40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 7 of 10  Not logged in ELOG logo
Entry  Mon Nov 21 21:19:20 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling 
- About 1.5 month ago, an 700mW LWE NPRO has been brought to OMC Lab.

- The SOP can be found here.

- The base was made for the beam elevation of 3" height. Four 1" pedestals were attached to rise the beam elevation to 4".
    Reply  Wed Dec 7 19:18:10 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling 
FIber Input Mount 132deg
Fiber output mount 275deg
-> 525mW P: 517mW S: 8mW extinction ratio: 0.016
Entry  Mon Sep 26 14:27:49 2022, Koji, General, General, LLO OMC ICS work 
OMC #001


ICS Link: https://ics.ligo-la.caltech.edu/JIRA/browse/ASSY-D1201439-1
Already
marked as disassembled
Removed two PDs

https://ics.ligo-la.caltech.edu/JIRA/browse/IHGQEX3000-0-00-A1-25
    Reply  Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG
Inspected the past LLO add-on mass configuration.

There are unknown masses at the DCPD side. It looks like a small SS mass with an estimated mass of 5g. But the DCC number is unknown.

We are going to add 10g on each corner as well as the damping aterial. We should be able to figure out the fastener / mass configuration.
    Reply  Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation balance_mass_config_LLO.pdf
Here is the balance mass info for the LLO OMC#001 analyzed from the photographs


Added masses are: 50+10g, 50+20, 10+20+5, and 20+20+10 for the mass right above FM1/CM1/FM2 and CM2, respectively.
The length
of the 1/4-20 screws seem L=3/4"~1"


If we attach the additional mass, longer 1/4-20 screws (1", 1" 1/8, 1" 1/4)
Entry  Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos 
LHO OMC installation photos
Entry  Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out CAM00011.jpgP6054027.JPG
[Koji, Jeff]
The L1 OMC finally sent out from Caltech!
Entry  Wed Jun 5 01:06:35 2013, Zach, General, Characterization, L1 OMC as-built diagram L1OMC_asbuilt.pdf
 D1300507
 
Entry  Fri Jun 10 17:12:57 2016, Koji, General, Configuration, L1 OMC DCPD replacement 
New DCPD(T) = A1-23
DCPD(T) = DCPDB: extracted and accomodated in CAGE-G SLOT1

New DCPD(R) = A1-25
Entry  Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding IMG_5216.JPGIMG_5215.JPG
The following items are presently staged at the 40m Bake Lab (see photo indicating current location) (noting items broght by Koji as well):


Bonding fixtures, now modified with larger washers to constrain springs, and with modification from OMC
elog 358.
Curved Mirrors and Tombstones as selected by Shruti in OMC elog 374.
PZTs
Entry  Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending 
Tara: Laser Safety goggle -> Returned

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
    Reply  Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending 
Gabriele:

PZT HV Amp

Evan:
    Reply  Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending 
- The laser was removed and shipped to LHO today.

- UV illuminator / fused silica fiber light guide / UV power meter / UV face shield (Qty 2) will be shipped to MIT.
They are CIT properties except for the illuminator.
    Reply  Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG
Shipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super Spot MK III)

2. UV Power meter (American Ultraviolet AIB1001) Caltech property C30140
    Reply  Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending 
Kate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
    Reply  Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending 
To 40m

First Contact Kit by Calum

Class A Kapton sheets
    Reply  Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending P_20200227_134755_vHDR_On.jpg
Item lending as per Ian's request: Particle Counter from OMC Lab to QIL

 
    Reply  Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending 
The particle counter came back to the OMC lab on Aug 10, 2020

 
Entry  Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing 
The invar reinforcement shims were glued on the glass brackets on the breadboard. 
We worked on the light side on May 10th and did on the dark side on May 13rd.
U-shaped holding pieces are used to prevent each invar shim to be slipped from the right place. 
Entry  Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan 
FEMTO DLPCA200 low noise preamp (brand new)

