ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
420
|
Thu Jul 21 14:55:48 2022 |
Koji | General | General | Optics bonding for the backscatter measurement | The backscatter beam is supposed to appear
in the backpropagation path. The transmission
of the OMC has a couple of optics, it's |
|
421
|
Thu Jul 21 17:47:00 2022 |
Koji | General | General | The profile of the beam incident on the fiber input coupler | The profile of the beam incident on the
fiber input
The fiber input was deflected by |
|
422
|
Fri Jul 22 00:31:17 2022 |
Koji | General | General | OMC #002 backscatter measurement | Measure the power ratio between the forward-propagating
and reverse-propagating beams.
Place a small deflecting |
|
423
|
Fri Jul 22 17:41:01 2022 |
Koji | General | General | SRS LCR meter SRS720 returned to Downs | SRS LCR meter SRS720 was returned to Downs
as before.
|
|
424
|
Fri Jul 22 17:47:38 2022 |
Koji | General | General | C&B request for the reinforcement blocks | OMC Reinforcement blocks
1. P/N D1600316; Version v4; Type
01; Qty 30; Source Chemistry Machine Shop |
|
425
|
Mon Jul 25 18:25:04 2022 |
Koji | General | General | A/C Filter was replaced |
New filter PN
Grainger
TK70457312T Mini-Pleat Air Filter, |
|
426
|
Tue Jul 26 00:01:59 2022 |
Koji | General | General | OMC #002 delamination check 2 | More epoxy delamination check:
DCPD R (Attachment 1):
Found half delaminated |
  |
427
|
Tue Jul 26 00:12:58 2022 |
Koji | General | General | High QE PD: QE measurements | - Installed the High QE PDs to OMC #002
B1-22@Cage B1 was
installed to the transmission DCPD
B1-23@Cage |
|
428
|
Wed Jul 27 10:09:51 2022 |
Koji | General | General | 4+4 wire clamp in hand | Regarding: D1200971
- 4 CLASS A wire clamp obtained |
|
429
|
Wed Jul 27 10:34:09 2022 |
Koji | General | General | High QE PD: QE measurements 2 | - DLPCA-200 trans-impedance amplifier was
calibrated.
Keithley source meter 2450 |
 |
430
|
Wed Jul 27 10:34:30 2022 |
Koji | General | General | OMC #002 Protective FirstContact Paint | The optical surfaces were coated with FirstContact
to keep them clean / somewhat protected during
the transportation. |
|
431
|
Wed Jul 27 23:52:18 2022 |
Koji | General | General | OMC #002 Cable bracket replacement (1) | Parts
check
- D1300052-V3 SN001 is going to |
    |
432
|
Thu Jul 28 00:28:15 2022 |
Koji | General | General | OMC #002 Cable bracket replacement (2) | Connector
unmounting
- (Attachment 1) |
  |
433
|
Thu Jul 28 00:46:47 2022 |
Koji | General | General | Subject: OMC #002 Cable bracket replacement (3) | Checking the spare parts
- Conclusion for OMC#2:
need PEEK cable |
  |
3
|
Wed Jun 20 00:10:53 2012 |
Koji | Facility | General | Hole on the wall was patched | |
|
14
|
Wed Aug 1 19:35:00 2012 |
Koji | Facility | General | Floor cleaned / Workbench being built / Table top defect | -
The floor of the room was cleaned and waxed!
- |
  |
15
|
Sat Aug 11 00:59:14 2012 |
Koji | Facility | General | Laser Safety Barrier | It seemed that a laser safety barrier was
installed today!?
|
|
19
|
Wed Aug 22 20:16:43 2012 |
Koji | Facility | General | Workbenches have been installed / Clean room stools | Last Friday, new workbenches were installed.
Vladimir got a new table and a cleanroom
stool. |
 |
46
|
Wed Dec 26 14:33:33 2012 |
Koji | Facility | General | Lase Interlock wired | Two switches are connected in series. |
  |
57
|
Tue Jan 22 11:10:25 2013 |
Koji | Facility | General | Eyeware storage and hooks for the face shields are installed | A carpenter has come to install the eyeware
storage and hooks for the face shields. |
|
75
|
Sat Mar 23 02:32:23 2013 |
Koji | Facility | General | N2 cylinder delivered | Preparation for ionized N2 blow
- 99.9998% N2 cylinder delivered
(ALPHAGAZ 2 grade by AIR LIQUIDE) ALPHAGAZ |
|
288
|
Fri Sep 8 15:14:05 2017 |
Koji | Facility | General | Preparation for the plumbing work | [Steve, Aaron, Koji]
We've finished the preparation
for the forthcoming plumbing work on (nominally) |
7x |
391
|
Mon Aug 10 15:34:04 2020 |
Koji | Facility | Loan / Lending | Glue bake oven | Black and Decker Glue Baking Oven came
back to the OMC lab on Aug 10, 2020, Georgia
had lent the unit for the SAMS assembly/testing. |
|
412
|
Thu Jun 23 21:03:33 2022 |
Koji | Facility | General | Moving the small optical table to CAML (TCS Lab) | I've cleared the small optical table
and wondered how to move it out of the room.
