Entry  Mon Apr 8 21:11:14 2013, Koji, Optics, General, PZT assembly gluing 
[Jeff, Zach, Koji] 
PZT assembly gluing
Glue gun -> to be returned to MIT
    Reply  Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures 
 
Entry  Thu Apr 11 15:10:22 2013, Koji, General, General, OMC Progress 
[Zach, Jeff, Koji]

- Jeff configured the bottom side template to have a nominal value
obtained from the solid works model. Note that the thickness of the
Entry  Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued Cav_scan_response_130412_Pitch.pdfCav_scan_response_130412_Yaw.pdf
[Jeff, Zach, Lisa, Koji]
Gluing of the cavity mirrors went very well!!!
Preparation
Entry  Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation 
[Jeff Koji]
- Placed the optics on the PD/QPD path
- Checked the alignment of the beam on the dummy PD/QPD mounts
Entry  Wed Apr 17 07:30:04 2013, Koji, Optics, General, QPD path glued 
Yesterday, all of the glass components for the QPD path were glued.

- Check the alignment of the beam with the cavity.
Entry  Thu Apr 18 11:43:59 2013, Koji, General, General, Mounting Glass Bracket Failure 
[Jeff, Koji]
- While we were working on the optics alignment, one of the mounting brackets made of glass god tore apart into two when a holding screw was removed.
The glass component had a crack at the very middle of the part.
Entry  Thu Apr 18 11:59:02 2013, Koji, General, General, DCPD path gluing 
[Jeff, Koji]
DCPD path gluing
Usual preparation
Entry  Fri May 3 21:09:08 2013, Koji, General, General, OMC is back 
L1 OMC is back on the table for the action next week.
Entry  Wed May 8 15:36:50 2013, Koji, General, General, Latest OMC schedule 

May
(done) Mon  6th: Invar plate arrival / Spot position measurement
(done) Tue  7th: Invar plate cleaning / Spot position measurement
/ EP30-2 arrival / Invar plate gluing to the test mounting brackets
(done) Wed  8th: Invar plate cleaning done / Baking of the test pieces (with Bob's
oven)
Thu  9th: ***After bake torque/force test***

***If the invar plate passes the test***
Thu  9th Light side invar plate gluing
Fri 10th Cable
Entry  Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress COMSOL1.png
 
Entry  Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing 
The invar reinforcement shims were glued on the glass brackets on the breadboard. 
We worked on the light side on May 10th and did on the dark side on May 13rd.
U-shaped holding pieces are used to prevent each invar shim to be slipped from the right place. 
    Reply  Mon May 13 15:00:23 2013, Koji, General, General, Current most reliable OMC schedule 
May
Tue 14th The OMC given to Bob (Air bake & Vac bake)

Mon 20th The OMC received from Bob
         Apply First contact
 
       Diode mount adjustment / Electronic tests
Tue 21st Diode mount adjustment / Electronic tests / Optical tests
Wed 22nd Final cabling (***Chub***)
Thu
23rd Final cabling / Packing
Fri 24th Packing / Shipping

Mon 27th? Arrival to LLO / Koji fly to LLO
Tue 28th Test on the optical bench
Wed 29th Test
Entry  Tue May 14 19:06:00 2013, Koji, Clean, General, OMC Baking 
The OMC is in the air bake oven now.
Entry  Mon May 20 14:59:21 2013, Koji, General, General, OMC is out from the oven 
The OMC came back to the table again.
No obvious change is visible: no crack, no delamination
The OMC was fixed on the table and the beam was aligned to the cavity
    Reply  Tue May 21 18:28:08 2013, Koji, General, General, Current most reliable OMC schedule 
- The wrong Mighty Mouse connectors for the PZT wires were prepared. The correct ones are in the vacuum oven till Tuesday morning.
- The thread holes for the cable pegs are 1/4-20 rather than 10-24.  This requires re-machining of the cable pegs & the C&B.
- We are waiting for the fast shipment of the from LHO
Entry  Thu May 23 23:41:48 2013, Koji, Mechanics, General, DCPD/QPD Mount 
DCPD mounts and QPD mounts were attached on the breadboard. They are not aligned yet and loosely fastened.
DCPD (mounting 4-40x5/16 BHCS Qty4)
Entry  Thu May 30 14:38:42 2013, Koji, Electronics, General, Cable fitting  
Yesterday Jeff and Chub worked on the cabling of the OMC. It turned out that the gender of the cable connectors 
going from the cavity side to  the connector bracket on top of the OMC were opposite from what is  needed.  
This way, the connectors can't fixed on the cable harness, thus they are free during the shipping.
Entry  Thu May 30 15:00:28 2013, Koji, Optics, General, QPD alignment 
The QPD alignment was adjusted using the aligned beam to the cavity and the 4ch transimpedance amplifier.
As I have a test cable for the QPD, I attached a DB9 connector on it so that I can use the QPD transimpedance
amplifier to read the photocurrent. The transimpedance of the circuit is 1kV/A. 
    Reply  Fri May 31 05:46:54 2013, Koji, Optics, General, QPD alignment QPD1.JPGQPD2.JPGQPD_calib.nb.zip
Peter F suggested to check the bottom surface of the PD housings if there is any protrusion/interference/whatever.
And that was true! It was found that the front side of QPD1 (Left) was lifted by a machining burr.
It seems that this burr consistently exists as the other one also have it (see QPD2 picture (right)) although it is not too terrible compared to
Entry  Mon Jun 3 21:19:03 2013, Koji, General, General, Planning 
Monday - Evening
(Koji)
[done] - DCPD alignment
Entry  Wed Jun 5 18:19:51 2013, Koji, General, General, Some recent photos from the OMC final test at CIT 
Applying First Contact for the optics cleaning
Entry  Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out CAM00011.jpgP6054027.JPG
[Koji, Jeff]
The L1 OMC finally sent out from Caltech!
Entry  Fri Jun 7 16:04:44 2013, Koji, General, General, [LLO] OMC arrived 
[Koji Zach Suresh]
The OMC arrived at LLO without any destruction!

