminants) accumulated on the surface.
The top part of the internal surface of the black glass was touched by a piece of lens tissue with IPA. The outer surface was already cleaned. IPA
did not work well i.e. Required multiple times of wiping. I tried FirstContact on one of the outer surface and it efficiently worked. So I think the internal
Entry  Fri Jun 23 01:58:11 2017, Koji, Optics, General, OMC #002 Repair - CM1 gluing 6x
[Alena, Koji]

Jun 21: Alena and Koji worked on gluing of the CM1 mirror on the OMC breadboard #002. This
is an irregular procedure. Usually, the PZT mirror subassembly is prepared before the mounting prism is glued on the breadboard. In this
Entry  Fri May 26 21:53:20 2017, Koji, General, Configuration, Trans RF PD setup 
Recent work

- DC output of the trans RF PD was connected to the BNC patch panel. => Now CH4 of the scope is monitoring this signal

- The RF sweep signal from the network analyzer is connected to the power combiner for the EOM drive via the SMA patch panel.
    Reply  Tue Jun 6 00:49:48 2017, Koji, General, Configuration, Trans RF PD setup 
Last week, I further worked on the RF system to install 20dB coupler on the agilent unit and setup the R channel. This allowed me to make the FSR/TMS
measurement of the OMC.

And today several optical improvement has been done.
       Reply  Tue Jun 6 22:00:36 2017, Koji, General, Configuration, Trans RF PD setup 
- Replaced the PZT with the one used from the beginning. This must be PZT #21. After the replacement, the spot positions look very good. I even went
up. So I decided this is the configuration to proceed to the gluing. The CM1 mirror has the HR arrow at the top.

- The input beam was realigned w.r.t. the OMC.
Entry  Tue May 16 19:05:18 2017, Koji, Optics, Configuration, OMC SN002 fix - temporary optics 
Working on the SN002 OMC fix. Checked the inventory. I think I am using C8 mirror as the new temporary CM1 and PZT24 as the new temporary CM2.
Entry  Thu Jan 19 20:57:53 2017, Koji, Supply, General, Purchase 
Ordered:

Office Depot
v AA battery Qty. 24
    Reply  Thu Feb 16 17:23:12 2017, Koji, Supply, General, Purchase 

BNC Patch Panel

8x Amphenol Connex 112443 / Isolated BNC FEMALE TO FEMALE BULKHEAD ISOLATED ADAPTER - 50 ohm

http://www.newark.com/amphenol-rf/112443/bulkhead-adapter-bnc-jack-bnc/dp/99H4399
Hole
Diameter: 13mm (0.512") D width 12.10mm (0.477")


4x Amphenol RF 31-4803-75 (75Ohm)

http://www.newark.com/amphenol-rf/31-4803-75/bulkhead-adapter-bnc-jack-bnc/dp/50B8959
same
Entry  Wed Dec 7 21:18:35 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned DSC_0082.jpgDSC_0084.jpg
The OMC mode matching sled was fixed on the nominal part of the table. Then the OMC was located at the nominal position marked by three poles.

The input periscope was adjusted to have the input beam roughtly centered on the OMC QPDs. This made the beam from FM2 aligned to the missing
CM1, and the beam just went through the hole of the mounting prism. Very promising!
    Reply  Thu Dec 8 21:17:09 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned 
The OMC cavity was locked. The alignment was precisely adjusted. The mode matching was optimized by the lens positions. The reflection during the lock
is ~0.01 compared to the full reflection on non-resonance, meaning the mode matching is ~99%. The error signal was maximized (i.e. demod pahse was adjusted)
by sweeping the modulation frequency. Note that the EOM is broad band. The modulation freq chosen today was 34.6MHz.
Entry  Mon Nov 21 21:19:20 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling 
- About 1.5 month ago, an 700mW LWE NPRO has been brought to OMC Lab.

- The SOP can be found here.

- The base was made for the beam elevation of 3" height. Four 1" pedestals were attached to rise the beam elevation to 4".
    Reply  Wed Dec 7 19:18:10 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling 
FIber Input Mount 132deg
Fiber output mount 275deg
-> 525mW P: 517mW S: 8mW extinction ratio: 0.016
Entry  Fri Sep 9 19:43:32 2016, Koji, Optics, General, D1102211 OMC Diode Mount Glass Block went to Downs 
D1102211 OMC Diode Mount Glass Block (11pcs) have been given to Calum@Downs
Entry  Tue Aug 23 23:36:54 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC) 7x
1. Calum and GariLynn checking the CM1 defect from the front side.
2. Same as above
3. Close up of the defect
    Reply  Thu Aug 25 02:17:09 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC) 
Initial inspection results by Calum, et al.
https://dcc.ligo.org/LIGO-E1600268
Entry  Mon Aug 22 12:58:16 2016, Koji, General, General, UV bond samples -> Garilynn 
- FS base + Mounting Prism

- FS or SF2 1/2" piece + FS or SF2 1/2" piece

- FS? plate + FS or SF2 1/2" piece + FS or SF2 1/2" piece + FS? plate
Entry  Mon Aug 15 10:09:10 2016, Koji, General, General, Prev H1 OMC shipped to CIT 
Previous H1 OMC shipped from LHO to CIT

https://ics-redux.ligo-la.caltech.edu/JIRA/browse/Shipment-8196
Entry  Fri Aug 12 14:58:17 2016, Koji, General, Configuration, H1 OMC DCPD replacement  
Preparation of 3rd OMC for the use in H1

New DCPD(T) = B1-01
DCPD(T) = DCPDA: extracted and accomodated in CAGE-A SLOT1
Entry  Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory 
As of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016
Entry  Fri Jun 10 17:12:57 2016, Koji, General, Configuration, L1 OMC DCPD replacement 
New DCPD(T) = A1-23
DCPD(T) = DCPDB: extracted and accomodated in CAGE-G SLOT1

New DCPD(R) = A1-25
Entry  Sat Mar 26 17:39:50 2016, Koji, Electronics, Characterization, HQEPD dark noise PD_dark_current.pdf
Dark noise measurement for 6 HQEPDs and 1 C30665. All of these showed sufficiently low dark current noise levels compared with the noise level of the
DCPD preamp. The measurement was limited by the input noise (ADC) noise of the FFT analyzer as the line noises were too big.

The measurement has been done with the transimpedance of 1e7. The bandwidth of the measurement was 50kHz.
    Reply  Sat Mar 26 18:22:24 2016, Koji, Electronics, Characterization, Baking / Contamination tests of the PDs 
For the production of the aLIGO PDs, the following transfer of the PDs were carried out
A1-23 Cage A1 -> G1
A1-25 Cage A2 -> G2
       Reply  Tue Apr 5 18:22:40 2016, Koji, Electronics, Characterization, Baking / Contamination tests of the PDs QE_after_air_bake.pdf
Possible reduction of the QE was observed after air-bake at 75degC.


Yesterday I received Cage G from Bob for intermediate test of the PD performance after air bake but before vacuum bake.
This cage was prepared to be the production pair.
          Reply  Tue Apr 5 21:20:15 2016, Koji, Electronics, Characterization, More dark noise measurement PD_dark_current.pdf
All survived PDs have been measured.
Entry  Tue Apr 5 18:14:55 2016, Koji, General, Loan / Lending, QPD Lending Crackle 
Xiaoyue

QPD head
X-Z stage
Entry  Sat Mar 26 01:49:48 2016, Koji, Optics, Characterization, HQEPD QE QE1.pngQE2.png
Calibration of the transimpedance

Use KEITHLEY 2450 as a calibrated current source. Model 2450 has the current source accuracy of 0.020%+1.5uA at 10mA range. For 6mA current output,
the error is 3uA (0.05%).
Entry  Sun Mar 13 22:02:09 2016, Koji, Optics, Characterization, HQEPD QE measurement (direct comaprison) 
Direct comparison of the PD responsibities

We can expect 5% increase of the QE with the new PD. 


P-pol 10deg incident
Entry  Sat Feb 20 19:11:22 2016, Koji, Electronics, Characterization, Dark current measurement of the HQE PD and other PDs P2197992.jpgPD_dark_current.pdfPD_dark_current_others.pdf
Dark current of the HQE PD and other PDs were measured.

- The HQE PDs were loaded on the new PD transportation cages (Attachment 1)
The PDs are always shorted by a clean PD plugs. The PD element is still capped with Kapton seals.
    Reply  Sun Mar 13 21:22:27 2016, Koji, Electronics, Characterization, Dark current measurement of the HQE PD and other PDs 
Transfered for RGA scan

B4 (C1-05) -> F1
C1 (C1-07) -> F2
Entry  Sun Mar 6 02:13:28 2016, Koji, Optics, Characterization, PD glass reflections P3048124.JPGP3048125.JPG
On friday, I removed a glass cover of a G30655 with a PD can cutter.

