+
Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps
|
Thu Jul 10 01:39:38 2014, Koji, Electronics, General, PZT wire
| +
Thu Jul 10 08:34:57 2014, Koji, General, General, To Do
|
Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO
| +
Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending
|
Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom
|
Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components
|
Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed
| +
Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending
| +
Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending
| +
Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending    
|
Wed Feb 18 21:51:23 2015, Koji, General, General, Notes on OMC Transportation Fixtures & Pelican
| +
Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending
| +
Thu Aug 20 01:35:01 2015, Koji, Electronics, General, OMC DCPD in-vacuum electronics chain test 
| +
Wed Aug 26 11:31:33 2015, Koji, Electronics, General, OMC DCPD in-vacuum electronics chain test
|
Sun Sep 6 16:50:51 2015, Koji, Electronics, General, Unit test of the EOM/AOM Driver S1500118 
|
Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate
|
Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory
|
Mon Aug 15 10:09:10 2016, Koji, General, General, Prev H1 OMC shipped to CIT
|
Mon Aug 22 12:58:16 2016, Koji, General, General, UV bond samples -> Garilynn
| +
Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending
|
Fri Sep 9 19:43:32 2016, Koji, Optics, General, D1102211 OMC Diode Mount Glass Block went to Downs
| +
Mon Nov 21 21:19:20 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling
| +
Wed Dec 7 19:18:10 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling
| +
Wed Dec 7 21:18:35 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned 
| +
Thu Dec 8 21:17:09 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned
| +
Thu Jan 19 20:57:53 2017, Koji, Supply, General, Purchase
| +
Thu Feb 16 17:23:12 2017, Koji, Supply, General, Purchase
|
Fri Jun 23 01:58:11 2017, Koji, Optics, General, OMC #002 Repair - CM1 gluing 6x
|
Fri Jun 23 10:55:07 2017, Koji, Optics, General, Dust layer on black glass beam dumps?
|
Sat Jul 1 15:29:57 2017, Koji, Optics, General, Black glass cleaning / Final bonding for the emergency repair for OMC #002    
|
Sat Jul 1 21:33:18 2017, Koji, General, General, Some purchase notes
|
Wed Jul 5 16:59:44 2017, Koji, General, General, The OMC #002 was packed
|
Fri Sep 8 15:14:05 2017, Koji, Facility, General, Preparation for the plumbing work 7x
|
Mon Nov 27 20:24:24 2017, Koji, General, General, A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm 6x
|
Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December
|
Sat May 5 22:51:04 2018, Koji, Optics, General, 3IFO EOM Optical test
|
Tue May 15 19:53:45 2018, Koji, Optics, General, EOM Q comparison
|
Mon Jul 2 15:27:31 2018, Rich Abbott, Electronics, General, Work on EOM (3rd IFO unit)
|
Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion
| +
Sun Sep 23 19:42:21 2018, Koji, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror   
| +
Thu Sep 27 20:19:15 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
| +
Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
|
Fri Feb 1 12:52:12 2019, Koji, Mechanics, General, PZT deformation simulation
|
Thu Apr 4 20:07:39 2019, Koji, Supply, General, Purchase
|
Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed  
| +
Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding
| +
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
|
Thu Apr 11 21:22:26 2019, Koji, Mechanics, General, OMC(004): PZT sub-assembly gluing 
|
Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking 
|
|