166
|
Wed Sep 4 22:22:54 2013 |
Koji | General | General | H1 OMC wrapped and moved to the bake lab. | [Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven |
|
167
|
Sat Sep 7 17:20:56 2013 |
Koji | General | General | OMC/PD lab optical table wrapping | [Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table |
|
168
|
Fri Sep 13 15:09:20 2013 |
Koji | General | General | Sprinkler installation: done | A sprinkler head was installed on the HEPA
enclosure. The head is covered with a plastic
cap. |
 |
173
|
Tue Oct 22 17:17:59 2013 |
Koji | General | General | H1OMC cabling | [Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables. |
|
174
|
Wed Oct 23 02:45:07 2013 |
Koji | General | General | PD realignment | DCPD2 got misaligned during the cable installation.
The PD alignment procedure have been gone
through again. |
|
175
|
Mon Nov 4 19:43:56 2013 |
Koji | General | General | H1OMC Packed | H1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC. |
|
176
|
Thu Nov 21 00:05:35 2013 |
Koji | General | General | H1OMC electronics arrangement | Checked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side) |
|
177
|
Tue Dec 10 16:41:51 2013 |
Koji | General | General | To Buy | Masks / Wipes => done |
|
178
|
Tue Feb 18 18:58:38 2014 |
Koji | General | General | LHO H1 OMC installation photos | LHO OMC installation photos
|
|
179
|
Fri Feb 28 19:50:11 2014 |
Koji | General | General | Misalignment ABCD matrix for the aLIGO OMC | Relationship between mirror misalignment
and cavity mode shift was calculated.
The technique described in T0900647 |
|
182
|
Thu Apr 17 21:39:25 2014 |
Koji | Optics | General | More alignment | STORY:
- The cavity mirrors have scattering
spots. The cavity alignment should have been |
|
187
|
Thu Jun 19 23:16:50 2014 |
Koji | Optics | General | All of the prisms have been glued | - All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been
glued |
|
188
|
Fri Jun 20 18:59:12 2014 |
Koji | Optics | General | All of the invar blocks have been glued | All of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed. |
|
189
|
Mon Jun 23 21:54:16 2014 |
Koji | Optics | General | All of the gluing completed | The bottom-side templates were removed.
The last beam dump was removed
TODO |
|
190
|
Tue Jun 24 18:43:15 2014 |
Koji | General | General | ICS entries for the OMC baking/assembly | For baking:
Assembly Name aLIGO Output
Mode Cleaner |
|
191
|
Fri Jun 27 12:29:50 2014 |
Koji | General | General | OMC baking | The OMC went into the oven at around 2PM
on Thursday. It will be baked at 80degC for
48 hours. |
|
192
|
Fri Jun 27 18:51:33 2014 |
Koji | General | General | Supply | PTOUCH TAPE (12mm white) x 2
9V batteries |
|
193
|
Wed Jul 2 16:41:43 2014 |
Koji | General | General | OMC baking | OMC is back from the oven today.
To Do:
Optical tests |
|
194
|
Wed Jul 2 18:58:42 2014 |
Koji | General | General | Beam dump delamination | While the OMC breadboard was being inspected,
it was found that two out of five black-glass
beam dumps showed sign of delamination. |
|
195
|
Thu Jul 3 17:45:18 2014 |
Koji | General | General | Beam dump delamination | Here is the resolution.
I'll apply fillets of EP30-2 along
the edges of the black glass (See figure). |
|
196
|
Sun Jul 6 02:45:56 2014 |
Koji | Optics | General | FSR Measurement | 3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a
HWP. |
|
200
|
Mon Jul 7 01:36:03 2014 |
Koji | General | General | To Do | Optical tests
Cleaning
Power Budget
|
|
201
|
Tue Jul 8 04:08:06 2014 |
Koji | General | General | Expoxy reapplication for beam dumps | Firstly, the excess epoxy was removed using
a cleaned razor balde
|
|
203
|
Thu Jul 10 01:39:38 2014 |
Koji | Electronics | General | PZT wire | Rich came to the OMC lab. Pins for the
mighty mouse connector were crimped on the
4 PZT wires. |
|
204
|
Thu Jul 10 08:34:57 2014 |
Koji | General | General | To Do | Optical tests
Cleaning
Power Budget
|
|
212
|
Sun Jul 20 17:20:39 2014 |
Koji | General | General | The 3rd (LIO) OMC was shipped out to LHO | The 3rd (LIO) OMC was shipped out to LHO
on Friday (Jul 18) Morning.
