  277   Tue May 16 19:05:18 2017 KojiOpticsConfigurationOMC SN002 fix - temporary opticsWorking on the SN002 OMC fix. Checked the
inventory. I think I am using C8 mirror as
the new temporary CM1 and PZT24 as the new
  
  281   Fri Jun 23 01:58:11 2017 KojiOpticsGeneralOMC #002 Repair - CM1 gluing[Alena, Koji]

Jun 21: Alena and Koji
worked on gluing of the CM1 mirror on the
 6x 
  282   Fri Jun 23 10:55:07 2017 KojiOpticsGeneralDust layer on black glass beam dumps?I wondered why the black glass beam dumps
looked not as shiny as before. It was in
fact a layer of dusts (or contaminants) accumulated
 black_glass_dust.JPG 
  283   Sat Jul 1 15:29:57 2017 KojiOpticsGeneralBlack glass cleaning / Final bonding for the emergency repair for OMC #002[Alena, Koji] 

Report of the work on June
30.
 DSC_0347.jpgDSC_0348.jpgDSC_0350.jpgDSC_0352.jpgDSC_0354.jpg 
  291   Thu Feb 22 20:21:02 2018 KojiOpticsCharacterizationaLIGO EOM testPOSTED
to 40m ELOG
  
  292   Mon Apr 2 17:27:04 2018 KojiOpticsCharacterizationaLIGO EOM test2nd optical test http://nodus.ligo.caltech.edu:8080/40m/13725   
  294   Sat May 5 22:51:04 2018 KojiOpticsGeneral3IFO EOM Optical testThe 3IFO EOM test performed at
the 40m. Result: 40m
ELOG 13819
  
  295   Tue May 15 19:53:45 2018 KojiOpticsGeneralEOM Q comparisonQs' were estimated with a lorentzian
function (eye fit)

  
  297   Wed May 30 17:44:23 2018 KojiOpticsCharacterization3IFO EOM surface check3IFO EOM dark microscope images courtesy
by GariLynn and Rich

Attachment1/2: Hole #1
 IMG_5756.JPGIMG_5757.JPGIMG_5758.JPGIMG_5759.JPGLooking_at_Hole2.png 
  308   Sun Sep 23 19:42:21 2018 KojiOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirror[Koji Gautam]


With Gautam's help,
I ran a coating design code for an HR mirror
 reflectivities.pngtransmission.pngphase_diff.pngphase_difference_histogram.png 
  309   Thu Sep 27 20:19:15 2018 AaronOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirrorI started some analytic calculations of
how OMC mirror motion would add to the noise
in the BHD. I want to make some prettier
  
  310   Thu Nov 1 19:57:32 2018 AaronOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirrorI'm still not satisfied/done with the
solution to this, but this has gone too long
without an update and anyway probably someone
  
  311   Thu Jan 10 20:42:54 2019 KojiOpticsCharacterizationFSR / HOM Test of OMC SN002OMC SN002 = Former LHO OMC
which CM1 was destroyed by the lock loss
pulse in 2016. This OMC needs to be optically
  
  312   Thu Jan 10 20:45:00 2019 KojiOpticsCharacterizationPZT test cableAs OMC SN002 already has the PZTs connected
to the Mighty-Mouse connector, a test cable
with a female mighty-mouse connector was
 OMC_PZT_wiring.pdf 
  313   Sat Jan 12 22:49:11 2019 KojiOpticsCharacterizationPM-SM patch cable mode cleaning effectMode
cleaning capability of an optical fiber was
measured. The conclusion
 fiber_mode_cleaning.pdf 
  315   Sat Feb 2 16:17:13 2019 KojiOpticsCharacterizationSummary: OMC(001) HOM structure recalculationEach peak of the transfer function measurement
was fitted again with a complex function:

