ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
466
|
Fri Dec 2 23:58:33 2022 |
Koji | Optics | Characterization | OMC #1 cleaning for water soluble contaminants | The second trial of the water scrub
A bright scatter is visible on
FM1, so I tried water scrub on FM1. This |
 |
457
|
Tue Nov 15 10:58:53 2022 |
Koji | Optics | General | OMC #1 damaged black glass removal | [Camille, Koji]
The damaged black glass was removed
from the OMC breadboard leaving the glass |
   |
458
|
Tue Nov 15 11:12:24 2022 |
Koji | Optics | General | OMC #1 fogging on the AR side of BS1 cleaned | [Camille, Koji]
Photo of the BS1 AR cleaning process
Attachment 1: Before cleaning. |
   |
477
|
Thu Jan 26 23:46:13 2023 |
Koji | Optics | General | OMC #1 input beam dump bonding | A beam dump was stacked on the base of
the previous beam dump. The angle was determined
so that the main transmission goes through |
 |
475
|
Thu Jan 26 23:07:14 2023 |
Koji | Optics | General | OMC #4: Input beam dump bonding | [Camille, Koji]
During the second UV epoxy session,
we did not bond the input beam dump. This |
|
474
|
Thu Jan 26 22:57:19 2023 |
Koji | Optics | General | OMC #4: One Invar block bonded with tilt | [Camille, Koji]
The bottom side template was separated
into two pieces and successfully removed |
 |
483
|
Thu Feb 2 03:09:41 2023 |
Koji | Optics | General | OMC #4: One Invar block bonded with tilt | [Camille, Thejas, Koji]
We added a reinforcement bar at
the back of the invar block which had the |
 |
484
|
Sat Feb 4 03:16:10 2023 |
Koji | Optics | General | OMC #4: One Invar block bonded with tilt | The attached photo shows the resulting
bond spread.
|
|
479
|
Sat Jan 28 00:46:21 2023 |
Koji | Mechanics | General | OMC #4: Replaced the locks of the transport fixture | Yesterday, we noticed that we could not
close the transport fixture for OMC #4. We
could not fully rotate the knobs of the locks. |
|
476
|
Thu Jan 26 23:16:35 2023 |
Koji | Optics | Configuration | OMC #4: Top side bonding. | [Camille, Koji]
|
    |
471
|
Thu Jan 19 23:45:44 2023 |
Koji | Optics | General | OMC #4: cavity mirror bonding | [Koji, Camille]
We worked on the bonding of the
flat mirrors for the OMC cavity with UV epoxy. |
|
472
|
Mon Jan 23 19:51:20 2023 |
Koji | Optics | General | OMC #4: cavity mirror bonding | [Camille, Koji]
We continued to bond two CM mirrors
and the other two steering mirrors for QPD2. |
   |
319
|
Tue Mar 19 17:30:25 2019 |
Koji | General | Characterization | OMC (002) Test items | OMC #002 Optical tests
FSR
measurement (done, 2019/1/8-9, 2019/4/1)
|
|
325
|
Fri Apr 5 23:30:20 2019 |
Koji | General | General | OMC (002) repair completed | OMC(002)
repair completed
When the cable harness of OMC(004) |
  |
547
|
Thu Jun 15 13:13:57 2023 |
Koji | Electronics | Configuration | OMC (004) DCPD/QPD preparation | Work
log for June 14, 2023
Selected QPDs from the |
|
556
|
Mon Jul 10 20:23:47 2023 |
Koji | Optics | Characterization | OMC (004) Spot positions | Belated entry: OMC(004) Spot positions
(Jun 15, 2023)
Photographs of the spot positions |
10x |
558
|
Mon Jul 10 20:52:19 2023 |
Koji | Optics | Characterization | OMC (004) TMS measurement | Belated entry: OMC(004) TMS measurement
with the PZT voltages scanned (Jun 12/15,
2023) |
  |
482
|
Wed Feb 1 01:44:14 2023 |
Koji | General | General | OMC (004) plan | 2/1 2:30PM~ Bonding reinforcement (Last
EP30-2 gluing)
2/2 1:00PM~ Peripheral attachment |
|
550
|
Sun Jun 25 21:08:37 2023 |
Koji | General | Characterization | OMC (004) transported to Downs for cable furnishing | OMC (004) + the transport fixture was transported
to Downs 227 with the boxes for OMC cabling
hardware and DCPD/QPD connector parts. |
 |
595
|
Mon Aug 7 16:00:30 2023 |
Koji | General | General | OMC (004): Cable installation | The writing of this elog is still on going
[Dean, Stephen, Koji]
4th |
   |
535
|
Thu May 4 15:12:14 2023 |
Koji | General | Characterization | OMC (004): Final Testing |
FSR measurement (dip) -
done May 3, 2023
FSR
measurement (RFAM injection) - done |
|
541
|
Tue May 16 10:26:12 2023 |
Koji | General | Characterization | OMC (004): Final Testing |
FSR measurement (dip) -
done May 3, 2023
FSR
measurement (RFAM injection) - done |
|
596
|
Mon Aug 7 16:01:05 2023 |
Koji | General | General | OMC (004): Production completed | OMC (004) Production completed. The OMC
together with the transport fixture is still
placed at the 40m clean room. |
 |
127
|
Tue May 14 19:06:00 2013 |
Koji | Clean | General | OMC Baking | The OMC is in the air bake oven now.
|
|
387
|
Fri Dec 13 14:59:18 2019 |
Stephen | General | General | OMC Beam Dump Production Cure Bake | [Koji, Jordan, Stephen]
The beam dumps, bonded on Fri 06
Dec 2019, were placed in the newly tuned |
 |
388
|
Wed Dec 18 21:54:53 2019 |
Koji | General | General | OMC Beam Dump Production Cure Bake | The beamdumps were taken out from the oven
and packed in bags.
