Entry  Sat Feb 2 20:28:21 2019, Koji, Optics, Characterization, Summary: OMC(003) HOM structure recalculation OMC_HOM_140705.pdfHOM_PZTV_PZT1_0V.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf
OMC (003)
History: Measurement date 2014/7/5, Stored for I1, Installed to H1 2016/8 upon damage on 002
Entry  Fri Jun 27 18:51:33 2014, Koji, General, General, Supply 
PTOUCH TAPE (12mm white) x 2
9V batteries
Entry  Fri Nov 11 19:07:48 2022, Koji, Supply, General, Supply Order 
Clean Supply Ordered


TexWipe TX8410 AlphaSat Vectra Alpha 10 50 sheets x 12 pk  (VWR TWTX8410)
Mask KIMTECH PURE®
M3 Pleat-Style Face Masks 50 masks x 10 pk (VWR 15628-213)
Stainless Pan x3 (VWR 10193-562)
Ansell Accutech Latex Gloves 6.5
Entry  Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting 20201008214515_IMG_0152.jpg20201008214519_IMG_0153.jpg20201008214536_IMG_0154.jpg20201008220955_IMG_0155.jpg20201008221019_IMG_0156_2.jpg
To spare some room on the optical table, I wanted to mount the two TFT monitor units on the HEPA enclosure frame.
I found some Bosch Rexroth parts (# 3842539840) in the lab, so the bracket was taken for the mount. This swivel head works very well. It's rigid
and still the angle is adjustable.
    Reply  Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting 
The image flipping of the display unit was fixed. The vendor told me how to fix it.

- Open the chassis by the four screws at the side.
- Look at the pass-through PCB board between the mother and display boards.
Entry  Mon Jul 23 17:15:14 2012, Koji, Clean, General, Talking with Margot 
I consulted with Margot about the cleaning of the optics

    Optics are considered as a clean object. Large dusts can be removed by ionized N2 flow etc.
    Barrel of optics can be wiped
with Acetone.
    Optical surfaces are best to be cleaned by First Contact.
    A peek
Entry  Thu Mar 28 03:37:07 2013, Zach, Optics, Configuration, Test setup input optics progress OMC_test_setup_IO.jpg2013-03-27_05.48.20.jpg2013-03-28_02.29.36.jpg
[Lisa, Zach]
Last night (Tuesday), I finished setting up and aligning most of the input optics for the OMC characterization setup. See the diagram below, but
the setup consists of:
Entry  Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO  
The 3rd (LIO) OMC was shipped out to LHO on Friday (Jul 18) Morning.
At LHO
- All of the on-breadboard cables should be attached and tied down.
Entry  Wed Jul 5 16:59:44 2017, Koji, General, General, The OMC #002 was packed DSC_0360.JPG
[Stephen Koji]

The OMC #002 was packed for the transportation to Downs.

===> And transported to Downs 227 on Jul 6th.
    Reply  Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs Q3000_dark_noise_81.pdfQ3000_dark_noise_82.pdfQ3000_dark_noise_83.pdfQ3000_dark_noise_84.pdf
The dark noise levels of the four Q3000 QPDs were measured with FEMTO DLPCA200 low noise transimpedance amp.

The measurement has been done in the audio frequency band. The amp gain was 10^7 V/A. The reverse bias was set to be 5V and the DC output of
the amplifier was ~40mV which corresponds to the dark current of 4nA. It is consistent with the dark current measurement.
    Reply  Tue Nov 24 10:45:07 2020, gautam, Electronics, Characterization, The dark noise of the Q3000 QPDs 
I see that these measurements are done out to 100 kHz - I guess there is no reason to suspect anything at 55 MHz which is where this QPD will be reading
out photocurrent given the low frequency behavior looks fine? The broad feature at ~80 kHz is the usual SR785 feature I guess, IIRC it's got to do
with the display scanning rate.
    Reply  Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs 
The amplifier BW was 400kHz at the gain of 1e7 V/A. And the max BW is 500kHz even at a lower gain. I have to setup something special to see the RF band
dark noise.
With this situation, I stated "the RF dark noise should be characterized by the actual WFS head circuit." in the 40m ELOG.
    Reply  Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler fiber_beam_profile.pdf
The profile of the beam incident on the fiber input

The fiber input was deflected by a 45deg mirror. The beam profile was measured with WincamD. The beam was too strong (~60mW) even at the smallest
pump power (ADJ -50) of the NPRO. So the two ND20 filters were added to the lens right before the 45 deg mirror and the camera.
Entry  Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out IMG-5203.jpg
The table width was an inch too large compared to the door width. We need to tilt the table and it seemed too much for us. Let's ask the transportation
for handling.

