  350   Sat Apr 20 00:50:12 2019 KojiOpticsCharacterizationOMC(004): Spot positionsSimilarly to OMC
ELOG 349 the spot positions after the
replacement of CM2 were measured (Attachment
 misalignment2.pdfmisalignment3.pdf 
  356   Wed May 1 15:40:46 2019 KojiOpticsCharacterizationOMC(004): Spot positions and the scatteringTried a few things.

1. Replaced CM1 (PZT ASSY
#10=M21+PZT#22+C12) with PZT ASSY #7 (=M1+PZT#13+C13)
 misalignment.pdf 
  357   Fri May 3 11:06:28 2019 KojiOpticsCharacterizationOMC(004): Spot positions and the scatteringExperiment on 5/1
- CM1 right knob was moved 1div (10um)
backward such that the spots were better
 misalignment.pdf 
  352   Mon Apr 22 19:54:28 2019 KojiGeneral OMC(004): Spot positions at the end of Apr 22nd   misalignment4.pdf 
  344   Wed Apr 17 09:08:47 2019 StephenGeneralGeneralOMC(004): Unwrapping and preparing breadboard[Stephen, Philip, Koji, Joe]

Breadboard D1200105 SN06 was selected
as described in eLOG
 IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG 
  326   Wed Apr 10 19:22:24 2019 KojiGeneralGeneralOMC(004): preparation for the PZT subassembly bonding Preparation for the PZT subassembly
bonding (Section 6.2 and 7.3 of T1500060
(aLIGO OMC optical testing procedure)
  
  327   Thu Apr 11 10:54:38 2019 StephenGeneralGeneralOMC(004): preparation for the PZT subassembly bonding


Quote:


  
  167   Sat Sep 7 17:20:56 2013 KojiGeneralGeneralOMC/PD lab optical table wrapping[Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table
 P9064377.JPG 
  549   Sun Jun 25 21:04:35 2023 KojiGeneralCharacterizationOptical assembly/testing of OMC (004) completedOptical assembly/testing of OMC
(004) completed
- OMC (004) with the transport fixture
 PXL_20230624_072237980.jpgPXL_20230624_072254264.jpgPXL_20230624_072304754.jpgPXL_20230624_072320422.jpg 
  152   Fri Aug 16 16:36:19 2013 KojiOpticsGeneralOptics ListLink
to the "Mirror/PZT Characterization
links"
  
  420   Thu Jul 21 14:55:48 2022 KojiGeneralGeneralOptics bonding for the backscatter measurementThe backscatter beam is supposed to appear
in the backpropagation path. The transmission
of the OMC has a couple of optics, it's
 IMG_1098.JPG 
  241   Tue Sep 8 11:18:10 2015 KojiOpticsCharacterizationPBS Transmission measurementMotivation: Characterize
the loss of the Calcite Brewster PBS.

Setup: (Attachment
 setup.JPGCaF2Prism.jpgCaF2Prism2.JPG 
  242   Wed Sep 9 01:58:34 2015 KojiOpticsCharacterizationPBS Transmission measurementCalcite Brewster PBS Continued

The
transmission loss of the Calcite brewster
  
  172   Wed Oct 16 19:16:29 2013 KojiOpticsCharacterizationPD alignment 
 shim 1.5mm 001/002
  
  449   Tue Sep 20 08:54:33 2022 KojiGeneralGeneralPD cage arrangementUpon the LLO work, the current PD arrangement
in the cages are:
CAGE B
  
  252   Sun Mar 6 02:13:28 2016 KojiOpticsCharacterizationPD glass reflectionsOn friday, I removed a glass cover of a
G30655 with a PD can cutter.

When a beam shoots a Perkin Elmer/Excelitas
 P3048124.JPGP3048125.JPG 
  174   Wed Oct 23 02:45:07 2013 KojiGeneralGeneralPD realignmentDCPD2 got misaligned during the cable installation.
The PD alignment procedure have been gone
through again.
  