At LHO |
|
214
|
Thu Jul 31 15:07:53 2014 |
Koji | General | General | Item lending | Tara: Laser Safety goggle ->
Returned
Evan: |
|
215
|
Mon Aug 4 18:59:50 2014 |
Koji | General | General | A memorandom | On breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808 |
|
216
|
Tue Aug 5 13:03:25 2014 |
Koji | General | General | Missing cable components | DCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282
PD faster: 92210A07 Qty 4: MCMASTER |
|
219
|
Sat Jan 17 11:40:04 2015 |
Koji | General | General | 3rd OMC completed | Jan 15, 2015 3rd OMC completed
The face caps of the DCPD/QPD cables
were installed (Helicoils inserted) |
|
220
|
Fri Jan 30 19:31:08 2015 |
Koji | General | General | Item lending | Gabriele:
PZT HV Amp
Evan: |
|
221
|
Tue Feb 3 18:23:49 2015 |
Koji | General | General | Item lending | - The laser was removed and shipped to
LHO today.
- UV illuminator / fused silica |
|
222
|
Wed Feb 4 20:07:24 2015 |
Koji | General | General | Item lending | Shipment to MIT (L. Barsotti, J. Miller)
1. UV Illuminator (LESCO Super
Spot MK III) |
    |
223
|
Wed Feb 18 21:51:23 2015 |
Koji | General | General | Notes on OMC Transportation Fixtures & Pelican | LLO has one empty OMC transportation fixture.
LHO has one empty OMC transportation
fixture. |
|
226
|
Tue Jul 21 20:20:12 2015 |
Koji | General | General | Item lending | Kate (ATF)
- 4ch color oscilloscope (Tektronix)
- Chopper controller |
|
235
|
Thu Aug 20 01:35:01 2015 |
Koji | Electronics | General | OMC DCPD in-vacuum electronics chain test | We wanted to know the transimpedance
of the OMC DCPD at high frequency (1M~10M).
For this purpose, the OMC DCPD chain |
 |
236
|
Wed Aug 26 11:31:33 2015 |
Koji | Electronics | General | OMC DCPD in-vacuum electronics chain test | The noise levels of the output pins (pin1/pin6)
are measured. Note that the measurement is
done with SE. i.e. There was no common mode |
|
239
|
Sun Sep 6 16:50:51 2015 |
Koji | Electronics | General | Unit test of the EOM/AOM Driver S1500118 | TEST
Result: S1500118
Additional |
 |
249
|
Tue Dec 29 12:15:46 2015 |
Koji | General | General | Glasgow polarizer passed to Kate | The Glasgow polarizer was passed to Kate
on Dec 17, 2015. |
|
262
|
Fri Jul 22 22:24:05 2016 |
Koji | General | General | HQEPD inventory | As of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016 |
|
264
|
Mon Aug 15 10:09:10 2016 |
Koji | General | General | Prev H1 OMC shipped to CIT | Previous H1 OMC shipped from LHO to CIT
https://ics-redux.ligo-la.caltech.edu/JIRA/browse/Shipment-8196 |
|
265
|
Mon Aug 22 12:58:16 2016 |
Koji | General | General | UV bond samples -> Garilynn | - FS base + Mounting Prism
- FS or SF2 1/2" piece + FS
or SF2 1/2" piece |
|
268
|
Fri Sep 9 14:34:31 2016 |
Koji | General | General | Item lending | To 40m
First Contact Kit by Calum
Class A Kapton sheets |
|
269
|
Fri Sep 9 19:43:32 2016 |
Koji | Optics | General | D1102211 OMC Diode Mount Glass Block went to Downs | D1102211 OMC Diode Mount Glass Block (11pcs)
have been given to Calum@Downs |
|
270
|
Mon Nov 21 21:19:20 2016 |
Koji | Optics | General | LWE NPRO Laser / Input Optics / Fiber Coupling | - About 1.5 month ago, an 700mW LWE NPRO
has been brought to OMC Lab.
- The SOP can be found here. |
|
271
|
Wed Dec 7 19:18:10 2016 |
Koji | Optics | General | LWE NPRO Laser / Input Optics / Fiber Coupling | FIber Input Mount 132deg
Fiber output mount 275deg
-> 525mW P: 517mW S: 8mW extinction |
|
272
|
Wed Dec 7 21:18:35 2016 |
Koji | General | General | OMC placed on the table / the beam roughly aligned | The OMC mode matching sled was fixed on
the nominal part of the table. Then the OMC
was located at the nominal position marked |
 |
273
|
Thu Dec 8 21:17:09 2016 |
Koji | General | General | OMC placed on the table / the beam roughly aligned | The OMC cavity was locked. The alignment
was precisely adjusted. The mode matching
was optimized by the lens positions. The |
|
274
|
Thu Jan 19 20:57:53 2017 |
Koji | Supply | General | Purchase | Ordered:
Office Depot
v AA battery Qty. 24 |
|
275
|
Thu Feb 16 17:23:12 2017 |
Koji | Supply | General | Purchase |
BNC Patch Panel
8x
Amphenol Connex 112443 / Isolated BNC FEMALE
TO FEMALE BULKHEAD ISOLATED ADAPTER - 50 |
|