  212   Sun Jul 20 17:20:39 2014 KojiGeneralGeneralThe 3rd (LIO) OMC was shipped out to LHO The 3rd (LIO) OMC was shipped out to LHO
on Friday (Jul 18) Morning.
At LHO
  
  211   Sun Jul 20 17:19:50 2014 KojiMechanicsCharacterizationI1OMC vibration test ~ 2nd roundImproved
vibration measurement of the OMC
Improvement
 9x 
  210   Thu Jul 17 02:19:20 2014 KojiMechanicsCharacterizationI1OMC vibration testSummary
- The breadboard has a resonance
at 1.2kHz. The resonant freq may be chagned
 6x 
  209   Tue Jul 15 03:34:16 2014 KojiOpticsCharacterizationOMC backscatter measurementBackscatter
measurement ~ 2nd round


Summary
 OMC_backscatter.pdfOMC_backscatter.png 
  208   Tue Jul 15 03:00:42 2014 KojiOpticsCharacterizationOMC backscatter measurementPresence of the misaligned SRM (T=20%)
was forgotten in the previous entry.
This effectively reduces the OMC reflectivity
  
  207   Sun Jul 13 17:46:28 2014 KojiOpticsCharacterizationOMC backscatter measurementBackscattering
reflectivity of the 3rdOMC was measured.

Attached: Measurement setup
 OMC_backscatter.pdf 
  206   Fri Jul 11 00:06:33 2014 KojiOpticsCharacterizationI1OMC PDDCPD#            
DCPD1      DCPD2
Housing#         
  
  205   Thu Jul 10 23:22:28 2014 KojiOpticsCharacterizationI1OMC QPDQPD#             
QPD1      
QPD2
  
  204   Thu Jul 10 08:34:57 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  203   Thu Jul 10 01:39:38 2014 KojiElectronicsGeneralPZT wireRich came to the OMC lab. Pins for the
mighty mouse connector were crimped on the
4 PZT wires.
 P7096669.JPG 
  202   Tue Jul 8 18:54:54 2014 KojiMechanicsCharacterizationPZT characterizationEach PZT was swept with 0-150V 11Hz triangular
wave.
Time series data for 0.2sec was recorded
 PZT_Scan.pdfI1OMC_PZT_Response.pdf 
  201   Tue Jul 8 04:08:06 2014 KojiGeneralGeneralExpoxy reapplication for beam dumpsFirstly, the excess epoxy was removed using
a cleaned razor balde
  
  200   Mon Jul 7 01:36:03 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  199   Sun Jul 6 08:31:14 2014 KojiOpticsCharacterizationHOM measurement with PZT vol swept3rd OMC, HOM diagram at PZT1=0V and PZT2=50V.
First coincidence with the carrier
is the 32nd-order carrier mode. Very good.
 HOM_plot.pdf 
  198   Sun Jul 6 03:56:40 2014 KojiOpticsCharacterizationHOM measurement with PZT vol sweptCavity FSR/TMS measurement (2014/7/5) with
PZT voltages swept from 0V to 200V (50V step)
 Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf 
  197   Sun Jul 6 02:46:20 2014 KojiOpticsCharacterizationOMC power budget3rd OMC power budget (2014/7/2)
Input power: 34.8mW
  
  196   Sun Jul 6 02:45:56 2014 KojiOpticsGeneralFSR Measurement3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a
HWP.
 finesse_measurements_log.pdf 
  195   Thu Jul 3 17:45:18 2014 KojiGeneralGeneralBeam dump delaminationHere is the resolution.
I'll apply fillets of EP30-2 along
the edges of the black glass (See figure).
 beamdump_delamination_solution.png 
  194   Wed Jul 2 18:58:42 2014 KojiGeneralGeneralBeam dump delaminationWhile the OMC breadboard was being inspected,
it was found that two out of five black-glass
beam dumps showed sign of delamination.
 beamdump_delamination.png 
  193   Wed Jul 2 16:41:43 2014 KojiGeneralGeneralOMC bakingOMC is back from the oven today.
To Do:
Optical tests
  
  192   Fri Jun 27 18:51:33 2014 KojiGeneralGeneralSupplyPTOUCH TAPE (12mm white) x 2
9V batteries
  
  191   Fri Jun 27 12:29:50 2014 KojiGeneralGeneralOMC bakingThe OMC went into the oven at around 2PM
on Thursday. It will be baked at 80degC for
48 hours.
 P6266536.jpg 
  190   Tue Jun 24 18:43:15 2014 KojiGeneralGeneralICS entries for the OMC baking/assemblyFor baking:

    Assembly Name aLIGO Output
Mode Cleaner
  
  189   Mon Jun 23 21:54:16 2014 KojiOpticsGeneralAll of the gluing completedThe bottom-side templates were removed.
The last beam dump was removed
TODO
  
  188   Fri Jun 20 18:59:12 2014 KojiOpticsGeneralAll of the invar blocks have been gluedAll of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed.
  
