40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 6 of 13  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  442   Wed Aug 24 02:57:43 2022 KojiGeneralGeneralEP30-2 bonding setupEP30-2 bonding setup  IMG_1178.JPGIMG_1179.JPGIMG_1180.JPG 
  443   Wed Aug 24 03:20:59 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (2)Bonding  11x 
  444   Wed Aug 24 03:26:43 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (3)Inspection

 
 8x 
  445   Wed Aug 24 11:29:47 2022 KojiGeneralGeneralOMC #002 ready for shipment[Stephen Koji]

The OMC #002 is ready for
shipment.
 IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg 
  446   Thu Aug 25 14:22:08 2022 KojiGeneralGeneralLLO OMC #001 Ballast Mass investigationInspected the past LLO add-on mass configuration.

There are unknown masses at the
DCPD side. It looks like a small SS mass
 DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG 
  447   Thu Aug 25 20:05:00 2022 KojiGeneralGeneralLLO OMC #001 Ballast Mass investigationHere is the balance mass info for the LLO
OMC#001 analyzed from the photographs


Added masses are: 50+10g,
 balance_mass_config_LLO.pdf 
  448   Fri Aug 26 22:29:02 2022 KojiGeneralGeneralTool Shipping PrepShipping preparation for the LLO
trip

Started
July 15, 2022 and finished Aug 30. So it
 PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg 
  449   Tue Sep 20 08:54:33 2022 KojiGeneralGeneralPD cage arrangementUpon the LLO work, the current PD arrangement
in the cages are:
CAGE B
  
  450   Mon Sep 26 14:27:49 2022 KojiGeneralGeneralLLO OMC ICS workOMC
#001


ICS Link: https://ics.ligo-la.caltech.edu/JIRA/browse/ASSY-D1201439-1
Already
  
  461   Fri Nov 18 18:41:05 2022 Camille MakaremGeneralGeneral2nd deep cleaning of OMC #1The four cavity mirrors in OMC #1 were
each scrubbed using acetone and a cotton
swab.
 PXL_20221118_213955948.jpg 
  462   Mon Nov 21 19:13:35 2022 KojiGeneralGeneralTransmission measurement (2nd deep cleaning of OMC #1)OMC Transmission measurement after
the 2nd deep cleaning

The 2nd deep cleaning didn't
 PXL_20221122_030736513.jpgOMC_loss.pdf 
  463   Tue Nov 29 15:54:47 2022 KojiGeneralConfigurationWindows laptop for WincamD Beam'R2 recoveryAaron took the set to Cryo lab

 
  
  473   Wed Jan 25 23:51:04 2023 KojiGeneralGeneralThe items packed for DownsQty1 1/2 mounts
Qty2 prism mounts
Qty6 gluing fixures
 PXL_20230127_055920944.jpg 
  482   Wed Feb 1 01:44:14 2023 KojiGeneralGeneralOMC (004) plan2/1 2:30PM~ Bonding reinforcement (Last
EP30-2 gluing)

2/2 1:00PM~ Peripheral attachment
  
  487   Sat Feb 4 03:33:22 2023 KojiGeneralGeneralOMC Lab InventoryAttachment 1: North Cabinet 2nd from the
left

Attachment 2: North Cabinet 3rd
 PXL_20230204_072749311.jpgPXL_20230204_072744686.MP.jpgPXL_20230204_073603041.MP.jpg 
  525   Tue Apr 18 07:59:46 2023 Madeline LesovskyGeneralGeneralTest Cure Bake - Curved Mirror Subassembly BondingThis is a test bake conducted in Air Bake
Oven A (ABO-A) held in the 40m Clean and
Bake facility. The overall objective is to
 6x 
  529   Wed Apr 26 14:43:44 2023 StephenGeneralLoan / LendingBorrowed Items for PZT DC Response Shadow Sensor SetupBorrowed for PZT DC Response Shadow Sensor
Setup (see Attachment 1):


Thorlabs PDA100A Photodiode
 PXL_20230426_185227710.jpg 
  535   Thu May 4 15:12:14 2023 KojiGeneralCharacterizationOMC (004): Final Testing
FSR measurement (dip) -
done May 3, 2023
FSR
measurement (RFAM injection) - done
  
  537   Thu May 11 10:46:17 2023 Thejas GeneralCharacterizationaLIGO OMC[Thejas, Camille, Koji]

We aligned the laser beam to the
cavity and drove the OMC cavity PZTs (0 to
  
  538   Fri May 12 10:00:06 2023 Camille MakaremGeneralLoan / LendingBorrowed Items for PZT DC Response Shadow Sensor SetupThe ThorLabs MDT694B piezo driver was returned
to the OMC lab.