When a beam shoots a Perkin Elmer/Excelitas PD, we usually observe three reflections.
We always wonder what these are.
Entry  Thu Feb 18 21:08:32 2016, Koji, General, Loan / Lending, (all returned) Antonio loan 
Antonio borrowed: Rich's PD cutter (returned), Ohir power meter(returned), Thorlabs power meter head, Chopper
Entry  Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate 
The Glasgow polarizer was passed to Kate on Dec 17, 2015.
Entry  Fri Dec 18 15:33:24 2015, Koji, General, Loan / Lending, Loan from Rich 
Loan Record: I borrowed a PD can opener from Rich => Antonio Returned Sep 9, 2016

Tungsten Carbide Engraver (permanently given to the OMC lab)

KEITHLEY SOURCE METER + Laptop
Entry  Tue Dec 15 13:42:37 2015, Koji, Optics, Characterization, Dimensions / packaging of HQE PDs PC147842.jpgPC147846.jpgPC147848.jpgHQEPD_dimension.pdf
The dimensions of a high QE PDs was measured as well as the ones for C30665. (Attachment 4, Unit in mm)
They seemed to be very much compatible.


The PDs came with the designated case (Attachment 1). The bottom of the case has a spongy (presumably
Entry  Tue Dec 15 13:39:13 2015, Koji, Electronics, Characterization, Phase noise measurement of aLIGO EOM drivers phase_noise.pdfphase_noise_9MHz.pdf
This measurement has been done on Dec 1st, 2015.


The phase noise added by the EOM driver was tested.

The test setup is depicted in the attached PDF. The phase of the RF detector was set so that the output is close to zero crossing as much as
Entry  Tue Dec 15 13:38:34 2015, Koji, Electronics, Characterization, EOM Driver linearity check Output_linearity.pdfCtrl_Bias.pdf
Linearity of the EOM driver was tested. This test has been done on Nov 10, 2015.

- Attachment 1: Output power vs requested power. The output start to deviate from the request above 22dBm request.

- Attachment 2: Ctrl and Bias voltages vs requested power. This bias was measured with the out-of-loop channel.
Entry  Tue Sep 8 11:18:10 2015, Koji, Optics, Characterization, PBS Transmission measurement setup.JPGCaF2Prism.jpgCaF2Prism2.JPG
Motivation: Characterize the loss of the Calcite Brewster PBS.

Setup: (Attachment 1)

- The beam polarization is rotated by an HWP
    Reply  Wed Sep 9 01:58:34 2015, Koji, Optics, Characterization, PBS Transmission measurement 
Calcite Brewster PBS Continued

The transmission loss of the Calcite brewster PBS (eLIGO squeezer OFI) was measured with different conditions.
The measured loss was 3600+/-200ppm. (i.e. 900+/-50 ppm per surface)
       Reply  Thu Sep 10 04:03:42 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary) eLIGO_PBS.pdfHWP.pdfTFP.pdfGlasgow_PBS.pdf
Brewster calcite PBS (eLIGO Squeezer OFI)

Loss L = 3600 +/- 200ppm
Angular dependence: Attachment 1
          Reply  Wed Sep 23 17:49:50 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary) Glasgow_PBS_spotsize.pdf
For the Glasgow PBS, the measurement has been repeated with different size of beams.
In each case, the PBS crystal was located at around the waist of the beam.
Otherwise, the measurement has been done with the same way as the previous entries.
Entry  Mon Aug 10 02:11:47 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 IMG_20150803_223403975.jpgIMG_20150803_221210816_HDR.jpgIMG_20150803_223420267.jpg
This is an entry for the work on Aug 3rd.

LIGO DCC E1500151

Power supply check
    Reply  Mon Aug 10 11:39:40 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 
Entry for Aug 6th, 2015

I faced with difficulties to operate the RF AM detectors.

I tried to operate the RF AM detector. In short I could not as I could not remove the saturation of the MON outputs, no matter how jiggle the
       Reply  Mon Aug 10 11:57:17 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 screen_shot.png
Spending some days to figure out how to program CPLD (Xilinx CoolRunner II XC2C384).

I learned that the JTAG cable which Daniel sent to me (Altium JTAG USB adapter) was not compatible with Xilinx ISE's iMPACT.

I need to use Altium to program the CPLD. However I'm stuck there. Altium recognizes the JTAG cable but does not see CPLD. (Attachment 1)
          Reply  Mon Aug 10 12:09:49 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 IMG_20150809_215628585_HDR.jpg
Still suffering from a power supply issue!

I have been tracking the issues I'm having with the RF AM detector board.

I found that the -5V test point did not show -5V but ~+5V! It seemed that this pin was not connected to
             Reply  Fri Aug 28 01:08:14 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 ~ Calibration RFAM_detector_calib.pdfRFAM_detector_calib_spectra.pdf
Worked on the calibration of the RF AM Measurement Unit. 

The calibration concept is as follows:


Generate AM modulated RF output
Measure sideband amplitude using a network anayzer (HP4395A). This gives us the SSB
                Reply  Fri Aug 28 02:14:53 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 ~ 37MHz OCXO AM measurement OCXO_AM_noise.pdf
In order to check the noise level of the RFAM detector, the power and cross spectra for the same signal source
were simultaneously measured with the two RFAM detectors.


As a signal source, 37MHz OCXO using a wenzel oscillator was used. The output from the signal source
                   Reply  Tue Sep 8 10:55:31 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 ~ 37MHz OCXO AM measurement 
Test sheet: https://dcc.ligo.org/LIGO-E1400445

Test Result (S1500114): https://dcc.ligo.org/S1500114
Entry  Sun Sep 6 16:50:51 2015, Koji, Electronics, General, Unit test of the EOM/AOM Driver S1500118 P9037810.JPGRF_AM_spectra.pdf
TEST Result: S1500118

Additional notes

- Checked the power supply. All voltages look quiet and stationary.
Entry  Thu Aug 20 01:35:01 2015, Koji, Electronics, General, OMC DCPD in-vacuum electronics chain test OMC_DCPD_Chain.pdfOMC_DCPD_Transimpedance.pdf
We wanted to know the  transimpedance of the OMC DCPD at high frequency (1M~10M).
For this purpose, the OMC DCPD chain was built at the 40m. The measurement setup is shown in Attachment 1.

- As the preamp box has the differential output (pin1 and pin6 of the last DB9), pomona clips were used to measure the transfer functions
    Reply  Wed Aug 26 11:31:33 2015, Koji, Electronics, General, OMC DCPD in-vacuum electronics chain test OMC_DCPD_OutputNoise.pdf
The noise levels of the output pins (pin1/pin6) are measured. Note that the measurement is done with SE. i.e. There was no common mode noise rejection.
Entry  Wed Jul 15 22:23:17 2015, Koji, Electronics, AM Stabilized EOM Driver, E1400445 first look IMG_20150714_195534852.jpgIMG_20150714_195227746_HDR.jpg
This is not an OMC related and even not happening in the OMC lab (happening at the 40m), but I needed somewhere to elog...


E1400445 first look

LIGO
DCC E1400445
    Reply  Sat Jul 18 11:37:21 2015, Koji, Electronics, AM Stabilized EOM Driver, D0900848 power board ~ oscillation issue solved 6x
Power Supply Board D0900848 was oscillating. Here is the procedure how the issue was fixed.

PCB schematic: LIGO DCC D0900848

0. Extracting the power board.
       Reply  Wed Jul 22 09:43:01 2015, Koji, Electronics, AM Stabilized EOM Driver, Power supply test of the EOM/AOM Driver 
Serial Number of the unit: S1500117
Tester: Koji Arai
Test Date: Jul 22, 2015 
          Reply  Wed Jul 22 10:15:14 2015, Koji, Electronics, AM Stabilized EOM Driver, RF test of the EOM/AOM Driver S1500117 
7) Make sure the on/off RF button works,
=> OK

8) Make sure the power output doesn't oscillate,
             Reply  Sat Jul 25 17:24:11 2015, Koji, Electronics, AM Stabilized EOM Driver, RF test of the EOM/AOM Driver S1500117 7x
(Calibration for Attachment 5 corrected Aug 27, 2015)


Now the test procedure fo the unit is written in the document https://dcc.ligo.org/LIGO-T1500404

And the test result of the first unit (S1500117) has also been uploaded to DCC https://dcc.ligo.org/LIGO-S1500117
                Reply  Tue Jul 28 18:36:50 2015, Koji, Electronics, AM Stabilized EOM Driver, RF test of the EOM/AOM Driver S1500117 IMG_20150727_214536773_HDR.jpgEOM_Driver_DAQ_TF_test.pdfEOM_Driver_Mon_PSD.pdf
Final Test Result of S1500117: https://dcc.ligo.org/LIGO-S1500117


After some staring the schematic and checking some TFs, I found that the DAQ channels for MON2 have a mistake in the circuit.
Differential driver U14 and U15 of D0900848 are intended to have the gain of +10 and -10 for the pos and neg outputs.
Entry  Wed Feb 18 21:51:23 2015, Koji, General, General, Notes on OMC Transportation Fixtures & Pelican 
LLO has one empty OMC transportation fixture.