Photo courtesy by Juan
Entry  Wed Jan 2 07:35:55 2013, Koji, Optics, Characterization, Thickness of a curved mirror 
Measured the thickness of a curved mirror:
Took three points separated by 120 degree.
S/N: C2, (0.2478, 0.2477, 0.2477) in inch => (6.294, 6.292, 6.292) in mm
Entry  Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy 
Masks / Wipes => done
Entry  Mon Jul 7 01:36:03 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
    PZT AC response
    Reply  Thu Jul 10 08:34:57 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
   
Entry  Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List 
Facility

    Work
    
        Replacing wooden work benches
        
    
       W60" x H28-34" x D30" 
    Reply  Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg
Shipping preparation for the LLO trip

Started July 15, 2022 and finished Aug 30. So it took ~1.5 months (with a
couple weeks of break)


Class B special tools
Entry  Wed Jun 20 20:37:45 2012, Zach, Optics, Configuration, Topology / parameter selection 8x
EDIT (ZK): All the plots here were generated using my MATLAB
cavity modeling tool, ArbCav
Entry  Fri May 26 21:53:20 2017, Koji, General, Configuration, Trans RF PD setup 
Recent work

- DC output of the trans RF PD was connected to the BNC patch panel. => Now CH4 of the scope is monitoring this signal

- The RF sweep signal from the network analyzer is connected to the power combiner for the EOM drive via the SMA patch panel.
    Reply  Tue Jun 6 00:49:48 2017, Koji, General, Configuration, Trans RF PD setup 
Last week, I further worked on the RF system to install 20dB coupler on the agilent unit and setup the R channel. This allowed me to make the FSR/TMS
measurement of the OMC.

And today several optical improvement has been done.
    Reply  Tue Jun 6 22:00:36 2017, Koji, General, Configuration, Trans RF PD setup 
- Replaced the PZT with the one used from the beginning. This must be PZT #21. After the replacement, the spot positions look very good. I even went
up. So I decided this is the configuration to proceed to the gluing. The CM1 mirror has the HR arrow at the top.

- The input beam was realigned w.r.t. the OMC.
    Reply  Mon Nov 21 19:13:35 2022, Koji, General, General, Transmission measurement (2nd deep cleaning of OMC #1) PXL_20221122_030736513.jpgOMC_loss.pdf
OMC Transmission measurement after the 2nd deep cleaning

The 2nd deep cleaning didn't improve the transmission. (See Attachment 2)
The measured loss was 0.044+/-0.002
Entry  Fri May 31 14:07:54 2013, Koji, Optics, Characterization, Transverse Mode Spacing measurement afte the baking  Cav_scan_response_130530_Pitch.pdfCav_scan_response_130530_Yaw.pdf
Measurement for pitch
Free Spectral Range (FSR): 264.9703 +/− 0.0007 MHz
Cavity roundtrip length: 1.131419 +/− 0.000003 m
Entry  Mon Aug 22 12:58:16 2016, Koji, General, General, UV bond samples -> Garilynn 
- FS base + Mounting Prism

- FS or SF2 1/2" piece + FS or SF2 1/2" piece

- FS? plate + FS or SF2 1/2" piece + FS or SF2 1/2" piece + FS? plate
Entry  Thu Feb 7 23:01:45 2013, Koji, Optics, Characterization, UV epoxy gluing test 
 [Jeff, Yuta, Koji]
Gluing test with UV-cure epoxy Optocast 3553-LV-UTF-HM
- This glue was bought in the end of October (~3.5 months ago).
Entry  Mon Apr 1 03:23:48 2013, Koji, Optics, General, UV power calibration 
[Koji Lisa Jeff Zach]
Eric G bought a UV power meter from American Ultraviolet.
Our UV illuminator was calibrated by this power meter.
Entry  Sun Sep 6 16:50:51 2015, Koji, Electronics, General, Unit test of the EOM/AOM Driver S1500118 P9037810.JPGRF_AM_spectra.pdf
TEST Result: S1500118

Additional notes

- Checked the power supply. All voltages look quiet and stationary.
Entry  Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references 
Nicolas Smith,
LIGO Document T0900383-v1 
3mm Photodiode Characterization for Enhanced LIGO
Entry  Wed Nov 7 01:28:20 2012, Koji, Optics, Characterization, Wedge angle test (A1) wedge_measurement.pngwedge_measurement_setup.png
Wedge angle test
Result: Wedge angle of Prism A1: 0.497 deg +/- 0.004 deg