 PXL_20230511_201545235.jpg 
  541   Tue May 16 10:26:12 2023 KojiGeneralCharacterizationOMC (004): Final Testing
FSR measurement (dip) -
done May 3, 2023
FSR
measurement (RFAM injection) - done
  
  543   Fri May 19 16:09:31 2023 StephenGeneralGeneralA+ OMC Build Progress, Week of 2023.05.15A+ OMC Build efforts ongoing or completed
this week:


 PZT lead onboard
  
  546   Fri Jun 2 17:15:44 2023 StephenGeneralGeneralA+ OMC Build Progress, Weeks of 2023.05.22 and 2023.05.29A+ OMC Build efforts ongoing or completed
in the last two weeks:


 PZT lead onboard
  
  549   Sun Jun 25 21:04:35 2023 KojiGeneralCharacterizationOptical assembly/testing of OMC (004) completedOptical assembly/testing of OMC
(004) completed
- OMC (004) with the transport fixture
 PXL_20230624_072237980.jpgPXL_20230624_072254264.jpgPXL_20230624_072304754.jpgPXL_20230624_072320422.jpg 
  550   Sun Jun 25 21:08:37 2023 KojiGeneralCharacterizationOMC (004) transported to Downs for cable furnishingOMC (004) + the transport fixture was transported
to Downs 227 with the boxes for OMC cabling
hardware and DCPD/QPD connector parts.
 PXL_20230624_073552303.jpgPXL_20230624_073531044.jpg 
  553   Thu Jul 6 10:19:23 2023 Thejas GeneralCharacterizationOMC Lab optic table [Camille, Thejas]

The optics table in OMC lab was
cleaned up, cameras and photodiodes used
  
  557   Mon Jul 10 20:29:05 2023 Koji GeneralCharacterizationOMC(004) PZT characterizationBelated entry: OMC(004) PZT Slow
scan / freq response measurements (May 10/11/17,
2023)
 PZT_Scan.pdfPZT_response.pdfOMC_OL_CLTF.pdf 
  559   Wed Jul 12 17:27:44 2023 KojiGeneralGeneralMitsutoyo Digital Caliper (100mm)We had missing digital caliper from the
clean room. As it is an essential component,
I have ordered a replacement.
  
  582   Mon Jul 31 13:19:14 2023 Camille MakaremGeneralGeneralplans for this week 31 July 2023Plans for this week:
1) Verify electronics setup for cavity
locking.
 4ae4ed99-007e-4246-85b6-fadccc5ba19d.mp4 
  583   Tue Aug 1 11:04:13 2023 Camille MakaremGeneralGeneralreoptimizing cavity alignment before locking[Camille, Thejas]
We rechecked the alignment this morning
and re-optimized the resonance a bit. There
  
  585   Thu Aug 3 07:22:19 2023 Camille MakaremGeneralGeneralparticle count and cavity optimization/alignmentYesterday, we measured the particle count
in the enclosure to ensure that the lower
setting on one of the HEPAs is still acceptable.
  