LHO has one empty OMC transportation fixture.

LHO has one OMC transportation fixture with 3IFO OMC in it.
Entry  Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed 
Jan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables were installed (Helicoils inserted)
PD7&10 swapped with PD11(for DCPD T) and PD12(DCPD R).
Entry  Mon Jul 21 01:02:43 2014, Koji, Mechanics, Characterization, Some structual mode analysis 6x
Prisms
Fundamental: 12.3kHz Secondary: 16.9kHz
    Reply  Tue Sep 9 20:59:19 2014, Koji, Mechanics, Characterization, Structural mode analysis for the PZT mirror 6x
Structural analysis of the PZT mirror with COMSOL.
Inline figures: Eigenmodes which involves large motion of the tombstone. In deed 10kHz mode is not the resonance of the PZT-mirror joint,
but the resonance of the tombstone.
Entry  Wed Aug 27 23:13:13 2014, Koji, Optics, Characterization, Collection of the power budgetting info 
L1 OMC Cavity power budget
H1 OMC Cavity power budget
3IFO OMC Cavity power budget
Entry  Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components 
DCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282
PD faster: 92210A07 Qty 4: MCMASTER #2-56 x .25 FHCS
Entry  Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom 
On breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808
Entry  Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO  
The 3rd (LIO) OMC was shipped out to LHO on Friday (Jul 18) Morning.
At LHO
- All of the on-breadboard cables should be attached and tied down.
Entry  Thu Jul 17 02:19:20 2014, Koji, Mechanics, Characterization, I1OMC vibration test 6x
Summary
- The breadboard has a resonance at 1.2kHz. The resonant freq may be chagned depending on the additional mass and the boundary condition.
- There is no forest of resonances at around 1kHz. A couple of resonances It mainly starts at 5kHz.
    Reply  Sun Jul 20 17:19:50 2014, Koji, Mechanics, Characterization, I1OMC vibration test ~ 2nd round 9x
Improved vibration measurement of the OMC
Improvement
- Added some vibration isolation. Four 1/2" rubber legs were added between the OMC bread board and the transport fixture (via Al foils).
Entry  Sun Jul 13 17:46:28 2014, Koji, Optics, Characterization, OMC backscatter measurement OMC_backscatter.pdf
Backscattering reflectivity of the 3rdOMC was measured.

Attached: Measurement setup
1) A CVI 45P 50:50 BS was inserted in the input beam path. This BS was tilted from the nominal 45 deg so that the reflection of the input beam
    Reply  Tue Jul 15 03:00:42 2014, Koji, Optics, Characterization, OMC backscatter measurement 
Presence of the misaligned SRM (T=20%) was forgotten in the previous entry.
This effectively reduces the OMC reflectivity by factor of 25.
This is now reflected in the original entry. Also the argument about the power spectram density was modified.
       Reply  Tue Jul 15 03:34:16 2014, Koji, Optics, Characterization, OMC backscatter measurement OMC_backscatter.pdfOMC_backscatter.png
Backscatter measurement ~ 2nd round


Summary

- The backscatter reflectivity of the 3rd OMC is 0.71 ppm
Entry  Fri Jul 11 00:06:33 2014, Koji, Optics, Characterization, I1OMC PD 
DCPD#             DCPD1      DCPD2
Housing#          #009       #010
Diode#            #07        #10
Entry  Thu Jul 10 23:22:28 2014, Koji, Optics, Characterization, I1OMC QPD 
QPD#              QPD1       QPD2
Housing#          #006       #007
Diode#            #50        #51
Entry  Mon Jul 7 01:36:03 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
    PZT AC response
    Reply  Thu Jul 10 08:34:57 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
   
Entry  Thu Jul 10 01:39:38 2014, Koji, Electronics, General, PZT wire P7096669.JPG
Rich came to the OMC lab. Pins for the mighty mouse connector were crimped on the 4 PZT wires.
We found the male 4pin mighty mouse connector in the C&B area.
The cable inventory was checked with ICS/DCC combo. It turned out that most of the on-board cables
Entry  Tue Jul 8 18:54:54 2014, Koji, Mechanics, Characterization, PZT characterization PZT_Scan.pdfI1OMC_PZT_Response.pdf
Each PZT was swept with 0-150V 11Hz triangular wave.
Time series data for 0.2sec was recorded for each PZT.
The swept voltage at the resonances were extracted and the fringe number was counted.
Entry  Wed Jul 2 18:58:42 2014, Koji, General, General, Beam dump delamination beamdump_delamination.png
While the OMC breadboard was being inspected, it was found that two out of five black-glass beam dumps showed sign of delamination.
(attached photos).
The base of the each beam dump is a fused silica disk (25mm dia.). The black glass pieces are bonded to the disk. The bond is EP30-2 
    Reply  Thu Jul 3 17:45:18 2014, Koji, General, General, Beam dump delamination beamdump_delamination_solution.png
Here is the resolution.
I'll apply fillets of EP30-2 along the edges of the black glass (See figure). 
In order to allow the air escape from the gap, the inside of the V will not be painted. 
       Reply  Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps 
Firstly, the excess epoxy was removed using a cleaned razor balde
Entry  Sun Jul 6 03:56:40 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf
Cavity FSR/TMS measurement (2014/7/5) with PZT voltages swept from 0V to 200V (50V step)
    Reply  Sun Jul 6 08:31:14 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept HOM_plot.pdf
3rd OMC, HOM diagram at PZT1=0V and PZT2=50V.
First coincidence with the carrier is the 32nd-order carrier mode. Very good.
Entry  Sun Jul 6 02:46:20 2014, Koji, Optics, Characterization, OMC power budget 
3rd OMC power budget (2014/7/2)
Input power: 34.8mW
Entry  Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement finesse_measurements_log.pdf
3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a HWP.
Entry  Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly 
For baking:

    Assembly Name aLIGO Output Mode Cleaner
    Assembly Number D1201439
    Reply  Fri Jun 27 12:29:50 2014, Koji, General, General, OMC baking P6266536.jpg
The OMC went into the oven at around 2PM on Thursday. It will be baked at 80degC for 48 hours.
The RGA result will be obtained on Monday.
Link to the ICS entry
       Reply  Wed Jul 2 16:41:43 2014, Koji, General, General, OMC baking 
OMC is back from the oven today.
To Do:
Optical tests
Entry  Fri Jun 27 18:51:33 2014, Koji, General, General, Supply 
PTOUCH TAPE (12mm white) x 2
9V batteries
Entry  Thu Jun 19 23:16:50 2014, Koji, Optics, General, All of the prisms have been glued P6196525.JPG
- All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been glued

TODO
    Reply  Fri Jun 20 18:59:12 2014, Koji, Optics, General, All of the invar blocks have been glued 
All of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed.
       Reply  Mon Jun 23 21:54:16 2014, Koji, Optics, General, All of the gluing completed 
The bottom-side templates were removed.
The last beam dump was removed
TODO
Entry  Sat May 17 07:40:14 2014, Koji, Optics, Characterization, I1OMC cavity mirrors glued Cav_scan_response_140516_Pitch.pdfCav_scan_response_140516_Yaw.pdf
I1OMC cavity mirrors were glued.
FSR = 264.82MHz => Lcav = 1.132m (nominal 1.132m)
TMS/FSR for Vpzt1=Vpzt2=0: 0.2185 (V) and 0.2196 (H) (nominal 0.219)
Entry  Fri May 16 00:13:36 2014, Koji, Optics, Characterization, Cavity mirror gluing part 1 
BS1/FM1/FM2 for I1OMC were glued.
FM1 had to be intentionally rotated.
FM1 had to be intentionally shifted to avoid scattering spot.
Entry  Wed May 14 02:15:15 2014, Koji, Optics, Characterization, FSR/TSM adjustment of the OMC cavity  Cav_scan_response_140503_Pitch.pdfCav_scan_response_140503_Yaw.pdf
1. FSR was adjusted and measured with "the golden arches" technique again.
FSR = 264.8412 MHz +/- 1400Hz => Lcav = 1.13197 m. (nominal 1.132m)
2. Transverse mode spacings for the vertical and horizontal modes were measured.
Entry  Mon May 12 22:43:02 2014, Koji, Optics, Characterization, Measured FSR/TSM of the OMC cavity Cav_scan_response_Pitch.pdfCav_scan_response_Yaw.pdf
Data analysis of the FSR/TSM measruement last week.
1. FSR was measured with "the golden arches" technique.
FSR = 263.0686 MHz +/- 900Hz
Entry  Thu Apr 17 21:39:25 2014, Koji, Optics, General, More alignment 
STORY:
- The cavity mirrors have scattering spots. The cavity alignment should have been scanned to find a cavity mode to have lowest loss possible. 
  BTW, We only have horizontal dof for the alignment scan.
Entry  Tue Mar 25 17:10:10 2014, Koji, Optics, Characterization, OMC spot position estimation OMC_spot.pdf
Spot positions were inferred from the photos
Entry  Mon Mar 3 02:46:21 2014, Koji, General, Characterization, Spot positions scanned 
Spot positions on CM1 and CM2 scanned according to the recipes provided by the previous entry.
The best result obtained was:
Transmission from FM2: 32.7mW
Entry  Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC misalignment.pdf
Relationship between mirror misalignment and cavity mode shift was calculated.
The technique described in T0900647 by Sam Waldman was used.
The angles and displacement of the mirrors and beams are defined in the attached figure.
Entry  Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos 
LHO OMC installation photos
Entry  Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy 
Masks / Wipes => done
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Checked the PZT arrangement: Mighty Mouse Pin1&2 -> PZT2 (DCPD side), Mighty Mouse Pin3&4 -> PZT1 (QPD side)
DCPD response: 
Illuminate DCPD1 (T) -> DCPD B responded in MEDM
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
H1OMC PZT connector was replaced with the correct one. This was the final step for H1OMC.
Jeff and I packed the OMC and put it in the perikan case. It will be shipped tomorrow.
The other tools are also packed in the other box. Here is the list of the items
Entry  Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment 
DCPD2 got misaligned during the cable installation. The PD alignment procedure have been gone through again.
Cavity locking 
- Removed the FC layers for the cavity related mirrors.
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
[Chub, Jeff, Koji]
We worked on the wiring and routing of the cables.
- The cables for the PZT was installed first. 
Entry  Tue Oct 15 18:50:08 2013, Koji, Optics, Characterization, QPD alignment 
1) Deburr the bottom surfaces of the QPD housings
2) Aligned the QPDs
 
