Entry  Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing 
H1 OMC Cavity side optics was glued on the breadboard
Curved mirror gluing
- Applied the UV glues to CM1/CM2 prisms.
Entry  Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing P8304368.JPGP8304370.JPG
The Invar Mounting Blocks were glued on the breadboard.
Serial number #1/2/5/6/7/8 -> I1 OMC cable side
Serial number #9/10/11/12 -> H1 OMC cavity side
Entry  Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed 
[Koji Jeff]
H1 OMC All Gluing completed
5 Glue H1 beam dumps (UV)
Entry  Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab. 
[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven (Oven F) and running without the actual OMC.
Entry  Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping P9064377.JPG
[Koji Jeff]
In order to prepare for the splinkler installation on the HEPA enclosure, the table with the optics was wrapped with Ameristat sheets.
    Reply  Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done P9134379.jpgP9134378.jpg
A sprinkler head was installed on the HEPA enclosure. The head is covered with a plastic cap.
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
[Chub, Jeff, Koji]
We worked on the wiring and routing of the cables.
- The cables for the PZT was installed first. 
Entry  Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment 
DCPD2 got misaligned during the cable installation. The PD alignment procedure have been gone through again.
Cavity locking 
- Removed the FC layers for the cavity related mirrors.
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
H1OMC PZT connector was replaced with the correct one. This was the final step for H1OMC.
Jeff and I packed the OMC and put it in the perikan case. It will be shipped tomorrow.
The other tools are also packed in the other box. Here is the list of the items
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Checked the PZT arrangement: Mighty Mouse Pin1&2 -> PZT2 (DCPD side), Mighty Mouse Pin3&4 -> PZT1 (QPD side)
DCPD response: 
Illuminate DCPD1 (T) -> DCPD B responded in MEDM
Entry  Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy 
Masks / Wipes => done
Entry  Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos 
LHO OMC installation photos
Entry  Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC misalignment.pdf
Relationship between mirror misalignment and cavity mode shift was calculated.
The technique described in T0900647 by Sam Waldman was used.
The angles and displacement of the mirrors and beams are defined in the attached figure.
Entry  Thu Apr 17 21:39:25 2014, Koji, Optics, General, More alignment 
STORY:
- The cavity mirrors have scattering spots. The cavity alignment should have been scanned to find a cavity mode to have lowest loss possible. 
  BTW, We only have horizontal dof for the alignment scan.
Entry  Thu Jun 19 23:16:50 2014, Koji, Optics, General, All of the prisms have been glued P6196525.JPG
- All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been glued

TODO
    Reply  Fri Jun 20 18:59:12 2014, Koji, Optics, General, All of the invar blocks have been glued 
All of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed.
    Reply  Mon Jun 23 21:54:16 2014, Koji, Optics, General, All of the gluing completed 
The bottom-side templates were removed.
The last beam dump was removed
TODO
Entry  Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly 
For baking:

    Assembly Name aLIGO Output Mode Cleaner
    Assembly Number D1201439
    Reply  Fri Jun 27 12:29:50 2014, Koji, General, General, OMC baking P6266536.jpg
The OMC went into the oven at around 2PM on Thursday. It will be baked at 80degC for 48 hours.
The RGA result will be obtained on Monday.
Link to the ICS entry
Entry  Fri Jun 27 18:51:33 2014, Koji, General, General, Supply 
PTOUCH TAPE (12mm white) x 2
9V batteries
    Reply  Wed Jul 2 16:41:43 2014, Koji, General, General, OMC baking 
OMC is back from the oven today.
To Do:
Optical tests
Entry  Wed Jul 2 18:58:42 2014, Koji, General, General, Beam dump delamination beamdump_delamination.png
While the OMC breadboard was being inspected, it was found that two out of five black-glass beam dumps showed sign of delamination.
(attached photos).
The base of the each beam dump is a fused silica disk (25mm dia.). The black glass pieces are bonded to the disk. The bond is EP30-2 
    Reply  Thu Jul 3 17:45:18 2014, Koji, General, General, Beam dump delamination beamdump_delamination_solution.png
Here is the resolution.
I'll apply fillets of EP30-2 along the edges of the black glass (See figure). 
In order to allow the air escape from the gap, the inside of the V will not be painted. 
Entry  Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement finesse_measurements_log.pdf
3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a HWP.
Entry  Mon Jul 7 01:36:03 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
    PZT AC response
    Reply  Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps 
Firstly, the excess epoxy was removed using a cleaned razor balde
Entry  Thu Jul 10 01:39:38 2014, Koji, Electronics, General, PZT wire P7096669.JPG
Rich came to the OMC lab. Pins for the mighty mouse connector were crimped on the 4 PZT wires.
We found the male 4pin mighty mouse connector in the C&B area.
The cable inventory was checked with ICS/DCC combo. It turned out that most of the on-board cables
    Reply  Thu Jul 10 08:34:57 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
   