 OMC_HOM_130531.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_HOM.pdf 
  316   Sat Feb 2 20:03:19 2019 KojiOpticsCharacterizationSummary: OMC(002) HOM structure recalculation (before mirror replacement)OMC (002)
History: Measurement date
2013/10/11, Installed to L1 2013/XX
 OMC_HOM_131011.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf 
  317   Sat Feb 2 20:28:21 2019 KojiOpticsCharacterizationSummary: OMC(003) HOM structure recalculationOMC (003)
History: Measurement date
2014/7/5, Stored for I1, Installed to H1
 OMC_HOM_140705.pdfHOM_PZTV_PZT1_0V.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf 
  318   Sat Feb 2 20:35:02 2019 KojiOpticsCharacterization Summary: OMC(002) HOM structure recalculation (after mirror replacement) OMC (002) after repair
History:Mirror replacement
after the damage at H1. Measurement date
 OMC_HOM_190110.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT.pdf 
  322   Fri Apr 5 01:07:18 2019 KojiOpticsCharacterizationOMC(002): transmitted beam imagesThere was a concern that the transmission
from CM1 has additional fringes. The shape
of the transmitted beams from CM1, CM2, and
 CM1trasns.pngCM2trasns.pngFM2trans2.png 
  323   Fri Apr 5 01:08:17 2019 KojiOpticsCharacterizationOMC(002): DCPD / QPD alignmentThe beam height in the cavity became totally
different from the previous one and the shims
needed to be much thicker than before. This
 IMG_7521.JPGIMG_7529.JPGIMG_7539.JPGIMG_7541.JPG 
  324   Fri Apr 5 20:50:54 2019 KojiOpticsCharacterizationOMC(002): QPD alignmentQPD#             
QPD1      
QPD2
 P_20190405_215906.jpgP_20190405_215927.jpg 
  336   Mon Apr 15 21:11:49 2019 PhilipOpticsCharacterizationOMC(004): PZT testing for spare OMC[Koji, Philip]

Today we tested the functionality
of the four remaining PZTs (11,12,13 and
  
  337   Tue Apr 16 11:36:36 2019 KojiOpticsCharacterizationOMC(004): PZT testing for spare OMCAttachment 1: Shadow sensor
setup for the PZT displacement test

Attachment 2:
 9x 
  338   Tue Apr 16 16:35:09 2019 KojiOpticsConfigurationOMC(004): Glass breadboard selectionD1200105 SN006 was selected as
the breadboard for OMC(004).
The reason is the best parallelism
 BB_selection.pdf 
  340   Tue Apr 16 16:52:36 2019 KojiOpticsConfigurationOMC(004): B Mirror selectionWe are going to use B6 for the
DCPD BS (BS2), and B1 for the QPD BS (BS3).
Their role can not
 B_Mirror_selection.pdf 
  341   Tue Apr 16 17:24:56 2019 KojiOpticsConfigurationOMC(004): E Mirror selectionWe are going to use E6, E9, E11, and E14
for BS1, SM1, SM2, and SM3. They (and E18)
are all very similar.
 E_Mirror_selection.pdf 
  342   Tue Apr 16 21:16:11 2019 KojiOpticsCharacterizationOMC(004): PZT testing for spare OMCAfter having dug into the past email, it
turned out that these wires were the ones
already replaced from the original teflonwires.
  
  345   Wed Apr 17 10:30:37 2019 PhilipOpticsGeneralOMC optical set-up day 1[Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
  
  346   Thu Apr 18 20:47:54 2019 JoeOptics OMC initial alignment and locking[Joe, Phillip, Koji, Stephen]

*draft post, please add anymore
info if I missed something*
 IMG_7676.JPGIMG_7666.JPGIMG_7670.JPGIMG_7883.JPGIMG_7882.JPG 
  347   Fri Apr 19 09:21:07 2019 PhilipOptics Cleaning of OMC opticsach[Joe, Phillip, Koji,
Stephen]

Work from 17.04.2019
 IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG 
  349   Fri Apr 19 11:34:19 2019 KojiOptics OMC initial alignment and lockingThe spot on CM1 was found displaced by
3.4mm (horiz.) and 3.0mm (vert.)
in the upper right direction looking from
 misalignment1.pdf 
  350   Sat Apr 20 00:50:12 2019 KojiOpticsCharacterizationOMC(004): Spot positionsSimilarly to OMC
ELOG 349 the spot positions after the
replacement of CM2 were measured (Attachment
 misalignment2.pdfmisalignment3.pdf 
  353   Tue Apr 23 10:21:12 2019 JoeOpticsConfigurationMoving the spots to the centre of the curved mirrors[Koji,Philip, Liyuan, Joe]

CM1:

We moved the curved mirrors to
 FSR_detuned_locking.pdfCM1_IMG_7702.JPGCM2_IMG_7704.JPG 
  354   Wed Apr 24 13:58:51 2019 JoeOpticsCharacterizationOMC power budget and UV Epoxy Bonding of BS1[koji,philip,joe,liyuan,stephen]

need to add spot positions.