    Reply  Wed Oct 16 19:16:29 2013, Koji, Optics, Characterization, PD alignment 
 
 shim 1.5mm 001/002
Entry  Mon Oct 14 15:50:55 2013, Koji, Optics, Characterization, H1 OMC Power budget OMC_power_budget.pdf
LHO OMC power budget

    
        
            Date

           2013/9/17
            2013/9/17
            2013/10/16
Entry  Mon Oct 14 13:40:16 2013, Koji, Optics, Characterization, H1 OMC Optical testing 
Since the middle of September, the optical tests of H1 OMC were took place.
Here is summary of the progress.
TEST1: FSR/FINESSE measurement before applying First Contact 
Entry  Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping P9064377.JPG
[Koji Jeff]
In order to prepare for the splinkler installation on the HEPA enclosure, the table with the optics was wrapped with Ameristat sheets.
    Reply  Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done P9134379.jpgP9134378.jpg
A sprinkler head was installed on the HEPA enclosure. The head is covered with a plastic cap.
Entry  Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab. 
[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven (Oven F) and running without the actual OMC.
Entry  Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed 
[Koji Jeff]
H1 OMC All Gluing completed
5 Glue H1 beam dumps (UV)
Entry  Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing P8304368.JPGP8304370.JPG
The Invar Mounting Blocks were glued on the breadboard.
Serial number #1/2/5/6/7/8 -> I1 OMC cable side
Serial number #9/10/11/12 -> H1 OMC cavity side
Entry  Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions DCPD1.pngDCPD2.pngQPD1.pngQPD2.png
Beam heights on the diodes

DCPD1: 14.459mm -> With 1.5mm shim, the beam will be 0.038mm too low.
Entry  Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing 
H1 OMC Cavity side optics was glued on the breadboard
Curved mirror gluing
- Applied the UV glues to CM1/CM2 prisms.
Entry  Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment Gouy_FSR_130827.nb.zipP8284343.jpg
Short conclusion: 
The roundtrip cavity length for the H1 OMC was adjusted to be 1.145m 
instead of 1.132m such that the 19th HOMs of the lower sideband do not get resonant together with the carrier.
Entry  Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV) 
The glass components for the I1 OMC top side were glued by the UV glue.
Breadboard SN#4
Wire bracket SN#5/6/7/8
Entry  Thu Aug 29 02:52:50 2013, Koji, Optics, Characterization, H1OMC Curved Mirror Alignment Cav_scan_response_130828_Pitch.pdfCav_scan_response_130828_Yaw.pdf
Cavity parameter was measured with 50V bias on PZT1 (CM1)
- PZT combination was changed: PZT1 #21 (PZT ASSY#6) / PZT2 #25 (PZT ASSY #4)
- 19th HOMs of the USB makes accidental resonance with the nominal cavity length.
Entry  Tue Aug 27 17:02:31 2013, Koji, Mechanics, Characterization, Spot position measurement on the diode mounts DCPD1.png
After the PZT test, the curved mirrors were aligned to the cavity again.
In order to check the height of the cavity beam, the test DCPD mount was assembled with 2mm shim (D1201467-3)
The spot position was checked with a CCD camera.
Entry  Thu Aug 22 15:40:15 2013, Koji, Electronics, Configuration, PZT endurance test P8214340.jpgP8214337.jpgIR_0457.jpgIR_0461.jpg
[Koji, Jeff]
Background
In response to the failure of one of the PZTs on L1OMC (LLO:8366), we
    Reply  Fri Aug 23 19:24:32 2013, Koji, Electronics, Configuration, PZT endurance test (II) PZT_shaking.png
The PZT tests were finished with the conclusion that the PZT won't be damaged with our expected usage.

This is another test of the PZTs to make sure small (~10V) reverse voltage does not break the PZTs.
Background
Entry  Thu Aug 22 15:34:03 2013, Koji, Optics, General, OMC Cavity side gluing 
[Koji Jeff]
o BS1, FM1, FM2 prisms were glued
=> This fixed the unstability of the OMC locking
Entry  Wed Aug 21 08:31:21 2013, Koji, Optics, Characterization, H1 OMC cavity alignment 
Alignment of the H1 OMC cavity mirrors
- The cavity mirrors as well as the first steering mirror were aligned on the cavity side template.
- The locking of the cavity was not so stable as before. Some high freq (several hundreds Hz) disturbance makes the cavity
Entry  Fri Aug 16 17:21:38 2013, Koji, General, General, [OMC002] Build started 
[Jeff Koji]

The breadboard (SN2) was loaded on the transportation fixture.

The laser side template was installed and the cavity mirrors were placed.
Entry  Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List 
Link to the "Mirror/PZT Characterization links"

Breadboard

BB1 OMC(001) OMC
Entry  Tue Apr 16 09:43:58 2013, Koji, Optics, Configuration, Mirror list for L1OMC OMC_breadboard_mirror_config.png
L1 OMC
Cavity Mirrors
FM1 (input coupler): A8
    Reply  Fri Aug 16 15:31:17 2013, Koji, Optics, Configuration, Mirror list for OMC(002) 
OMC(002)

Cavity Mirrors

FM1 (input coupler): A9
Entry  Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4 PZT_assembly.pdf
Yesterday, Jeff and I bonded the PZT assemblies (#3/#4).
The attached is the arrangement of the components
    Reply  Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6 
PZT Assembly #5/#6 were glued on Fri Aug 9th
They are removed from the fixture on Mon Aug 12th.
All of the four PZT assemblies were moved to the OMC lab.
Entry  Sat Jul 6 17:10:07 2013, Koji, Mechanics, Characterization, PZT Response analysis PZT_Scan.pdfL1OMC_PZT_Response.pdf
Analysis of the PZT scan / TF data taken on May 31st and Jun 1st.
[DC scan]
Each PZT was shaken with 10Vpp 1Hz triangular voltage to the thorlabs amp.
Entry  Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp 
http://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building)
Entry  Tue Jun 18 15:45:38 2013, Koji, General, General, [LLO] OMC installation in HAM6 
OMC installed in HAM6!
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7486
   
Entry  Tue Jun 18 10:01:11 2013, Koji, Optics, Characterization, Cavity Finesse analysis finesse_measurements.pdf
This is the analysis of the cavity finesse data taken on  Apr/13/2013 (before baking), May/30/2013 (after baking), and Jun/02/2013 (after cleaning).
If we believe this result, baking contaminated the cavity, and the first contact removed it. That agrees with the power measurement of the transmitted
light.
Entry  Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status preamp_arrangement.png
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation box: 250.8lb
Entry  Thu Jun 13 12:12:20 2013, Zach, General, General, [LLO] OMC and OMCS in LVEA 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395
Entry  Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373
Entry  Mon Jun 10 10:04:37 2013, Koji, General, General, [LLO] OMC Test OMC_pow_cal.pdfresponsivity.pdfOMC_pow_cal_compensated.pdf
[Koji Zach]
We worked on the OMC test over the weekend.
- At the beginning, the measured OMC transmission was ~85% even after subtracting the junk light and sidebands from the calculation.
Entry  Fri Jun 7 16:04:44 2013, Koji, General, General, [LLO] OMC arrived 
[Koji Zach Suresh]
The OMC arrived at LLO without any destruction!