The bottom of the V are completely |
  |
393
|
Mon Sep 28 16:03:13 2020 |
rana | General | General | OMC Beam Dump Production Cure Bake |
are there any measurements of the BRDF
of these things? I'm curious how much
light is backscattered into the incoming |
|
394
|
Mon Sep 28 16:13:08 2020 |
Koji | General | General | OMC Beam Dump Production Cure Bake | According to the past backscatter test
of the OMC (and the black glass beamdump:
not V type but triangular type on a hexagonal-mount), |
|
110
|
Sat Apr 13 21:06:02 2013 |
Koji | Optics | General | OMC Bottom-side: cavity glued | [Jeff, Zach, Lisa, Koji]
Gluing of the cavity mirrors went |
 |
155
|
Thu Aug 22 15:34:03 2013 |
Koji | Optics | General | OMC Cavity side gluing | [Koji Jeff]
o BS1, FM1, FM2 prisms were glued
=> This fixed the unstability of |
|
235
|
Thu Aug 20 01:35:01 2015 |
Koji | Electronics | General | OMC DCPD in-vacuum electronics chain test | We wanted to know the transimpedance
of the OMC DCPD at high frequency (1M~10M).
For this purpose, the OMC DCPD chain |
 |
236
|
Wed Aug 26 11:31:33 2015 |
Koji | Electronics | General | OMC DCPD in-vacuum electronics chain test | The noise levels of the output pins (pin1/pin6)
are measured. Note that the measurement is
done with SE. i.e. There was no common mode |
|
623
|
Mon Sep 18 15:08:26 2023 |
Thejas | Optics | General | OMC HEPA enclosure filter fan speed | I went in lab today and turned the HEPA
filter (clsoe to the entrance) to high since
we are not doing any measurements at the |
|
586
|
Thu Aug 3 09:42:36 2023 |
Thejas | Optics | General | OMC Lab HEPA air filter noise | Koji mentioned that previously sarisfactory
particle count was not acheived with the
Med/Med HEPA filter setting once the enclosure |
|
487
|
Sat Feb 4 03:33:22 2023 |
Koji | General | General | OMC Lab Inventory | Attachment 1: North Cabinet 2nd from the
left
Attachment 2: North Cabinet 3rd |
  |
503
|
Tue Mar 7 23:00:16 2023 |
Thejas | Optics | Characterization | OMC Lab clean up | Today, Koji and I cleaned up the the lab
space and made some space on the
optical table for radius of curvature measurement |
 |
553
|
Thu Jul 6 10:19:23 2023 |
Thejas | General | Characterization | OMC Lab optic table | [Camille, Thejas]
The optics table in OMC lab was
cleaned up, cameras and photodiodes used |
|
414
|
Fri Jul 15 22:14:14 2022 |
Koji | General | General | OMC Lab recovery for the OMC #002 test | - The lab is chilly (18degC)
- Cleaned the lab and the optical
table a bit so that the delicate work can |
    |
43
|
Thu Nov 29 21:18:23 2012 |
Koji | Optics | General | OMC Mounting Prisms have come | |
 |
382
|
Tue Oct 22 10:25:01 2019 |
Stephen | General | General | OMC PZT Assy #9 and #10 Production Cure Bake | OMC PZT Assy Production Cure Bake (ref.
OMC
elog 381) for PZT Assy #9 and #10 started |
 |
1
|
Fri Jun 15 15:45:49 2012 |
Koji | General | General | OMC Plan | LIGO Document G1200683-v1:
aLIGO OMC fabrication and testing |
|
108
|
Thu Apr 11 15:10:22 2013 |
Koji | General | General | OMC Progress | [Zach, Jeff, Koji]
- Jeff configured the bottom
side template to have a nominal value |
|
277
|
Tue May 16 19:05:18 2017 |
Koji | Optics | Configuration | OMC SN002 fix - temporary optics | Working on the SN002 OMC fix. Checked the
inventory. I think I am using C8 mirror as
the new temporary CM1 and PZT24 as the new |
|
70
|
Thu Mar 14 17:06:21 2013 |
Koji | Mechanics | General | OMC SUS work @LLO | EDIT (ZK): All photos on
Picasa. Also, I discovered that |
 |
25
|
Tue Oct 9 05:03:15 2012 |
Koji | Electronics | General | OMC Test Electronics Setup | |
 |
24
|
Tue Oct 9 04:59:24 2012 |
Koji | Optics | General | OMC Test Optical Setup | |
 |
81
|
Mon Mar 25 19:31:16 2013 |
Koji | Optics | General | OMC Top-side gluing | [Koji Jeff Zach]
AAA
|
   |
69
|
Thu Mar 7 15:53:47 2013 |
Koji | Mechanics | General | OMC Transportation fixture, OMC PD/QPD mounts | |
    |
407
|
Fri Feb 5 07:40:37 2021 |
Stephen | Supply | General | OMC Unit 4 Build Machined Parts | OMC Unit 4 Build Machined Parts are currently
located in Stephen's office. See image
of large blue box from office, below. |
|
411
|
Wed Jul 7 14:21:50 2021 |
Stephen | Supply | General | OMC Unit 4 Build Machined Parts | More explicit insights into the inventory
for the Unit 4 build. Image of inventory
included below. |
 |