Keithley Source Meter 2450 (brand new) => Returned 11/23/2020

were brought to the OMC lab for temporary use.
Entry  Tue Aug 23 23:36:54 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC) 7x
1. Calum and GariLynn checking the CM1 defect from the front side.
2. Same as above
3. Close up of the defect
    Reply  Thu Aug 25 02:17:09 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC) 
Initial inspection results by Calum, et al.
https://dcc.ligo.org/LIGO-E1600268
Entry  Thu May 9 16:07:18 2019, Stephen, Mechanics, General, Improvements to OMC Bonding Fixture image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG
[Stephen, Koji]

As mentioned in eLOG 331, either increased thermal cycling or apparent improvements
in cured EP30-2 strength led to fracture of curved mirrors at unintended locations of bonding to the PEEK fixture parts.
Entry  Thu Oct 18 20:23:33 2012, Koji, Optics, Characterization, Improved measurement Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf
Significant improvement has been achieved in the RoC measurement.

    The trans PD has much more power as the BS at the cavity trans was replaced by a 50% BS. This covers the disadvantage of using the a
Si PD.
    The BB EOM has a 50Ohm terminator to ensure the 50Ohm termination at Low freq.
    The length of the cavity was changed
Entry  Mon Jul 2 12:29:01 2018, Koji, Electronics, Characterization, Impedances of individual components (3IFO EOM) impedance_coils.pdfimpedance_xtals.pdfq_coils.pdfcomponent_models.pdfliso_models.zip
[Rich Koji]

The impedances of the individual components from the 3IFO EOM (before modification) were tested.
Each component was modeled by LISO. The LISO model (in PDF and txt) are attached at the end of the entry.
    Reply  Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf
To know any anomaly to the junction capacitance of the QPD segments, the RF impedances were tested with a hand-made impedance measurement.
All segments look almost identical in terms of capacitance.

Measurement setup:
Entry  Thu May 23 23:27:38 2019, Koji, Optics, Characterization, IGHQEX3000 high power test HQEPD_high_power_test.pdfpd_images.png
LaserComponents IGHQEX3000 (Cage B2: Serial# B1-23) was exposed to the beam with the optical power from 1.6mW to 332mW. 
After each illumination, the dark current and the dark noise level were measured. Also the photo image of the PD surface was taken each time.

- No significant change of the dark current after each illumination.
Entry  Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly 
For baking:

    Assembly Name aLIGO Output Mode Cleaner
    Assembly Number D1201439
    Reply  Sun Jul 20 17:19:50 2014, Koji, Mechanics, Characterization, I1OMC vibration test ~ 2nd round 9x
Improved vibration measurement of the OMC
Improvement
- Added some vibration isolation. Four 1/2" rubber legs were added between the OMC bread board and the transport fixture (via Al foils).
Entry  Thu Jul 17 02:19:20 2014, Koji, Mechanics, Characterization, I1OMC vibration test 6x
Summary
- The breadboard has a resonance at 1.2kHz. The resonant freq may be chagned depending on the additional mass and the boundary condition.
- There is no forest of resonances at around 1kHz. A couple of resonances It mainly starts at 5kHz.
Entry  Sat May 17 07:40:14 2014, Koji, Optics, Characterization, I1OMC cavity mirrors glued Cav_scan_response_140516_Pitch.pdfCav_scan_response_140516_Yaw.pdf
I1OMC cavity mirrors were glued.
FSR = 264.82MHz => Lcav = 1.132m (nominal 1.132m)
TMS/FSR for Vpzt1=Vpzt2=0: 0.2185 (V) and 0.2196 (H) (nominal 0.219)
Entry  Thu Jul 10 23:22:28 2014, Koji, Optics, Characterization, I1OMC QPD 
QPD#              QPD1       QPD2
Housing#          #006       #007
Diode#            #50        #51
Entry  Fri Jul 11 00:06:33 2014, Koji, Optics, Characterization, I1OMC PD 
DCPD#             DCPD1      DCPD2
Housing#          #009       #010
Diode#            #07        #10
Entry  Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV) 
The glass components for the I1 OMC top side were glued by the UV glue.
Breadboard SN#4
Wire bracket SN#5/6/7/8
Entry  Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy UVepoxy.jpg
KA's question:
Do you know how to apply this epoxy? 
Do we need a plunger and a needle for this purpose?
Entry  Thu Nov 8 20:12:10 2012, Koji, Optics, Configuration, How many glass components we need for a plate 
Optical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)