    We found that one shock sensor on the box turned red, the other stayed white.
    We brought the Perican case to the changing
Entry  Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out CAM00011.jpgP6054027.JPG
[Koji, Jeff]
The L1 OMC finally sent out from Caltech!
Entry  Wed Jun 5 18:19:51 2013, Koji, General, General, Some recent photos from the OMC final test at CIT 
Applying First Contact for the optics cleaning
Entry  Wed Jun 5 01:06:35 2013, Zach, General, Characterization, L1 OMC as-built diagram L1OMC_asbuilt.pdf
 D1300507
 
Entry  Mon Jun 3 21:19:03 2013, Koji, General, General, Planning 
Monday - Evening
(Koji)
[done] - DCPD alignment
Entry  Mon Jun 3 18:58:08 2013, Koji, Optics, Configuration, OMC final tests 
- QPD mount aligned, QPD output checked
  The spots are with 100um from the center of the diodes. [ELOG Entry (2nd photo)]
Entry  Fri May 31 14:07:54 2013, Koji, Optics, Characterization, Transverse Mode Spacing measurement afte the baking  Cav_scan_response_130530_Pitch.pdfCav_scan_response_130530_Yaw.pdf
Measurement for pitch
Free Spectral Range (FSR): 264.9703 +/− 0.0007 MHz
Cavity roundtrip length: 1.131419 +/− 0.000003 m
Entry  Thu May 30 15:00:28 2013, Koji, Optics, General, QPD alignment 
The QPD alignment was adjusted using the aligned beam to the cavity and the 4ch transimpedance amplifier.
As I have a test cable for the QPD, I attached a DB9 connector on it so that I can use the QPD transimpedance
amplifier to read the photocurrent. The transimpedance of the circuit is 1kV/A. 
    Reply  Fri May 31 05:46:54 2013, Koji, Optics, General, QPD alignment QPD1.JPGQPD2.JPGQPD_calib.nb.zip
Peter F suggested to check the bottom surface of the PD housings if there is any protrusion/interference/whatever.
And that was true! It was found that the front side of QPD1 (Left) was lifted by a machining burr.
It seems that this burr consistently exists as the other one also have it (see QPD2 picture (right)) although it is not too terrible compared to
Entry  Thu May 30 14:38:42 2013, Koji, Electronics, General, Cable fitting  
Yesterday Jeff and Chub worked on the cabling of the OMC. It turned out that the gender of the cable connectors 
going from the cavity side to  the connector bracket on top of the OMC were opposite from what is  needed.  
This way, the connectors can't fixed on the cable harness, thus they are free during the shipping.
Entry  Thu May 23 23:41:48 2013, Koji, Mechanics, General, DCPD/QPD Mount 
DCPD mounts and QPD mounts were attached on the breadboard. They are not aligned yet and loosely fastened.
DCPD (mounting 4-40x5/16 BHCS Qty4)
Entry  Wed May 8 15:36:50 2013, Koji, General, General, Latest OMC schedule 

May
(done) Mon  6th: Invar plate arrival / Spot position measurement
(done) Tue  7th: Invar plate cleaning / Spot position measurement
/ EP30-2 arrival / Invar plate gluing to the test mounting brackets
(done) Wed  8th: Invar plate cleaning done / Baking of the test pieces (with Bob's
oven)
Thu  9th: ***After bake torque/force test***

***If the invar plate passes the test***
Thu  9th Light side invar plate gluing
Fri 10th Cable
    Reply  Mon May 13 15:00:23 2013, Koji, General, General, Current most reliable OMC schedule 
May
Tue 14th The OMC given to Bob (Air bake & Vac bake)

Mon 20th The OMC received from Bob
         Apply First contact
 
       Diode mount adjustment / Electronic tests
Tue 21st Diode mount adjustment / Electronic tests / Optical tests
Wed 22nd Final cabling (***Chub***)
Thu
23rd Final cabling / Packing
Fri 24th Packing / Shipping

Mon 27th? Arrival to LLO / Koji fly to LLO
Tue 28th Test on the optical bench
Wed 29th Test
       Reply  Tue May 21 18:28:08 2013, Koji, General, General, Current most reliable OMC schedule 
- The wrong Mighty Mouse connectors for the PZT wires were prepared. The correct ones are in the vacuum oven till Tuesday morning.
- The thread holes for the cable pegs are 1/4-20 rather than 10-24.  This requires re-machining of the cable pegs & the C&B.
- We are waiting for the fast shipment of the from LHO
Entry  Mon May 20 14:59:21 2013, Koji, General, General, OMC is out from the oven 
The OMC came back to the table again.
No obvious change is visible: no crack, no delamination
The OMC was fixed on the table and the beam was aligned to the cavity
Entry  Tue May 14 19:06:00 2013, Koji, Clean, General, OMC Baking 
The OMC is in the air bake oven now.
Entry  Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing 
The invar reinforcement shims were glued on the glass brackets on the breadboard. 
We worked on the light side on May 10th and did on the dark side on May 13rd.
U-shaped holding pieces are used to prevent each invar shim to be slipped from the right place. 
Entry  Mon May 13 14:49:35 2013, Koji, Mechanics, Characterization, Mounting Glass Bracket still broke with tightenin stress 
[Koji / Jeff]
This is the elog about the work on May 9th.
We made two glass brackets glue on the junk 2" mirrors with the UV glue a while ago when we used the UV bonding last time.
Entry  Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress COMSOL1.png
 
Entry  Mon May 6 19:31:51 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts DCPD1.pngDCPD2.pngQPD1.pngQPD2.png
Measurement Order: DCPD2->DCPD1->QPD1->QPD2
DCPD1: 1.50mm+0.085mm => Beam 0.027mm too low
DCPD2: 1.75mm+0.085mm => Beam 0.051mm too high (...less confident)
    Reply  Wed May 8 15:08:57 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts DCPD1.pngDCPD2.pngQPD1.pngQPD2.png
Remeasured the spot positions:
DCPD1: 1.50mm+0.085mm => Beam 0.084mm too high
DCPD2: 1.50mm+0.085mm => Beam 0.023mm too high
Entry  Fri May 3 21:09:08 2013, Koji, General, General, OMC is back 
L1 OMC is back on the table for the action next week.
Entry  Thu Apr 18 11:59:02 2013, Koji, General, General, DCPD path gluing 
[Jeff, Koji]
DCPD path gluing
Usual preparation
Entry  Thu Apr 18 11:43:59 2013, Koji, General, General, Mounting Glass Bracket Failure 
[Jeff, Koji]
- While we were working on the optics alignment, one of the mounting brackets made of glass god tore apart into two when a holding screw was removed.
The glass component had a crack at the very middle of the part.
Entry  Wed Apr 17 07:30:04 2013, Koji, Optics, General, QPD path glued 
Yesterday, all of the glass components for the QPD path were glued.

- Check the alignment of the beam with the cavity.
Entry  Thu Apr 4 01:43:06 2013, Koji, Optics, Characterization, Mirror T measurement 
[Zach, Koji]
The measurement setup for the transmission measurement has been made at the output of the fiber.
- First, we looked at the fiber output with a PBS. It wasn't P-pol so we rotated the ourput coupler.
    Reply  Mon Apr 8 11:11:37 2013, Koji, Optics, Characterization, More Mirror T measurement 
More Ts of the mirrors were measured.
A mirror specification:
Request: 8300+/-800 ppm
       Reply  Tue Apr 16 08:12:14 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
T&Rs of the B mirrors and some of the E mirrors are measured.
I found that these BSs have high loss (1%~3%) . As this loss will impact the performance of
the squeezer
          Reply  Tue Apr 16 23:26:51 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
Since the previous measurement showed too high loss, the optical setup was checked.
It seemed that a PBS right before the T&R measurement setup was creating a lot of scattering (halo) visible with a sensor card.
This PBS was placed to confirm the output polarization from the fiber, so it was ok to remove it.
Entry  Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation 
[Jeff Koji]
- Placed the optics on the PD/QPD path
- Checked the alignment of the beam on the dummy PD/QPD mounts
Entry  Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued Cav_scan_response_130412_Pitch.pdfCav_scan_response_130412_Yaw.pdf
[Jeff, Zach, Lisa, Koji]
Gluing of the cavity mirrors went very well!!!
Preparation
Entry  Fri Apr 12 09:25:31 2013, Koji, Optics, Characterization, Alignment of the OMC (without glue) 
[Zach Koji]
The first attempt not to touch the curved mirrors did not work. (Not surprising)
The eigenmode is not found on the mirror surface.
Entry  Thu Apr 11 15:10:22 2013, Koji, General, General, OMC Progress 
[Zach, Jeff, Koji]

