ID Date Author Type Categoryup Subject Text Attachments
  27   Tue Oct 16 14:50:54 2012 jamie, jeffGeneralGeneralOMC breadboard/plate measurement dimensionsWe have measured the dimensions and mass
of the OMC glass plates/breadboards:

  
  28   Tue Oct 16 15:50:09 2012 KojiGeneralGeneralWork completed in August/September [!]
    Work done
   

        
  
  29   Tue Oct 16 15:51:01 2012 KojiGeneralGeneralPlan Update: October [!]Completed work of the previous months:
[Jul]
[Aug]
  
  30   Wed Oct 17 20:36:04 2012 KojiOpticsGeneralRoC test cavity lockedThe RoC test setup has been built on
the optical table at ATF.
 detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf 
  33   Wed Nov 7 20:21:42 2012 KojiGeneralGeneralWork completed in October [!]Completed work of the previous months:
[Jul]
[Aug]
  
  34   Wed Nov 7 20:44:11 2012 KojiGeneralGeneralPlan Update: November [!]Completed work of the previous months:
[Jul]
[Aug]
 OMC_Project_Schedule.pdf 
  37   Thu Nov 8 19:52:57 2012 KojiOpticsGeneralHow to apply UV epoxyKA's question:
Do
 UVepoxy.jpg 
  43   Thu Nov 29 21:18:23 2012 KojiOpticsGeneralOMC Mounting Prisms have come   PB293030.JPGPB293032.JPG 
  45   Wed Dec 19 18:47:03 2012 KojiCleanGeneralFirst Contact Training with MargotSteve and I visited Margot to have a training
session for application of First Contact
on optics.
  
  46   Wed Dec 26 14:33:33 2012 KojiFacilityGeneralLase Interlock wiredTwo switches are connected in series.  PC263073.jpgPC263074.jpgPC263075.jpg 
  47   Mon Dec 31 01:45:04 2012 KojiGeneralGeneralWork completed in Nov and Dec [!]Completed work of the previous months:
[Jul]
[Aug]
  
  48   Mon Dec 31 03:10:09 2012 KojiOpticsGeneralSolidWorks model of the OMC breadboard   D1201439_aLIGO_Breadboard_layout_assy_121224.pngD1201439_aLIGO_Breadboard_layout_assy_130105.easm 
  52   Sun Jan 6 23:22:21 2013 KojiMechanicsGeneralSolidWorks model of the OMC suspension    D0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.pngD0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.easm 
  57   Tue Jan 22 11:10:25 2013 KojiFacilityGeneralEyeware storage and hooks for the face shields are installedA carpenter has come to install the eyeware
storage and hooks for the face shields.
 P1223116.JPG 
  58   Tue Jan 22 17:56:32 2013 KojiMechanicsGeneralRotary stage selectionNewport UTR80

    Sensitivity: 4 arcsec
  
  61   Thu Feb 7 21:35:46 2013 KojiGeneralGeneralDmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40mDmass
borrowed the LB1005 servo amp from the OMC
lab.
 P2053119.jpgP2053120.JPG 
  69   Thu Mar 7 15:53:47 2013 KojiMechanicsGeneralOMC Transportation fixture, OMC PD/QPD mounts   P3073218.JPGP3073219.JPGP3073223.JPGP3073225.JPGP3073227.JPG 
  70   Thu Mar 14 17:06:21 2013 KojiMechanicsGeneralOMC SUS work @LLOEDIT (ZK): All photos on
Picasa. Also, I discovered that
 2013-03-14_16.03.40.jpg2013-03-14_16.04.07.jpg 
  71   Thu Mar 14 22:18:23 2013 KojiGeneralGeneralNew loans for the diode testALL
returned

Loan
from ATF:
  
  75   Sat Mar 23 02:32:23 2013 KojiFacilityGeneralN2 cylinder deliveredPreparation for ionized N2 blow
- 99.9998% N2 cylinder delivered
(ALPHAGAZ 2 grade by AIR LIQUIDE) ALPHAGAZ
 P3233349.jpg 
  76   Sat Mar 23 02:41:00 2013 KojiOpticsGeneralBlack glass beam dumps for the first OMCReceived black glass beam dumps from
MIT
- gluing by EP30-2 looks pretty fine.
 P3223314.JPGP3223319.jpgP3223320.jpg 
  77   Sat Mar 23 13:34:14 2013 KojiOpticsGeneralPZT assembly prototype glued 
Prototype
PZT assembly
 P3223322.jpgP3223323.jpgP3233336.jpgP3233348.jpg 
  79   Mon Mar 25 02:04:05 2013 KojiGeneralGeneralOMC building plan / procedure ~ WB18WB 18 March 

    Diode test
    
        Dark current
  
  80   Mon Mar 25 18:34:25 2013 KojiGeneralGeneralOMC building plan / procedure ~ Mar 25 Mon25 March (Mon): 
Inspect the test PZT assembly

    => Give it to Bob. 
  