Mirrors: PZT11,PZT22, A14, A5
  
  355   Thu Apr 25 15:05:19 2019 JoeOpticsCharacterizationLooking at PZT HOM spacing dependance and thinking about workflow[koji, joe]

The template or glass breadboard
was wobbling, and we noticed that the caivty
  
  356   Wed May 1 15:40:46 2019 KojiOpticsCharacterizationOMC(004): Spot positions and the scatteringTried a few things.

1. Replaced CM1 (PZT ASSY
#10=M21+PZT#22+C12) with PZT ASSY #7 (=M1+PZT#13+C13)
 misalignment.pdf 
  357   Fri May 3 11:06:28 2019 KojiOpticsCharacterizationOMC(004): Spot positions and the scatteringExperiment on 5/1
- CM1 right knob was moved 1div (10um)
backward such that the spots were better
 misalignment.pdf 
  359   Thu May 9 17:35:07 2019 KojiOpticsGeneralAlignment strategyNotes
on the OMC cavity alignment strategy

- x3=1.17 γ + 1.40 δ, x4=1.40
 T1500060_OMC_Optical_Testing_Procedure.pdf 
  360   Thu May 9 18:10:24 2019 KojiOpticsCharacterizationOMC(004): Spot position scan / power budget(Now the CCD image is captured as a movie
and the screen capture is easier!)

Various spot positions
 190508.pngscattering_spots_CM1.png 
  363   Mon May 20 19:53:17 2019 KojiOpticsConfigurationDCPD high power testWe want to perform a damage test of OMC
DCPDs with high power beam. The OMC DCPD
is the 3mm InGaAs photodiodes with high quantum
 BIAS.pdfP_20190520_204822.jpg 
  364   Wed May 22 07:31:37 2019 KojiOpticsConfigurationCamera test (DCPD high power test)C30665 (3mm) camera test. The camera was
Canon PowerShot G7X MkII. Exposure 1/15s,
F 5.6, ISO 125, MF (~the closest), no zoom.
 20190521201838_IMG_7939_2.jpg 
  365   Thu May 23 01:42:46 2019 KojiOpticsCharacterizationC30665 high power testAn Excelitas C30665 PD with the
cap removed (SN07 in Case H slot #2) was
exposed to the beam with the optical power
 C30665_high_power_test.pdfpd_surface.jpg 
  366   Thu May 23 23:27:38 2019 KojiOpticsCharacterizationIGHQEX3000 high power testLaserComponents IGHQEX3000 (Cage
B2: Serial# B1-23) was exposed to the beam
with the optical power from 1.6mW to 332mW.
 HQEPD_high_power_test.pdfpd_images.png 
  367   Tue May 28 12:14:20 2019 StephenOpticsGeneralCM PZT Assembly Debonding of EP30-2 in Acetone[LiyuanZ, StephenA]

Downs B119

Summary:
 8x 
  369   Mon Jul 1 12:38:49 2019 KojiOpticsCharacterizationA and M prisms perpendicularity measurement[Stephen, Koji]

The perpendicularity of
some of the A and M prisms were tested.
 6x 
  370   Mon Jul 1 12:49:42 2019 KojiOpticsCharacterizationScattering measurement of A and C mirrorsLiyuan's scattering measurement for
the A and C mirrors.
 omc_cm_tis_062419.pdfomc_prism_tis_062419.pdf 
  371   Thu Aug 22 12:35:53 2019 StephenOpticsCharacterizationWedging of the debonded PZTs 2019 AugustWedge and thickness measurements of PZTs
12 and 13 took place after debonding and
cleaning - results are shown in the first
 IMG_4775.JPGIMG_4770.JPG 
  372   Fri Aug 23 11:11:44 2019 shrutiOpticsCharacterizationFinding the curvature bottomI attempted to fit the data taken
by Koji of the beam spot precession at the
CCD in order to find the location of the
 CircleFit.pdfSineFit.pdf 
  373   Thu Aug 29 11:51:49 2019 shrutiOpticsCharacterizationWedging of the debonded PZTs - CalculationUsing the measurements of PZTs 12,13 taken
by Stephen, I estimated the wedging angle
and orientation following Section 2.3.1 of
 PZT_Wedging_Results.pdfPZT_Wedging_Calc.pdf 