- Jeff configured the bottom side template to have a nominal value
obtained from the solid works model. Note that the thickness of the
Entry  Wed Apr 10 00:40:30 2013, Zach, Optics, Configuration, fauxMC locked fauxMC_labeled.jpg
[Koji, Zach]
Tonight, we locked the "fauxMC". We obtained
a visibility of >99%.
Entry  Mon Apr 8 21:11:14 2013, Koji, Optics, General, PZT assembly gluing 
[Jeff, Zach, Koji] 
PZT assembly gluing
Glue gun -> to be returned to MIT
    Reply  Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures 
 
Entry  Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned beam_profile.pdfmode_matching.pdf
Mode matching:
 
Entry  Mon Apr 8 20:56:52 2013, Koji, Optics, Configuration, PZT & Curverd Mirror arrangement PZT_assembly.pdf
Assembly #1:
Mounting Prism #16
PZT #26
Entry  Mon Apr 8 11:49:18 2013, Koji, Mechanics, Characterization, PZT actuator tested at LLO 
Test result of the PZTs by Valera and Ryan
PZT  Length Angle
 #   [nm/V] [urad/um]
 11  14.5   17.6
 12  13.8   17.8
 13  11.2   25.0
 14  14.5    6.6
 15  12.5   10.6


21  14.5    9.7
 22  13.8   28.8
 23  14.5    6.8  ==> Assembly #2
 24  18.5   51.7  ==> Used for prototyping
 25  17.1   13.8
Entry  Mon Apr 8 11:29:08 2013, Koji, Optics, Characterization, Mirror/PZT Characterization links 

    Mirror List
    http://nodus.ligo.caltech.edu:8080/OMC_Lab/152
     
    Mirror T measurement:
Entry  Thu Mar 28 03:37:07 2013, Zach, Optics, Configuration, Test setup input optics progress OMC_test_setup_IO.jpg2013-03-27_05.48.20.jpg2013-03-28_02.29.36.jpg
[Lisa, Zach]
Last night (Tuesday), I finished setting up and aligning most of the input optics for the OMC characterization setup. See the diagram below, but
the setup consists of:
    Reply  Fri Mar 29 08:55:00 2013, Zach, Optics, Configuration, Beam launched into fiber 


    
        
            Quote:
        
        
            

           Lisa and I concurred that it felt like we had converged to the optimum alignment and polarization, which would mean that the lack of
       Reply  Thu Apr 4 23:44:52 2013, Koji, Optics, Configuration, Beam launched into fiber 
We had to move our flipper mirror to share the beam between Peter's setup and ours as our flipper is at the place where the ISS PD array base is supposed
to be!
There was no place to insert the flipper in the setup. We (Peter and Koji) decided to move the laser back for ~2".
          Reply  Fri Apr 5 18:18:36 2013, Zach, Optics, Configuration, AOM probably broken Isomet_1250C_zin_4_5_13.png


    
        
            Quote:
        
        
            

           Then, I started to check the AOM path. I noticed that the 1st (or -1st) order beam is very weak. 
Entry  Wed Apr 3 17:39:38 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs before the glue test P4033491.JPGshadow_sensor_calib.pdf
We want to make sure the responses of the PZT actuator does not change after the EP30-2 gluing.
A shadow sensor set up was quickly set-up at the fiber output. It turned out the ring PZTs are something really not-so-straightforward. 
If the PZT was free or just was loosely attached on a plane by double-sided tape, the actuation response was quite low (30% of the spec). 
    Reply  Fri Apr 5 14:39:26 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs after the heat cure shadow_sensor_calib_after_bake.pdfPZTresponse.pdf
We attached fused silica windows on the test PZTs. http://nodus.ligo.caltech.edu:8080/OMC_Lab/93
The glued assemblies were brought to Bob's bake lab for the heat cure. There they are exposed to 94degC heat for two hours (excluding ramp up/down
time).
Entry  Thu Apr 4 01:35:04 2013, Koji, Optics, Characterization, Mode matching to the OMC cavity 
The fiber output was matched with the lenses on a small bread board.
The detailed configuration is found in the following elog link.
http://nodus.ligo.caltech.edu:8080/OMC_Lab/105
Entry  Thu Apr 4 00:35:42 2013, Zach, Optics, Configuration, MMT installed on breadboard, periscope built 2013-04-03_23.43.00.jpg
[Koji, Zach]
We installed the MMT that matches the fiber output to the
OMC on a 6"x12" breadboard. We did this so that we can switch from the "fauxMC" (OMC mirrors arranged with standard
Entry  Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test 
EP30-2 gluing test
Entry  Mon Apr 1 18:17:01 2013, Koji, Optics, General, Mirror curvature center test 6x
Locations of the curvature minimum on the OMC curved mirrors have been measured. 

Motivation:

When a curved mirror is misaligned, the location of the curvature center is moved.
Entry  Mon Apr 1 10:28:03 2013, Koji, Mechanics, General, Additional UV blast for the top surface P3283483.JPGP3283459.jpgP3283473.JPG
[Koji, Lisa, Jeff, Zach]

Jeffs concern after talking with the glue company (EMI) was that the UV blast for the top side was not enough.
Entry  Mon Apr 1 03:23:48 2013, Koji, Optics, General, UV power calibration 
[Koji Lisa Jeff Zach]
Eric G bought a UV power meter from American Ultraviolet.
Our UV illuminator was calibrated by this power meter.
Entry  Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints 
[Koji, Jeff, Zach, Lisa]
We glued a test PZT-mirror assembly last week in order to make sure the heat cure of the epoxy does not make any problem 
on the glass-PZT joints. The assembly was sent to Bob for the heat treatment. We received the assembly back from Bob on Wednesday.
Entry  Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18 
WB 18 March 

    Diode test
    
        Dark current / Dark noise / Impedance
        Quantum Efficiency test (but with glass)
        Diode given
    Reply  Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon 
25 March (Mon): 
Inspect the test PZT assembly

    => Give it to Bob. (done)

Glue topside components 
       Reply  Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon 
26 March (Tue):
- Curved mirror characterization (Koji, done)
 - Input optics for the cavity locking (Zach)
          Reply  Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed 
27 March (Wed)
- AOM drift investigation (Lisa, Zach)
- Cavity input optics ~ Fiber coupling (Zach)
             Reply  Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu 
28 March (Thu): 

    Rebuild the bottom template in the lab
    Place the bottom template on the OMC
    Glue the PZTs on the mounting
prisms (x2)
    Glue the curved mirrors on the PZTs (x2)
    R&T measurement
    Placing optics on the OMC breadboard
Entry  Tue Mar 26 22:33:07 2013, Koji, General, General, Loan for the OMC building 
Loan from PSL Lab
- 300mm mirror with Ultima mount and pedestal
- Isopropanol small glass bottleReturned on Apr 12 2013. 
Entry  Mon Mar 25 19:31:16 2013, Koji, Optics, General, OMC Top-side gluing P3253353.jpgP3253372.jpgP3253394.jpgP3253400.jpg
[Koji Jeff Zach]  
AAA
Entry  Sat Mar 23 16:36:15 2013, Koji, Electronics, Characterization, Diode QE measurement P3213308.JPGP3213310.JPG
Quantum efficiencies of the C30665GH diodes were measured. 
- The diode was biased by the FEMTO preamplifier.
- Diode Pin 1 Signal, Pin 2 +5V, Pin 3 open
Entry  Sat Mar 23 13:34:14 2013, Koji, Optics, General, PZT assembly prototype glued P3223322.jpgP3223323.jpgP3233336.jpgP3233348.jpg
 
Prototype PZT assembly
Motivation:
Entry  Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC P3223314.JPGP3223319.jpgP3223320.jpg
Received black glass beam dumps from MIT
- gluing by EP30-2 looks pretty fine. Enough sturdy.
- some gap visible between the glass => incident angle should be considered so that the first beam does not exit from the gap
Entry  Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered P3233349.jpg
Preparation for ionized N2 blow
- 99.9998% N2 cylinder delivered (ALPHAGAZ 2 grade by AIR LIQUIDE) ALPHAGAZ
2 [PDF]
Entry  Wed Mar 20 09:38:02 2013, Zach, Optics, Characterization, [LLO] OMC test bench modified new_setup_traced.jpg
 For various reasons, I had to switch NPROs (from the LightWave 126 to the Innolight Prometheus).
I installed the laser, realigned the polarization and modulation
optics, and then began launching the beam into the fiber, though I have not coupled any light yet.
Entry  Fri Mar 15 02:15:45 2013, Koji, Electronics, Characterization, Diode testing QPD_GR_TEST_130316.pdf
Diode testing
o Purpose of the measurement
- Test Si QPDs (C30845EH) for ISC QPDs Qty 30 (i.e. 120 elements)
    Reply  Sun Mar 17 21:59:47 2013, Koji, Electronics, Characterization, Diode testing ~ DCPD OMCPD_TEST_130317.pdf
- For the dark noise measurement, the lid of the die-cast case should also contact to the box for better shielding. This made the 60Hz lines almost completely
removed, although unknown 1kHz harmonics remains.
- The precise impedance of the setup can not be obtained from the measurement box; the cable in between is too long. The diode impedance should
Entry  Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test 
ALL returned