Fortunately, the north side of the big table |
|
25
|
Tue Oct 9 05:03:15 2012 |
Koji | Electronics | General | OMC Test Electronics Setup | |
 |
36
|
Thu Nov 8 19:47:55 2012 |
Koji | Electronics | Configuration | Solder for PZTs | Rich saids:
I |
|
72
|
Fri Mar 15 02:15:45 2013 |
Koji | Electronics | Characterization | Diode testing | Diode testing
o Purpose of the measurement
- Test Si QPDs (C30845EH) for ISC |
|
73
|
Sun Mar 17 21:59:47 2013 |
Koji | Electronics | Characterization | Diode testing ~ DCPD | - For the dark noise measurement, the lid
of the die-cast case should also contact
to the box for better shielding. This made |
|
78
|
Sat Mar 23 16:36:15 2013 |
Koji | Electronics | Characterization | Diode QE measurement | Quantum efficiencies of the C30665GH
diodes were measured.
- The diode was biased by the FEMTO |
 |
131
|
Thu May 30 14:38:42 2013 |
Koji | Electronics | General | Cable fitting | Yesterday Jeff and Chub worked on the cabling
of the OMC. It turned out that the gender
of the cable connectors |
|
156
|
Thu Aug 22 15:40:15 2013 |
Koji | Electronics | Configuration | PZT endurance test | [Koji, Jeff]
Background
In response to the failure of one |
   |
157
|
Fri Aug 23 19:24:32 2013 |
Koji | Electronics | Configuration | PZT endurance test (II) | The
PZT tests were finished with the conclusion
that the PZT won't be damaged with our expected |
|
203
|
Thu Jul 10 01:39:38 2014 |
Koji | Electronics | General | PZT wire | Rich came to the OMC lab. Pins for the
mighty mouse connector were crimped on the
4 PZT wires. |
|
224
|
Wed Jul 15 22:23:17 2015 |
Koji | Electronics | AM Stabilized EOM Driver | E1400445 first look | This is not an OMC related and even not
happening in the OMC lab (happening at the
40m), but I needed somewhere to elog... |
 |
225
|
Sat Jul 18 11:37:21 2015 |
Koji | Electronics | AM Stabilized EOM Driver | D0900848 power board ~ oscillation issue solved | Power Supply Board D0900848 was
oscillating. Here is the procedure how the
issue was fixed. |
6x |
227
|
Wed Jul 22 09:43:01 2015 |
Koji | Electronics | AM Stabilized EOM Driver | Power supply test of the EOM/AOM Driver | Serial Number of the unit: S1500117
Tester: Koji Arai |
|
228
|
Wed Jul 22 10:15:14 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF test of the EOM/AOM Driver S1500117 | 7) Make sure the on/off RF button works,
=> OK
8) Make sure the power output doesn't |
|
229
|
Sat Jul 25 17:24:11 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF test of the EOM/AOM Driver S1500117 | (Calibration for Attachment 5 corrected
Aug 27, 2015)
Now the test procedure |
7x |
230
|
Tue Jul 28 18:36:50 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF test of the EOM/AOM Driver S1500117 | Final Test Result of S1500117:
https://dcc.ligo.org/LIGO-S1500117
After some staring the |
  |
231
|
Mon Aug 10 02:11:47 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 | This is an entry for the work on Aug 3rd.
LIGO
DCC E1500151 |
  |
232
|
Mon Aug 10 11:39:40 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 | Entry for Aug 6th, 2015
I faced with difficulties to operate
the RF AM detectors. |
|
233
|
Mon Aug 10 11:57:17 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 | Spending some days to figure out how to
program CPLD (Xilinx CoolRunner II XC2C384).
I learned that the JTAG cable which |
|
234
|
Mon Aug 10 12:09:49 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 | Still suffering from a power supply
issue!
I have been tracking the issues |
|
235
|
Thu Aug 20 01:35:01 2015 |
Koji | Electronics | General | OMC DCPD in-vacuum electronics chain test | We wanted to know the transimpedance
of the OMC DCPD at high frequency (1M~10M).
For this purpose, the OMC DCPD chain |
 |
236
|
Wed Aug 26 11:31:33 2015 |
Koji | Electronics | General | OMC DCPD in-vacuum electronics chain test | The noise levels of the output pins (pin1/pin6)
are measured. Note that the measurement is
done with SE. i.e. There was no common mode |
|
237
|
Fri Aug 28 01:08:14 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 ~ Calibration | Worked on the calibration of the
RF AM Measurement Unit.
The calibration concept is as follows: |
 |
238
|
Fri Aug 28 02:14:53 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 ~ 37MHz OCXO AM measurement | In order to check the noise level
of the RFAM detector, the power and cross
spectra for the same signal source |
|
239
|
Sun Sep 6 16:50:51 2015 |
Koji | Electronics | General | Unit test of the EOM/AOM Driver S1500118 | TEST
Result: S1500118
Additional |
 |
240
|
Tue Sep 8 10:55:31 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 ~ 37MHz OCXO AM measurement | Test sheet: https://dcc.ligo.org/LIGO-E1400445
Test Result (S1500114): https://dcc.ligo.org/S1500114 |
|
245
|
Tue Dec 15 13:38:34 2015 |
Koji | Electronics | Characterization | EOM Driver linearity check | Linearity of the EOM driver was
tested. This test has been done on Nov 10,
2015. |
 |