Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab)
|
Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out
| +
Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test    
| +
Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal
| +
Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning
| +
Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning
|
Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery
| +
Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets 
| +
Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement
| +
Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler
| +
Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement
| +
Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs
| +
Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks
|
Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced
| +
Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2  
| +
Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements
| +
Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand
| +
Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 
| +
Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint
| +
Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1)    
| +
Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  
| +
Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3)  
| +
Thu Apr 18 20:47:54 2019, Joe, Optics, , OMC initial alignment and locking    
|
Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking 
| +
Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR 
|
Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors  
|
Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1
|
Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow
|
Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status
| +
Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table
| +
Thu Sep 27 20:19:15 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
| +
Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
|
|