 
Entry  Sat Jan 19 20:47:41 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator autocollimator_wedge_measurement.pdf
The wedge angle of the prism "A1" was measured with the autocollimator (AC).
The range of the AC is 40 arcmin. This means that the mirror tilt of 40arcmin can be measured with this AC.
This is just barely enough to detect the front side reflection and the back side reflection.
Entry  Mon Feb 4 00:39:08 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage autocollimator_wedge_measurement.pdf
Method:

    Mount the tombstone prism on the prism mount. The mount is fixed on the rotation stage.
    Locate the prism in front of the
autocollimator.
    Find the retroreflected reticle in the view. Adjust the focus if necessary.
    Confirm that the rotation of the
    Reply  Wed Feb 6 02:34:10 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage 
Measurement:

    A6:   α = 0.665 deg, β = +3.0 arcmin (1.5 div up)
    A7:   α = 0.635 deg, β =  
0.0 arcmin (0.0 div up)
    A8:   α = 0.623 deg, β = - 0.4 arcmin (-0.2 div up)
    A9:   α =
    Reply  Fri Mar 1 23:52:18 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage 
Measurement:

    E1:   α =  0.672 deg, β = +0.0  arcmin (0 div up)
    E2:   α =  0.631 deg, β = - 0.3  arcmin
(-0.15 div down)
    E3:   α =  0.642 deg, β = +0.0  arcmin (0 div up)
    E4:   α =  0.659 deg, β
Entry  Thu Jan 10 18:37:50 2013, Koji, Optics, Characterization, Wedging of the PZTs PZT_wedging.pdf
Yesterday I measured the thickness of the PZTs in order to get an idea how much the PZTs are wedged.
For each PZT, the thickness at six points along the ring was measured with a micrometer gauge. 
The orientation of the PZT was recognized by the wire direction and a black marking to indicate the polarity.
    Reply  Thu Aug 29 11:51:49 2019, shruti, Optics, Characterization, Wedging of the debonded PZTs - Calculation PZT_Wedging_Results.pdfPZT_Wedging_Calc.pdf
Using the measurements of PZTs 12,13 taken by Stephen, I estimated the wedging angle and orientation following Section 2.3.1 of T1500060. The results
can be found in Attachment1 and is summarised as follows.

For PZT 12, PZT 13 respectively:
    Reply  Thu Aug 22 12:35:53 2019, Stephen, Optics, Characterization, Wedging of the debonded PZTs 2019 August IMG_4775.JPGIMG_4770.JPG
Wedge and thickness measurements of PZTs 12 and 13 took place after debonding and cleaning - results are shown in the first image (handwritten post-it
format).

These thickness measurements seem to have come back thinner than previous measurements. It is possible that I have removed some PZT material
Entry  Wed May 15 19:07:53 2019, Koji, Clean, General, What is this??? P_20190515_185602.jpgP_20190515_185844.jpg
Suddenly something dirty emerged in the lab. What is this? It looks like an insulation foam or similar, but is quite degraded and emits a lot of particulates.

This does not belong to the lab. I don't see piping above this area which shows broken insulation or anything. All the pipes in the room
are painted white.
Entry  Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery IMG_1102.JPG
The Windows laptop for WincamD/Beam'R2 (DELL Vostro3300) was not functional. 
- Windows 7 got stuck in the starting up process (Google "startup repair loop")
- The battery can't charge and the adapter connection is flaky
    Reply  Tue Nov 29 15:54:47 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery 
Aaron took the set to Cryo lab

 
Entry  Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!] 

    Work done
    
        Floor cleaning
[ELOG]
        Placing sticky
mats [ELOG]
        Label Maker
Entry  Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!] 

    Completed Work: Facility/Supplies
    
        Plug a big hole on the wall [ELOG]
        Purchasing work benches
Entry  Mon Dec 31 01:45:04 2012, Koji, General, General, Work completed in Nov and Dec [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov] [Dec]
Entry  Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!] 
Completed work of the previous months: [Jul] [Aug]
[Sep] [Oct] [Nov]
[Dec]
Entry  Mon Jul 2 15:27:31 2018, Rich Abbott, Electronics, General, Work on EOM (3rd IFO unit) EOM3_aLIGO_3rdIfo.JPG
Koji, Rich

We took apart the unit removed from the 3rd IFO (Unit serial number aLIGO #3, XTAL 10252004) to see what makes it tick.  Koji has done a
fine job of adding the plots of the impedance data to this log book.  Attached are some details of the physical construction showing the capacitor
Entry  Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools P8171968.jpgP8171969.jpg
Last Friday, new workbenches were installed. Vladimir got a new table and a cleanroom stool.
Entry  Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status preamp_arrangement.png
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation box: 250.8lb
Entry  Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373
ELOG V3.1.3-