  111   Tue Apr 16 00:40:45 2013 KojiOpticsGeneralPD/QPD path gluing ~ preparation[Jeff Koji]
- Placed the optics on the PD/QPD
path
  
  276   Tue Mar 28 21:04:27 2017 KojiElectronicsCharacterizationPDH ampAttachment 1: PDH amp
RF part (before the preamp was installed)

Attachment 2:
 6x 
  286   Sat Jul 29 18:44:38 2017 ranaElectronicsCharacterizationPDH ampattachment 6: DCPD preamp looks like the
opamp is wired for positive feedback?
  
  287   Sat Jul 29 21:42:51 2017 KojiElectronicsCharacterizationPDH ampThe polarities indicated in the right circuits
were opposite, obviously.
  
  313   Sat Jan 12 22:49:11 2019 KojiOpticsCharacterizationPM-SM patch cable mode cleaning effectMode
cleaning capability of an optical fiber was
measured. The conclusion
 fiber_mode_cleaning.pdf 
  103   Mon Apr 8 20:56:52 2013 KojiOpticsConfigurationPZT & Curverd Mirror arrangementAssembly #1:
Mounting Prism #16
PZT #26
 PZT_assembly.pdf 
  149   Fri Aug 9 10:09:56 2013 KojiGeneralGeneralPZT Assembly #3/#4Yesterday, Jeff and I bonded the PZT assemblies
(#3/#4).
The attached is the arrangement of
 PZT_assembly.pdf 
  150   Mon Aug 12 20:22:19 2013 KojiGeneralGeneralPZT Assembly #5/#6PZT Assembly #5/#6 were glued on Fri Aug
9th
They are removed from the fixture
  
  542   Tue May 16 13:07:11 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - DC Response Qualitative Results, Batch 112 May 2023, Downs 227

Stephen, Camille, Thejas

We completed a first batch of PZT
  
  533   Tue May 2 12:49:43 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - First measurement attempt[Stephen, Camille, Thejas]

A running log of our efforts from
Monday 1 May. Data continues to be placed
  
  534   Thu May 4 11:39:19 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - First measurement attemptEfforts from Tuesday through Thursday Wednesday,
02 through 04 May, are described below.

The main outcomes were:
  
  536   Fri May 5 18:37:31 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - First measurement attempt[Thejas, Camille, Stephen]

In Downs 227 on 05 May 2023

We took the following actions:
 Shadow_Sensor_Stage_Calibration_plot_PD_smaller_beam_20230505.pngupdated_setup_smaller_beam_spectrum_analyzer_20230505.jpg 
  532   Mon May 1 13:30:40 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - PD Calibration[Stephen, Camille, Thejas, with support
from Luis]

Calibration reattempted
 pd_pzt_dc_response_setup_image_20230426.jpgShadow_Sensor_Stage_Calibration_plot_PD_20230427.png 
  528   Wed Apr 26 13:23:00 2023 StephenOpticsCharacterizationPZT DC Response with Shadow Sensor - QPD Calibration[Stephen, Camille, Thejas, with support
from Marie, Dean, Luis]

We setup a shadow sensor! (Attachment
 qpd_dc_response_setup_image_20230425.jpgShadow_Sensor_Stage_Calibration_plot_20230426.png 
  562   Mon Jul 17 10:15:56 2023 Camille MakaremElectronicsCharacterizationPZT Reliability Test Results (part 1 of 2)[Camille, Thejas, Stephen]

Results for PZT reliability tests:

Batch 1: SN37, SN38, SN39, SN44
 10x 
  564   Wed Jul 19 08:38:07 2023 Camille MakaremElectronicsCharacterizationPZT Reliability Test Results (part 2 of 2)Results for PZT reliability test:
Batch 3: SN31, SN32, SN35, SN40, SN45
 Thermal_31-32-35.PNGThermal_40-45.PNGTemps_31-32-35_40-45.PNGDriveVoltage_31-32-35-40-45.PNGPXL_20230713_183834301.jpg 
  148   Sat Jul 6 17:10:07 2013 KojiMechanicsCharacterizationPZT Response analysisAnalysis of the PZT scan / TF data taken
on May 31st and Jun 1st.
[DC scan]
 PZT_Scan.pdfL1OMC_PZT_Response.pdf 
  374   Thu Sep 5 15:40:42 2019 shrutiOpticsConfigurationPZT Sub-AssemblyAim: To find the combinations
of mounting prism+PZT+curved mirror to build
two PZT sub-assemblies that best minimises
 Diagrams_SubAssembly.pdfC10_C13_Combinations.pdfPlots_Config_Tolerance.pdf 
  102   Mon Apr 8 11:49:18 2013 KojiMechanicsCharacterizationPZT actuator tested at LLOTest result of the PZTs by Valera and Ryan
PZT  Length Angle
 #
  [nm/V] [urad/um]
 11  14.5   17.6
  
  104   Mon Apr 8 21:11:14 2013 KojiOpticsGeneralPZT assembly gluing[Jeff, Zach, Koji] 
PZT assembly gluing
Glue gun -> to be returned to
  
  106   Tue Apr 9 13:56:09 2013 KojiOpticsGeneralPZT assembly post gluing / pre baking pictures 
  
  77   Sat Mar 23 13:34:14 2013 KojiOpticsGeneralPZT assembly prototype glued 
Prototype
PZT assembly
 P3223322.jpgP3223323.jpgP3233336.jpgP3233348.jpg 
  202   Tue Jul 8 18:54:54 2014 KojiMechanicsCharacterizationPZT characterizationEach PZT was swept with 0-150V 11Hz triangular
wave.
Time series data for 0.2sec was recorded
 PZT_Scan.pdfI1OMC_PZT_Response.pdf 
  314   Fri Feb 1 12:52:12 2019 KojiMechanicsGeneralPZT deformation simulationA simple COMSOL simulation was run to see
how the PZT deforms as the voltage applied.

Use the geometry of the ring PZT
 pzt.png 
  156   Thu Aug 22 15:40:15 2013 KojiElectronicsConfigurationPZT endurance test[Koji, Jeff]
Background
In response to the failure of one
 P8214340.jpgP8214337.jpgIR_0457.jpgIR_0461.jpg 
  157   Fri Aug 23 19:24:32 2013 KojiElectronicsConfigurationPZT endurance test (II)The
PZT tests were finished with the conclusion
that the PZT won't be damaged with our expected
 PZT_shaking.png 
  618   Thu Aug 24 16:09:46 2023 Camille MakaremOpticsGeneralPZT length-to-angle coupling[Camille, Thejas]

We checked the length-to-angle coupling
 PZT2.jpgPZT1.jpg 
  545   Fri Jun 2 13:28:09 2023 Camille MakaremElectronics PZT op-lev measurementsThe op-lev setup was modified slightly
(picture attached). The He-Ne laser was replaced
with one with a lower divergence angle. The
 PXL_20230602_224339446.jpgPXL_20230602_224359795.jpg 
  328   Thu Apr 11 12:15:31 2019 KojiMechanicsConfigurationPZT sub assy mirror orientations   PZT_subassy.pngPZT_subassy.pdf 
  312   Thu Jan 10 20:45:00 2019 KojiOpticsCharacterizationPZT test cableAs OMC SN002 already has the PZTs connected
to the Mighty-Mouse connector, a test cable
with a female mighty-mouse connector was
 OMC_PZT_wiring.pdf 
  203   Thu Jul 10 01:39:38 2014 KojiElectronicsGeneralPZT wireRich came to the OMC lab. Pins for the
mighty mouse connector were crimped on the
4 PZT wires.
 P7096669.JPG 
  5   Thu Jun 21 03:07:27 2012 ZachOpticsConfigurationParameter selection / mode definitionEDIT 2 (ZK): As with the   geom_bowtie.pnggeom_non-bowtie.png 
  17   Mon Aug 13 17:01:35 2012 KojiCleanGeneralParticle CountsAug 13, 2012 / 0.5um 1000~2000/(0.1 cu
ft) / 0.7um   400-600/(0.1 cu ft)
by ATF particle counter (MET ONE 227A)
  