Tue Mar 14 10:41:06 2023, Thejas , Optics, Characterization, A+ OMC curved mirror characterization
|
Tue Mar 14 12:12:41 2023, Koji , Optics, Characterization, A+ OMC curved mirror characterization
|
Tue Mar 14 18:24:03 2023, Thejas , Optics, Characterization, A+ OMC Curved mirror radius of curvature  
|
Tue Mar 14 20:06:03 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Wed Mar 15 15:28:24 2023, Thejas , Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Wed Mar 15 17:07:35 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Fri Mar 17 15:01:21 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Fri Mar 24 07:38:54 2023, Camille Makarem, Optics, Characterization, ROC measurements of the curved mirrors
|
Fri Mar 24 07:47:37 2023, Camille Makarem, Optics, Characterization, ROC measurements of the curved mirrors 
|
Tue Mar 28 11:21:27 2023, Camille Makarem, Optics, Characterization, Sagitta measurements of curved mirrors
|
Mon Apr 3 11:06:47 2023, Thejas , Optics, Characterization, Flat mirror flatness
|
Tue Apr 4 16:14:06 2023, Koji, Optics, Loan / Lending, C7 mirror to Downs
|
Wed Apr 5 22:09:30 2023, Koji, Facility, General, HEPA Enclosure extension  
|
Thu Apr 13 07:47:28 2023, Camille Makarem, Optics, Characterization, Zygo setup for curved mirror measurements
|
Fri Apr 14 15:52:53 2023, Camille Makarem, Optics, Characterization, Determining the curvature bottom of the curved mirrors
|
Fri Apr 14 16:36:29 2023, Thejas, Optics, Characterization, Determining the curvature bottom of the curved mirrors 21x
|
Mon Apr 17 17:56:25 2023, Thejas , Optics, Characterization, A+ OMC Piezos wedge angle 19x
|
Tue Apr 18 07:59:46 2023, Madeline Lesovsky, General, General, Test Cure Bake - Curved Mirror Subassembly Bonding 6x
|
Tue Apr 11 16:18:25 2023, Thejas, Optics, Characterization, A+ OMC Curved mirror radius of curvature  
|
Wed Apr 19 14:28:08 2023, Thejas, Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Mon Apr 24 15:29:48 2023, Camille Makarem, Optics, , summary of zygo setups 6x
|
Fri Apr 28 13:25:40 2023, Thejas , Optics, General, aLIGO OMC Unit-4 
|
Fri Apr 28 14:24:03 2023, Thejas , Optics, Characterization, A+ OMC Matching
|
Wed Apr 26 14:43:44 2023, Stephen, General, Loan / Lending, Borrowed Items for PZT DC Response Shadow Sensor Setup
|
Fri May 12 10:00:06 2023, Camille Makarem, General, Loan / Lending, Borrowed Items for PZT DC Response Shadow Sensor Setup
|
Mon May 15 14:20:03 2023, Thejas , Optics, Characterization, A+ OMC ROC 21x
|
Mon May 15 14:24:41 2023, Thejas , Optics, Characterization, A+ OMC ROC
|
Thu May 4 15:12:14 2023, Koji, General, Characterization, OMC (004): Final Testing
|
Tue May 16 10:26:12 2023, Koji, General, Characterization, OMC (004): Final Testing
|
Wed Apr 26 13:23:00 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - QPD Calibration 
|
Mon May 1 13:30:40 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - PD Calibration 
|
Tue May 2 12:49:43 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt
|
Thu May 4 11:39:19 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt
|
Fri May 5 18:37:31 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt 
|
Tue May 16 13:07:11 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - DC Response Qualitative Results, Batch 1
|
Tue May 23 16:30:09 2023, Thejas , Electronics, Characterization, A+ OMC Piezos LA coupling
|
Fri Jun 2 13:28:09 2023, Camille Makarem, Electronics, , PZT op-lev measurements 
|