    
        
             
Entry  Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched P6191706.jpg
 
    Reply  Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 IMG_1119.JPGIMG_1120.JPG
- DLPCA-200 trans-impedance amplifier was calibrated.
  Keithley source meter 2450 was connected to the amp. Provide current and read the output voltage with the precision digital voltage meter
(Agilent/Keysight).
    Reply  Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements IMG_1118.JPG
- Installed the High QE PDs to OMC #002


B1-22@Cage B1 was installed to the transmission DCPD
B1-23@Cage B1 was installed to the reflection
DCPD


Upon the installation, the legs of the PDs were cut by 3mm. Also, the tab of the PD could not be embedded in the DCPD housing.
Entry  Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory 
As of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016
Entry  Sat Mar 26 17:39:50 2016, Koji, Electronics, Characterization, HQEPD dark noise PD_dark_current.pdf
Dark noise measurement for 6 HQEPDs and 1 C30665. All of these showed sufficiently low dark current noise levels compared with the noise level of the
DCPD preamp. The measurement was limited by the input noise (ADC) noise of the FFT analyzer as the line noises were too big.

The measurement has been done with the transimpedance of 1e7. The bandwidth of the measurement was 50kHz.
Entry  Sun Mar 13 22:02:09 2016, Koji, Optics, Characterization, HQEPD QE measurement (direct comaprison) 
Direct comparison of the PD responsibities

We can expect 5% increase of the QE with the new PD. 


P-pol 10deg incident
Entry  Sat Mar 26 01:49:48 2016, Koji, Optics, Characterization, HQEPD QE QE1.pngQE2.png
Calibration of the transimpedance

Use KEITHLEY 2450 as a calibrated current source. Model 2450 has the current source accuracy of 0.020%+1.5uA at 10mA range. For 6mA current output,
the error is 3uA (0.05%).
Entry  Sun Jul 6 03:56:40 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf
Cavity FSR/TMS measurement (2014/7/5) with PZT voltages swept from 0V to 200V (50V step)
    Reply  Sun Jul 6 08:31:14 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept HOM_plot.pdf
3rd OMC, HOM diagram at PZT1=0V and PZT2=50V.
First coincidence with the carrier is the 32nd-order carrier mode. Very good.
Entry  Mon Jun 24 12:54:58 2019, Koji, Clean, General, HEPA BOOTH 
https://www.airscience.com/purair-flow-laminar-flow-cabinets
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Checked the PZT arrangement: Mighty Mouse Pin1&2 -> PZT2 (DCPD side), Mighty Mouse Pin3&4 -> PZT1 (QPD side)
DCPD response: 
Illuminate DCPD1 (T) -> DCPD B responded in MEDM
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
[Chub, Jeff, Koji]
We worked on the wiring and routing of the cables.
- The cables for the PZT was installed first. 
Entry  Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions DCPD1.pngDCPD2.pngQPD1.pngQPD2.png
Beam heights on the diodes

DCPD1: 14.459mm -> With 1.5mm shim, the beam will be 0.038mm too low.
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
H1OMC PZT connector was replaced with the correct one. This was the final step for H1OMC.
Jeff and I packed the OMC and put it in the perikan case. It will be shipped tomorrow.
The other tools are also packed in the other box. Here is the list of the items
ELOG V3.1.3-