Loan from ATF:

2 blue banana cables returned on
Jun 4, 2013
Entry  Thu Mar 14 17:06:21 2013, Koji, Mechanics, General, OMC SUS work @LLO 2013-03-14_16.03.40.jpg2013-03-14_16.04.07.jpg
EDIT (ZK): All photos on Picasa.
Also, I discovered that since Picasa was migrated to Google+ only, 
you no longer have the option to embed a slideshow like you used to. Lame, Google.
Entry  Thu Mar 7 15:53:47 2013, Koji, Mechanics, General, OMC Transportation fixture, OMC PD/QPD mounts P3073218.JPGP3073219.JPGP3073223.JPGP3073225.JPGP3073227.JPG
 
Entry  Tue Mar 5 19:37:00 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details eOMC_visibility_3_4_13.png
EDIT (ZK): Koji points out that (1 - Ti) should really be the non-resonant reflectivity of the aligned cavity, which is much closer to 1. However,
it should *actually* be the non-resonant reflectivity of the entire OMC assembly, including the steering mirror (see bottom of post). The steering mirror
has T ~ 0.3%, so the true results are somewhere between my numbers and those with (1 - Ti) -> 1. In practice, though, these effects are swamped by the
    Reply  Wed Mar 6 23:24:58 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details TEK00005.PNGTEK00007.PNGeOMC_visibility_3_4_13.pngeOMC_AMTF_vs_power_3_6_13.png
I found that, in fact, I had lowered the modulation depth since when I measured it to be 0.45 rads --> Psb = 0.1.
Here is the sweep measurement:
Entry  Mon Feb 4 00:39:08 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage autocollimator_wedge_measurement.pdf
Method:

    Mount the tombstone prism on the prism mount. The mount is fixed on the rotation stage.
    Locate the prism in front of the
autocollimator.
    Find the retroreflected reticle in the view. Adjust the focus if necessary.
    Confirm that the rotation of the
    Reply  Wed Feb 6 02:34:10 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage 
Measurement:

    A6:   α = 0.665 deg, β = +3.0 arcmin (1.5 div up)
    A7:   α = 0.635 deg, β =  
0.0 arcmin (0.0 div up)
    A8:   α = 0.623 deg, β = - 0.4 arcmin (-0.2 div up)
    A9:   α =
       Reply  Fri Mar 1 23:52:18 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage 
Measurement:

    E1:   α =  0.672 deg, β = +0.0  arcmin (0 div up)
    E2:   α =  0.631 deg, β = - 0.3  arcmin
(-0.15 div down)
    E3:   α =  0.642 deg, β = +0.0  arcmin (0 div up)
    E4:   α =  0.659 deg, β
Entry  Thu Feb 21 18:44:18 2013, Koji, Optics, Configuration, Perpendicularity test perpendicularity_test.pdfP2203206.JPG
Perpendicularity test of the mounting prisms:
The perpendicularity of the prism pieces were measured with an autocollimator.
Two orthogonally jointed surfaces forms a part of a corner cube. 
    Reply  Wed Feb 27 18:18:48 2013, Koji, Optics, Configuration, More perpendicularity test 
Mounting Prisms:
(criteria: 30arcsec = 145urad => 0.36mm spot shift)
SN  Meas.(div) ArcSec Spec.
       Reply  Fri Mar 1 23:06:15 2013, Koji, Optics, Configuration, More perpendicularity test final 
Perpendicularity of the "E" mirror was measured.

Mounting Prisms:
(criteria: 30arcsec = 145urad => 0.36mm spot shift)
Entry  Thu Feb 7 23:01:45 2013, Koji, Optics, Characterization, UV epoxy gluing test 
 [Jeff, Yuta, Koji]
Gluing test with UV-cure epoxy Optocast 3553-LV-UTF-HM
- This glue was bought in the end of October (~3.5 months ago).
Entry  Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m P2053119.jpgP2053120.JPG
Dmass borrowed the LB1005 servo amp from the OMC lab.
It happened this week although it seems still January in his head. Got it back on Mar 24th
The A2 and C2 mirrors have been sent to Josh Smith at Fullerton for the scatterometer measurement.
Entry  Tue Jan 22 17:56:32 2013, Koji, Mechanics, General, Rotary stage selection 
Newport UTR80

    Sensitivity: 4 arcsec
    Graduations: 1 deg
    Vernier: 1 arcmin
    Fine travel range: 4 deg
    
Entry  Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed P1223116.JPG
A carpenter has come to install the eyeware storage and hooks for the face shields.
Entry  Sat Jan 19 20:47:41 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator autocollimator_wedge_measurement.pdf
The wedge angle of the prism "A1" was measured with the autocollimator (AC).
The range of the AC is 40 arcmin. This means that the mirror tilt of 40arcmin can be measured with this AC.
This is just barely enough to detect the front side reflection and the back side reflection.
Entry  Fri Jan 18 13:25:17 2013, Koji, Optics, Configuration, Autocollimator calibration autocollimator_calibration.pdf
An autocollimator (AC) should show (0,0) if a retroreflector is placed in front of the AC.
However, the AC may have an offset. Also the retroreflector may not reflect the beam back with an exact parallelism.
To calibrate these two errors, the autocollimator is calibrated. The retroreflector was rotated by 0, 90, 180, 270 deg
Entry  Wed Jan 16 14:10:50 2013, Koji, Optics, Characterization, Autocollimator tests of optics perpendicularity/parallelism 
The items:
- Autocollimator (AC) borrowed from Mike Smith (Nippon Kogaku model 305, phi=2.76", 67.8mm)
- Retroreflector (corner cube)
Entry  Sun Jan 6 23:22:21 2013, Koji, Mechanics, General, SolidWorks model of the OMC suspension  D0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.pngD0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.easm
 
Entry  Wed Jan 2 07:45:39 2013, Koji, Optics, Characterization, First Contact test Cav_scan_response_zoom_20121125_C2_before.pdfCav_scan_response_zoom_20121125_C2_after.pdf
Conclusion: Good. First contact did not damage the coating surface, and reduced the loss

- Construct a cavity with A1 and C2
- Measure the transmission and FWHM (of TEM10 mode)
Entry  Wed Jan 2 07:35:55 2013, Koji, Optics, Characterization, Thickness of a curved mirror 
Measured the thickness of a curved mirror:
Took three points separated by 120 degree.
S/N: C2, (0.2478, 0.2477, 0.2477) in inch => (6.294, 6.292, 6.292) in mm
Entry  Mon Dec 31 03:11:45 2012, Koji, Optics, Characterization, Further more RoC measurement Cav_scan_response_zoom_20121125_C6_9.pdf
Total (excluding C2, C7, C8): 2.575 +/- 0.005 [m]
New results
C6: RoC: 2.57321 +/− 4.2e-05m    
Entry  Mon Dec 31 03:10:09 2012, Koji, Optics, General, SolidWorks model of the OMC breadboard D1201439_aLIGO_Breadboard_layout_assy_121224.pngD1201439_aLIGO_Breadboard_layout_assy_130105.easm
 
Entry  Mon Dec 31 01:45:04 2012, Koji, General, General, Work completed in Nov and Dec [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov] [Dec]
Entry  Wed Dec 26 14:33:33 2012, Koji, Facility, General, Lase Interlock wired PC263073.jpgPC263074.jpgPC263075.jpg
Two switches are connected in series.
Entry  Mon Jul 23 17:15:14 2012, Koji, Clean, General, Talking with Margot 
I consulted with Margot about the cleaning of the optics

    Optics are considered as a clean object. Large dusts can be removed by ionized N2 flow etc.
    Barrel of optics can be wiped
with Acetone.
    Optical surfaces are best to be cleaned by First Contact.
    A peek
    Reply  Wed Dec 19 18:47:03 2012, Koji, Clean, General, First Contact Training with Margot 
Steve and I visited Margot to have a training session for application of First Contact on optics.
- Make "thick" layer of first contact. It becomes thin when it gets dried.
- Apply more FC once a peek sheet is placed on the FC
Entry  Tue Dec 18 20:04:40 2012, Koji, Optics, Characterization, Prism Thickness Measurement prism.png
The thicknesses of the prism mirrors (A1-A5) were measured with micrometer thickness gauge.
Since the thickness of the thinner side (side1) depends on the depth used for the measurement,
it is not accurate. Unit in mm.
Entry  Thu Nov 29 21:18:23 2012, Koji, Optics, General, OMC Mounting Prisms have come PB293030.JPGPB293032.JPG

Entry  Mon Nov 26 01:40:00 2012, Koji, Optics, Characterization, More RoC measurement RoC_measurement.pdf
C1: RoC: 2.57845 +/− 4.2e−05m
C2: RoC: 2.54363 +/− 4.9e−05m
C3: RoC: 2.57130 +/− 6.3e−05m    
Entry  Thu Oct 18 20:23:33 2012, Koji, Optics, Characterization, Improved measurement Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf
Significant improvement has been achieved in the RoC measurement.