Fri May 19 16:09:31 2023, Stephen, General, General, A+ OMC Build Progress, Week of 2023.05.15
|
Fri Jun 2 17:15:44 2023, Stephen, General, General, A+ OMC Build Progress, Weeks of 2023.05.22 and 2023.05.29
|
Thu Jun 15 13:13:57 2023, Koji, Electronics, Configuration, OMC (004) DCPD/QPD preparation
|
Wed Jun 21 02:07:24 2023, Koji, Electronics, Configuration, OMC(004) QPD adjustment
|
Sun Jun 25 21:04:35 2023, Koji, General, Characterization, Optical assembly/testing of OMC (004) completed   
|
Sun Jun 25 21:08:37 2023, Koji, General, Characterization, OMC (004) transported to Downs for cable furnishing 
|
Fri Jun 30 10:30:57 2023, Camille Makarem, Electronics, , Summary of DC response measurements 
|
Fri Jun 30 10:55:45 2023, Camille Makarem, Electronics, Characterization, Summary of PZT reliability test procedure
|
Thu Jul 6 10:19:23 2023, Thejas , General, Characterization, OMC Lab optic table
|
Mon Jul 10 16:09:35 2023, Koji, Optics, Characterization, OMC(004) FSR / Finesse 
|
Mon Jul 10 16:15:06 2023, Koji, Optics, Characterization, OMC(004) FSR / Finesse 
|
Mon Jul 10 20:23:47 2023, Koji, Optics, Characterization, OMC (004) Spot positions 10x
|
Thu May 11 10:46:17 2023, Thejas , General, Characterization, aLIGO OMC
|
Mon Jul 10 20:29:05 2023, Koji , General, Characterization, OMC(004) PZT characterization  
|
Mon Jul 10 20:52:19 2023, Koji, Optics, Characterization, OMC (004) TMS measurement  
|
Wed Jul 12 17:27:44 2023, Koji, General, General, Mitsutoyo Digital Caliper (100mm)
|
Thu Jul 13 00:38:47 2023, Stephen, Optics, Characterization, A+ OMC, PZT DC Response and Length to Angle before Curved Mirror Assy Batch 1 
|
Thu Jul 13 01:02:58 2023, Stephen, Optics, General, A+ OMC, Bonding of Curved Mirror Batch 1 16x
|
Mon Jul 17 10:15:56 2023, Camille Makarem, Electronics, Characterization, PZT Reliability Test Results (part 1 of 2) 10x
|
Wed Jul 19 08:38:07 2023, Camille Makarem, Electronics, Characterization, PZT Reliability Test Results (part 2 of 2)    
|
Wed Jul 19 11:00:56 2023, Thejas , Optics, General, A+ OMC Bonding
|
Tue Jul 18 17:34:45 2023, Thejas, Optics, General, A+ PZT sub-assemblies    
|
Wed Jul 19 14:26:17 2023, Koji, Optics, General, A+ PZT sub-assemblies
|
Thu Jul 20 14:14:49 2023, Thejas , Optics, General, A+ OMC bonding template alignment  
|
Fri Jul 21 00:07:03 2023, Thejas , Optics, General,
|
Fri Jul 21 00:23:35 2023, Thejas , Optics, General, A+ PZT subassembly glue sheets   
|
Thu Jul 20 14:28:53 2023, Thejas , Optics, General, A+ OMC optic bench beam layout 
|
Fri Jul 21 03:29:30 2023, Koji , Optics, General, A+ OMC optic bench beam layout
|
Fri Jul 21 13:42:10 2023, Thejas, Optics, General, A+ OMC Unit 1 Cavity Build  
|
Mon Jul 24 16:12:14 2023, Koji, Optics, General, A+ OMC Unit 1 Cavity Build  
|
Mon Jul 24 17:43:25 2023, Koji, Optics, General, A+ OMC Unit 1 Cavity Build
|
Mon Jul 24 17:39:06 2023, Thejas, Optics, General, A+ OMC Unit 1 Cavity Build
|
Tue Jul 25 11:03:13 2023, Thejas, Optics, General, A+ OMC Unit 1 Cavity Build
|
Tue Jul 25 23:39:07 2023, Thejas, Optics, General, A+ OMC unit 1: CM positions swapped
|
Wed Jul 26 12:14:53 2023, Camille Makarem, Optics, Configuration, Swapping Subassemblies
|
Wed Jul 26 15:01:26 2023, Madeline Lesovsky, Optics, General, Subassembly Bonding Effort - Oven Bake Profile Results   
|
Sat Jul 29 12:05:52 2023, Thejas , Optics, General, A+ OMC unit 1 build: Resonance achieved
|
Mon Jul 31 13:19:14 2023, Camille Makarem, General, General, plans for this week 31 July 2023
|
|