  588   Thu Aug 3 15:04:26 2023 StephenGeneralGeneralaLIGO Unit 4 Build, Cable Routing, Preparation[Dean, Stephen]

Unit #4 aLIGO OMC unit
was transported to the 40m Bake Lab.
 cable_routing_20230803_IMG_3527.jpg 
  591   Mon Aug 7 07:36:09 2023 Camille MakaremGeneralGeneralparticle count[Camille, Thejas]

We lowered the setting to MEDIUM on
  
  595   Mon Aug 7 16:00:30 2023 KojiGeneralGeneralOMC (004): Cable installation The writing of this elog is still on going

[Dean, Stephen, Koji]

4th
 IMG_3546.jpgIMG_3547.jpgIMG_3564.jpgIMG_3571.jpg 
  596   Mon Aug 7 16:01:05 2023 KojiGeneralGeneralOMC (004): Production completedOMC (004) Production completed. The OMC
together with the transport fixture is still
placed at the 40m clean room.
 PXL_20230807_210716110.jpgPXL_20230807_210724685.jpg 
  615   Tue Aug 22 15:51:15 2023 KojiGeneralGeneralInventory: C30655 PDsDuring the OMC(004) assembly, the stock
situation for Excelitas C30655 PDs was checked.

PD Cage H
  
  626   Mon Nov 27 21:05:51 2023 KojiGeneralGeneralInventory: C30655 PDsThe Cage H&I, as well as OMC DCPD bag,
were brought to the 40m for the 40m BHD.

 
  
  52   Sun Jan 6 23:22:21 2013 KojiMechanicsGeneralSolidWorks model of the OMC suspension    D0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.pngD0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.easm 
  58   Tue Jan 22 17:56:32 2013 KojiMechanicsGeneralRotary stage selectionNewport UTR80

    Sensitivity: 4 arcsec
  
  69   Thu Mar 7 15:53:47 2013 KojiMechanicsGeneralOMC Transportation fixture, OMC PD/QPD mounts   P3073218.JPGP3073219.JPGP3073223.JPGP3073225.JPGP3073227.JPG 
  70   Thu Mar 14 17:06:21 2013 KojiMechanicsGeneralOMC SUS work @LLOEDIT (ZK): All photos on
Picasa. Also, I discovered that
 2013-03-14_16.03.40.jpg2013-03-14_16.04.07.jpg 
  90   Mon Apr 1 10:28:03 2013 KojiMechanicsGeneralAdditional UV blast for the top surface[Koji, Lisa, Jeff, Zach]

Jeffs concern after talking with the
 P3283483.JPGP3283459.jpgP3283473.JPG 
  92   Wed Apr 3 17:39:38 2013 KojiMechanicsCharacterizationCalibration of the test PZTs before the glue testWe want to make sure the responses of the
PZT actuator does not change after the EP30-2
gluing.
 P4033491.JPGshadow_sensor_calib.pdf 
  98   Fri Apr 5 14:39:26 2013 KojiMechanicsCharacterizationCalibration of the test PZTs after the heat cureWe attached fused silica windows on the
test PZTs. http://nodus.ligo.caltech.edu:8080/OMC_Lab/93
The glued assemblies were brought
 shadow_sensor_calib_after_bake.pdfPZTresponse.pdf 
  102   Mon Apr 8 11:49:18 2013 KojiMechanicsCharacterizationPZT actuator tested at LLOTest result of the PZTs by Valera and Ryan
PZT  Length Angle
 #
  [nm/V] [urad/um]
 11  14.5   17.6
  
  124   Mon May 13 14:49:35 2013 KojiMechanicsCharacterizationMounting Glass Bracket still broke with tightenin stress[Koji / Jeff]
This is the elog about the work on
May 9th.
  
  125   Mon May 13 14:59:16 2013 KojiMechanicsGeneralInvar shim gluingThe invar reinforcement shims were glued
on the glass brackets on the breadboard.
  
  130   Thu May 23 23:41:48 2013 KojiMechanicsGeneralDCPD/QPD MountDCPD mounts and QPD mounts were attached
on the breadboard. They are not aligned yet
and loosely fastened.
  
  148   Sat Jul 6 17:10:07 2013 KojiMechanicsCharacterizationPZT Response analysisAnalysis of the PZT scan / TF data taken
on May 31st and Jun 1st.
[DC scan]
 PZT_Scan.pdfL1OMC_PZT_Response.pdf 
  158   Tue Aug 27 17:02:31 2013 KojiMechanicsCharacterizationSpot position measurement on the diode mountsAfter the PZT test, the curved mirrors
were aligned to the cavity again.
In order to check the height of the
 DCPD1.png 
ELOG V3.1.3-