    The trans PD has much more power as the BS at the cavity trans was replaced by a 50% BS. This covers the disadvantage of using the a
Si PD.
    The BB EOM has a 50Ohm terminator to ensure the 50Ohm termination at Low freq.
    The length of the cavity was changed
    Reply  Mon Nov 19 13:33:14 2012, Koji, Optics, Characterization, Resuming testing mirror RoCs Cav_scan_response_zoom_20121016.pdf
In order to resume testing the curvatures of the mirrors, the same mirror as the previous one was tested.
The result looks consistent with the previous measurement.
It seems that there has been some locking offset. Actually, the split peaks in the TF@83MHz indicates 
Entry  Sat Nov 17 02:31:34 2012, Koji, Optics, Characterization, Mirror T test 
Mirror T test
The mirror was misaligned to have ~2deg incident (mistakenly...) angle.
Entry  Fri Nov 9 00:43:32 2012, Koji, Optics, Characterization, Further more wedge measurement wedge_measurement_overall.pdf121108a_A1.pdf
Now it's enough for the first OMC (or even second one too).
Today's measurements all distributed in theta>0.5deg. Is this some systematic effect???
I should check some of the compeled mirrors again to see the reproducibility...
Entry  Thu Nov 8 20:12:10 2012, Koji, Optics, Configuration, How many glass components we need for a plate 
Optical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)

    
        
             
Entry  Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy UVepoxy.jpg
KA's question:
Do you know how to apply this epoxy? 
Do we need a plunger and a needle for this purpose?
Entry  Thu Nov 8 19:47:55 2012, Koji, Electronics, Configuration, Solder for PZTs 
Rich saids:
I have ordered a small roll of solder for the OMC piezos. 
Entry  Thu Nov 8 13:24:53 2012, Koji, Optics, Characterization, More wedge measurement wedge_measurement_overall.pdf
A1
Horiz Wedge    0.497    +/-    0.004 deg
Vert Wedge      0.024    +/-    0.004 deg
Entry  Wed Nov 7 20:44:11 2012, Koji, General, General, Plan Update: November [!] OMC_Project_Schedule.pdf
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov]
[Dec]
Entry  Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov]
[Dec]
Entry  Wed Nov 7 01:28:20 2012, Koji, Optics, Characterization, Wedge angle test (A1) wedge_measurement.pngwedge_measurement_setup.png
Wedge angle test
Result: Wedge angle of Prism A1: 0.497 deg +/- 0.004 deg

 
Entry  Wed Oct 17 20:36:04 2012, Koji, Optics, General, RoC test cavity locked detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf
The RoC test setup has been built on the optical table at ATF.

The cavity formed by actual OMC mirrors have been locked.
Entry  Tue Oct 16 15:51:01 2012, Koji, General, General, Plan Update: October [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov] [Dec]

Facility/Supplies
Entry  Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!] 

    Work done
    
        Floor cleaning
[ELOG]
        Placing sticky
mats [ELOG]
        Label Maker
Entry  Tue Oct 16 14:50:54 2012, jamie, jeff, General, General, OMC breadboard/plate measurement dimensions 
We have measured the dimensions and mass of the OMC glass plates/breadboards:




S/N
Mass (g)
Length
(mm)
Width (mm)
Height (mm)
Notes


01
6146
449.66
149.85
41.42,
Entry  Fri Oct 12 17:15:19 2012, Koji, Optics, General, Loan from the 40m / ATF 

    HWP set
         
    
        Optics: CVI QWPO-1064-08-2-R10

       Mount: New Focus #9401
        
Entry  Tue Oct 9 05:03:15 2012, Koji, Electronics, General, OMC Test Electronics Setup electronics_setup.pngelectronics_setup.pdf
 
Entry  Tue Oct 9 04:59:24 2012, Koji, Optics, General, OMC Test Optical Setup OMC_test_setup.pngOMC_test_setup.pdf

 
Entry  Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response 
EGE&G 2mm photodiode angle response measured by Sam T1100564-v1
Entry  Fri Oct 5 03:39:58 2012, Koji, Optics, General, RoC Test setup RoC_test_setup.pdfRoC_test_setup.png
Based on Zach's experiment design, I wrote up a bit more detailed optical layout for the mirror test.
Entry  Tue Sep 25 14:18:14 2012, Koji, Clean, General, Particle Counts 
Particle counts
Before the prefilter is installed: 0.5um 1191cnts, 0.7um 346cnts
2:20 prefilter installed
    Reply  Mon Oct 1 16:06:55 2012, Koji, Clean, General, Particle Counts 
1. It turned out that the particle counter MET ONE 227A at ATF shows 
(particle count)/(0.1 ft^3) 
Entry  Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools P8171968.jpgP8171969.jpg
Last Friday, new workbenches were installed. Vladimir got a new table and a cleanroom stool.
Entry  Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack P8131959.JPGP8131961.JPG
Clean supplies & some cleaning tools are located at the right side of the entrance.
The file cabinet there was moved to the left side of the door, but will be removed eventually.
Entry  Mon Aug 13 17:01:35 2012, Koji, Clean, General, Particle Counts 
Aug 13, 2012 / 0.5um 1000~2000/(0.1 cu ft) / 0.7um   400-600/(0.1 cu ft) by ATF particle counter (MET ONE 227A)
They are counts/(0.1 ft^3)! These numbers should be multiplied by 10 to know the particle "CLASS".
Entry  Mon Aug 13 16:59:11 2012, Koji, Clean, General, Room Cleaning Log 
Floor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug 15, 2012)
Floor wiped with a wet wiper (Sep 25, 2012)
Entry  Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier P8131960.JPG
It seemed that a laser safety barrier was installed today!?
Entry  Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect P8011949.JPGP8011947.JPGP8011948.JPG
- The floor of the room was cleaned and waxed!
- Sticky mats are placed! Now we require shoe covers!
Entry  Tue Jul 31 21:33:17 2012, Koji, General, General, Plan Update: August [!] 
Completed work of the previous months: [Jul] [Aug] [Sep] [Oct] [Nov] [Dec]

Facility/Supplies

    Work done
    
        Floor
Entry  Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!] 

    Completed Work: Facility/Supplies
    
        Plug a big hole on the wall [ELOG]
        Purchasing work benches
Entry  Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references 
Nicolas Smith,
LIGO Document T0900383-v1 
3mm Photodiode Characterization for Enhanced LIGO
Entry  Fri Jun 29 11:26:04 2012, Zach, Optics, Characterization, RoC measurement setup RoC_measurement_setup.pngRoC_measurement_setup.graffle.zip
Here is the proposed RoC measurement setup. Koji tells me that this is referred to as "Anderson's method".
We would like to use a linear cavity to measure the RoC of the curved mirrors independently (before forming the ring cavity), since the degeneracy
of HOMs will make the fitting easier.
    Reply  Sun Jul 22 15:56:53 2012, Zach, Optics, Characterization, RoC measurement setup detailed_RoC_setup.pngdetailed_RoC_setup.graffle.zip
Here is a more detailed version of the setup, so that we can gather the parts we will need.
Entry  Wed Jul 18 23:20:13 2012, Koji, Optics, Characterization, Mode scan results of ELIGO 
Nic Smith sent me a bunch of elog lists where the results of the mode scan can be found.
From Nic:
There have been many mode scan analyses done at LLO:
Entry  Sat Jul 14 02:16:07 2012, Koji, General, General, Plan Update: July P7071878.jpg
Facility/Supplies

    Work in progress     
    
        Floor cleaning
        Plug slits on the roof of the HEPA booth - blanking panels have been ordered 
Entry  Thu Jun 21 03:07:27 2012, Zach, Optics, Configuration, Parameter selection / mode definition geom_bowtie.pnggeom_non-bowtie.png
EDIT 2 (ZK): As with the previous post, all plots and calculations
here are done with my MATLAB cavity modeling utility, 
Entry  Wed Jun 20 20:37:45 2012, Zach, Optics, Configuration, Topology / parameter selection 8x
EDIT (ZK): All the plots here were generated using my MATLAB
cavity modeling tool, ArbCav
Entry  Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched P6191706.jpg
 
Entry  Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List 
Facility

    Work
    
        Replacing wooden work benches
        
    
       W60" x H28-34" x D30" 
Entry  Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan 
LIGO Document G1200683-v1: 
aLIGO OMC fabrication and testing plan
aLIGO OMC wiki
ELOG V3.1.3-