Entry  Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO  
The 3rd (LIO) OMC was shipped out to LHO on Friday (Jul 18) Morning.
At LHO
- All of the on-breadboard cables should be attached and tied down.
Entry  Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending 
Tara: Laser Safety goggle -> Returned

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Entry  Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom 
On breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808
Entry  Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components 
DCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282
PD faster: 92210A07 Qty 4: MCMASTER #2-56 x .25 FHCS
Entry  Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed 
Jan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables were installed (Helicoils inserted)
PD7&10 swapped with PD11(for DCPD T) and PD12(DCPD R).
    Reply  Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending 
Gabriele:

PZT HV Amp

Evan:
    Reply  Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending 
- The laser was removed and shipped to LHO today.

- UV illuminator / fused silica fiber light guide / UV power meter / UV face shield (Qty 2) will be shipped to MIT.
They are CIT properties except for the illuminator.
    Reply  Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG
Shipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super Spot MK III)

2. UV Power meter (American Ultraviolet AIB1001) Caltech property C30140
Entry  Wed Feb 18 21:51:23 2015, Koji, General, General, Notes on OMC Transportation Fixtures & Pelican 
LLO has one empty OMC transportation fixture.

LHO has one empty OMC transportation fixture.

LHO has one OMC transportation fixture with 3IFO OMC in it.
    Reply  Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending 
Kate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
Entry  Thu Aug 20 01:35:01 2015, Koji, Electronics, General, OMC DCPD in-vacuum electronics chain test OMC_DCPD_Chain.pdfOMC_DCPD_Transimpedance.pdf
We wanted to know the  transimpedance of the OMC DCPD at high frequency (1M~10M).
For this purpose, the OMC DCPD chain was built at the 40m. The measurement setup is shown in Attachment 1.

- As the preamp box has the differential output (pin1 and pin6 of the last DB9), pomona clips were used to measure the transfer functions
    Reply  Wed Aug 26 11:31:33 2015, Koji, Electronics, General, OMC DCPD in-vacuum electronics chain test OMC_DCPD_OutputNoise.pdf
The noise levels of the output pins (pin1/pin6) are measured. Note that the measurement is done with SE. i.e. There was no common mode noise rejection.
Entry  Sun Sep 6 16:50:51 2015, Koji, Electronics, General, Unit test of the EOM/AOM Driver S1500118 P9037810.JPGRF_AM_spectra.pdf
TEST Result: S1500118

Additional notes

- Checked the power supply. All voltages look quiet and stationary.
Entry  Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate 
The Glasgow polarizer was passed to Kate on Dec 17, 2015.
Entry  Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory 
As of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016
Entry  Mon Aug 15 10:09:10 2016, Koji, General, General, Prev H1 OMC shipped to CIT 
Previous H1 OMC shipped from LHO to CIT

https://ics-redux.ligo-la.caltech.edu/JIRA/browse/Shipment-8196
Entry  Mon Aug 22 12:58:16 2016, Koji, General, General, UV bond samples -> Garilynn 
- FS base + Mounting Prism

- FS or SF2 1/2" piece + FS or SF2 1/2" piece

- FS? plate + FS or SF2 1/2" piece + FS or SF2 1/2" piece + FS? plate
    Reply  Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending 
To 40m

First Contact Kit by Calum

Class A Kapton sheets
Entry  Fri Sep 9 19:43:32 2016, Koji, Optics, General, D1102211 OMC Diode Mount Glass Block went to Downs 
D1102211 OMC Diode Mount Glass Block (11pcs) have been given to Calum@Downs
Entry  Mon Nov 21 21:19:20 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling 
- About 1.5 month ago, an 700mW LWE NPRO has been brought to OMC Lab.

- The SOP can be found here.

- The base was made for the beam elevation of 3" height. Four 1" pedestals were attached to rise the beam elevation to 4".
    Reply  Wed Dec 7 19:18:10 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling 
FIber Input Mount 132deg
Fiber output mount 275deg
-> 525mW P: 517mW S: 8mW extinction ratio: 0.016
Entry  Wed Dec 7 21:18:35 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned DSC_0082.jpgDSC_0084.jpg
The OMC mode matching sled was fixed on the nominal part of the table. Then the OMC was located at the nominal position marked by three poles.

The input periscope was adjusted to have the input beam roughtly centered on the OMC QPDs. This made the beam from FM2 aligned to the missing
CM1, and the beam just went through the hole of the mounting prism. Very promising!