  81   Mon Mar 25 19:31:16 2013 KojiOpticsGeneralOMC Top-side gluing[Koji Jeff Zach]  
AAA
 P3253353.jpgP3253372.jpgP3253394.jpgP3253400.jpg 
  82   Tue Mar 26 22:33:07 2013 KojiGeneralGeneralLoan for the OMC buildingLoan from PSL Lab
- 300mm mirror with Ultima mount
and pedestal
  
  83   Wed Mar 27 20:54:45 2013 KojiGeneralGeneralOMC building plan / procedure ~ Mar 26 Mon26 March (Tue):
- Curved mirror characterization
(Koji, done)
  
  84   Wed Mar 27 20:54:54 2013 KojiGeneralGeneralOMC building plan / procedure ~ Mar 27 Wed27 March (Wed)
- AOM drift investigation (Lisa,
Zach)
  
  85   Wed Mar 27 20:55:10 2013 KojiGeneralGeneralOMC building plan / procedure ~ Mar 28 Thu28 March (Thu): 

    Rebuild the bottom template
in the lab
    Place the bottom
  
  88   Mon Apr 1 03:13:41 2013 KojiOpticsGeneralFailure of PZT-glass joints[Koji, Jeff, Zach, Lisa]
We glued a test PZT-mirror assembly
last week in order to make sure the heat
  
  89   Mon Apr 1 03:23:48 2013 KojiOpticsGeneralUV power calibration[Koji Lisa Jeff Zach]
Eric G bought a UV power meter from
American Ultraviolet.
  
  90   Mon Apr 1 10:28:03 2013 KojiMechanicsGeneralAdditional UV blast for the top surface[Koji, Lisa, Jeff, Zach]

Jeffs concern after talking with the
 P3283483.JPGP3283459.jpgP3283473.JPG 
  91   Mon Apr 1 18:17:01 2013 KojiOpticsGeneralMirror curvature center testLocations of the curvature minimum
on the OMC curved mirrors have been measured.
 6x 
  93   Wed Apr 3 18:42:45 2013 KojiOpticsGeneralEP30-2 gluing testEP30-2 gluing test
  
  104   Mon Apr 8 21:11:14 2013 KojiOpticsGeneralPZT assembly gluing[Jeff, Zach, Koji] 
PZT assembly gluing
Glue gun -> to be returned to
  
  106   Tue Apr 9 13:56:09 2013 KojiOpticsGeneralPZT assembly post gluing / pre baking pictures 
  
  108   Thu Apr 11 15:10:22 2013 KojiGeneralGeneralOMC Progress[Zach, Jeff, Koji]

- Jeff configured the bottom
side template to have a nominal value
  
  110   Sat Apr 13 21:06:02 2013 KojiOpticsGeneralOMC Bottom-side: cavity glued[Jeff, Zach, Lisa, Koji]
Gluing of the cavity mirrors went
 Cav_scan_response_130412_Pitch.pdfCav_scan_response_130412_Yaw.pdf 
  111   Tue Apr 16 00:40:45 2013 KojiOpticsGeneralPD/QPD path gluing ~ preparation[Jeff Koji]
- Placed the optics on the PD/QPD
path
  
  115   Wed Apr 17 07:30:04 2013 KojiOpticsGeneralQPD path gluedYesterday,
all of the glass components for the QPD path
were glued.
  
  116   Thu Apr 18 11:43:59 2013 KojiGeneralGeneralMounting Glass Bracket Failure[Jeff, Koji]
- While we were working on the optics
alignment, one of the mounting brackets made
  
  118   Thu Apr 18 11:59:02 2013 KojiGeneralGeneralDCPD path gluing[Jeff, Koji]
DCPD path gluing
  
  119   Fri May 3 21:09:08 2013 KojiGeneralGeneralOMC is backL1 OMC is back on the table for the action
next week.
  
  122   Wed May 8 15:36:50 2013 KojiGeneralGeneralLatest OMC schedule
May
(done) Mon  6th:
Invar plate arrival / Spot position measurement
(done)
Tue  7th: Invar plate cleaning / Spot position
  
  123   Fri May 10 09:33:22 2013 KojiSupplyGeneralCOMSOL simulation on the glass bracket stress   COMSOL1.png 
  125   Mon May 13 14:59:16 2013 KojiMechanicsGeneralInvar shim gluingThe invar reinforcement shims were glued
on the glass brackets on the breadboard.
  
  126   Mon May 13 15:00:23 2013 KojiGeneralGeneralCurrent most reliable OMC scheduleMay
Tue 14th The OMC
given to Bob (Air bake & Vac bake)

Mon
20th The OMC received from Bob
        
  
  127   Tue May 14 19:06:00 2013 KojiCleanGeneralOMC BakingThe OMC is in the air bake oven now.
  
  128   Mon May 20 14:59:21 2013 KojiGeneralGeneralOMC is out from the ovenThe OMC came back to the table again.
No obvious change is visible: no
crack, no delamination
  
  129   Tue May 21 18:28:08 2013 KojiGeneralGeneralCurrent most reliable OMC schedule- The wrong Mighty Mouse connectors for
the PZT wires were prepared. The correct
ones are in the vacuum oven till Tuesday
  
ELOG V3.1.3-