  187   Thu Jun 19 23:16:50 2014 KojiOpticsGeneralAll of the prisms have been glued- All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been
glued
 P6196525.JPG 
  186   Sat May 17 07:40:14 2014 KojiOpticsCharacterizationI1OMC cavity mirrors gluedI1OMC cavity mirrors were glued.
FSR = 264.82MHz => Lcav = 1.132m
(nominal 1.132m)
 Cav_scan_response_140516_Pitch.pdfCav_scan_response_140516_Yaw.pdf 
  185   Fri May 16 00:13:36 2014 KojiOpticsCharacterizationCavity mirror gluing part 1BS1/FM1/FM2 for I1OMC were glued.
FM1 had to be intentionally rotated.
FM1 had to be intentionally shifted
  
  184   Wed May 14 02:15:15 2014 KojiOpticsCharacterizationFSR/TSM adjustment of the OMC cavity 1. FSR was adjusted and measured with "the
golden arches" technique again.
FSR = 264.8412 MHz +/- 1400Hz =>
 Cav_scan_response_140503_Pitch.pdfCav_scan_response_140503_Yaw.pdf 
  183   Mon May 12 22:43:02 2014 KojiOpticsCharacterizationMeasured FSR/TSM of the OMC cavityData analysis of the FSR/TSM measruement
last week.
1. FSR was measured with "the
 Cav_scan_response_Pitch.pdfCav_scan_response_Yaw.pdf 
  182   Thu Apr 17 21:39:25 2014 KojiOpticsGeneralMore alignmentSTORY:
- The cavity mirrors have scattering
spots. The cavity alignment should have been
  
  181   Tue Mar 25 17:10:10 2014 KojiOpticsCharacterizationOMC spot position estimationSpot positions were inferred from the photos  OMC_spot.pdf 
  180   Mon Mar 3 02:46:21 2014 KojiGeneralCharacterizationSpot positions scannedSpot positions on CM1 and CM2 scanned according
to the recipes provided by the previous entry.
The best result obtained was:
  
  179   Fri Feb 28 19:50:11 2014 KojiGeneralGeneralMisalignment ABCD matrix for the aLIGO OMCRelationship between mirror misalignment
and cavity mode shift was calculated.
The technique described in T0900647
 misalignment.pdf 
  178   Tue Feb 18 18:58:38 2014 KojiGeneralGeneralLHO H1 OMC installation photosLHO OMC installation photos
  
  177   Tue Dec 10 16:41:51 2013 KojiGeneralGeneralTo BuyMasks / Wipes => done   
  176   Thu Nov 21 00:05:35 2013 KojiGeneralGeneralH1OMC electronics arrangementChecked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side)
 H1OMC_cable_arrangement.pdf 
  175   Mon Nov 4 19:43:56 2013 KojiGeneralGeneralH1OMC PackedH1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC.
  
  174   Wed Oct 23 02:45:07 2013 KojiGeneralGeneralPD realignmentDCPD2 got misaligned during the cable installation.
The PD alignment procedure have been gone
through again.
  
  173   Tue Oct 22 17:17:59 2013 KojiGeneralGeneralH1OMC cabling[Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables.
  
  172   Wed Oct 16 19:16:29 2013 KojiOpticsCharacterizationPD alignment 
 shim 1.5mm 001/002
  
  171   Tue Oct 15 18:50:08 2013 KojiOpticsCharacterizationQPD alignment1) Deburr the bottom surfaces of the QPD
housings
2) Aligned the QPDs
  
  170   Mon Oct 14 15:50:55 2013 KojiOpticsCharacterizationH1 OMC Power budgetLHO OMC power budget

    
 OMC_power_budget.pdf 
  169   Mon Oct 14 13:40:16 2013 KojiOpticsCharacterizationH1 OMC Optical testingSince the middle of September, the optical
tests of H1 OMC were took place.
Here is summary of the progress.
  
  168   Fri Sep 13 15:09:20 2013 KojiGeneralGeneralSprinkler installation: doneA sprinkler head was installed on the HEPA
enclosure. The head is covered with a plastic
cap.
 P9134379.jpgP9134378.jpg 
  167   Sat Sep 7 17:20:56 2013 KojiGeneralGeneralOMC/PD lab optical table wrapping[Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table
 P9064377.JPG 
  166   Wed Sep 4 22:22:54 2013 KojiGeneralGeneralH1 OMC wrapped and moved to the bake lab.[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven
  
  165   Tue Sep 3 17:03:25 2013 KojiGeneralGeneralH1 OMC gluing completed[Koji Jeff]
H1 OMC
  
  164   Fri Aug 30 12:25:29 2013 KojiGeneralGeneralH1 OMC Invar mount gluingThe Invar Mounting Blocks were glued on
the breadboard.
Serial number #1/2/5/6/7/8 ->
 P8304368.JPGP8304370.JPG 
  163   Fri Aug 30 12:24:28 2013 KojiOpticsCharacterizationH1OMC Spot positionsBeam heights on the diodes

DCPD1: 14.459mm -> With 1.5mm
 DCPD1.pngDCPD2.pngQPD1.pngQPD2.png 