    We found that one shock sensor on the box turned red, the other stayed white.
    We brought the Perican case to the changing
Entry  Mon Jun 10 10:04:37 2013, Koji, General, General, [LLO] OMC Test OMC_pow_cal.pdfresponsivity.pdfOMC_pow_cal_compensated.pdf
[Koji Zach]
We worked on the OMC test over the weekend.
- At the beginning, the measured OMC transmission was ~85% even after subtracting the junk light and sidebands from the calculation.
Entry  Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373
Entry  Thu Jun 13 12:12:20 2013, Zach, General, General, [LLO] OMC and OMCS in LVEA 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395
Entry  Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status preamp_arrangement.png
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation box: 250.8lb
Entry  Tue Jun 18 15:45:38 2013, Koji, General, General, [LLO] OMC installation in HAM6 
OMC installed in HAM6!
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7486
   
Entry  Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp 
http://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building)
Entry  Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4 PZT_assembly.pdf
Yesterday, Jeff and I bonded the PZT assemblies (#3/#4).
The attached is the arrangement of the components
    Reply  Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6 
PZT Assembly #5/#6 were glued on Fri Aug 9th
They are removed from the fixture on Mon Aug 12th.
All of the four PZT assemblies were moved to the OMC lab.
Entry  Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List 
Link to the "Mirror/PZT Characterization links"

Breadboard

BB1 OMC(001) OMC
Entry  Fri Aug 16 17:21:38 2013, Koji, General, General, [OMC002] Build started 
[Jeff Koji]

The breadboard (SN2) was loaded on the transportation fixture.

The laser side template was installed and the cavity mirrors were placed.
Entry  Thu Aug 22 15:34:03 2013, Koji, Optics, General, OMC Cavity side gluing 
[Koji Jeff]
o BS1, FM1, FM2 prisms were glued
=> This fixed the unstability of the OMC locking
Entry  Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV) 
The glass components for the I1 OMC top side were glued by the UV glue.
Breadboard SN#4
Wire bracket SN#5/6/7/8
Entry  Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment Gouy_FSR_130827.nb.zipP8284343.jpg
Short conclusion: 
The roundtrip cavity length for the H1 OMC was adjusted to be 1.145m 
instead of 1.132m such that the 19th HOMs of the lower sideband do not get resonant together with the carrier.
Entry  Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing 
H1 OMC Cavity side optics was glued on the breadboard
Curved mirror gluing
- Applied the UV glues to CM1/CM2 prisms.
Entry  Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing P8304368.JPGP8304370.JPG
The Invar Mounting Blocks were glued on the breadboard.
Serial number #1/2/5/6/7/8 -> I1 OMC cable side
Serial number #9/10/11/12 -> H1 OMC cavity side
Entry  Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed 
[Koji Jeff]
H1 OMC All Gluing completed
5 Glue H1 beam dumps (UV)
Entry  Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab. 
[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven (Oven F) and running without the actual OMC.
Entry  Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping P9064377.JPG
[Koji Jeff]
In order to prepare for the splinkler installation on the HEPA enclosure, the table with the optics was wrapped with Ameristat sheets.
    Reply  Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done P9134379.jpgP9134378.jpg
A sprinkler head was installed on the HEPA enclosure. The head is covered with a plastic cap.
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
[Chub, Jeff, Koji]
We worked on the wiring and routing of the cables.
- The cables for the PZT was installed first. 
Entry  Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment 
DCPD2 got misaligned during the cable installation. The PD alignment procedure have been gone through again.
Cavity locking 
- Removed the FC layers for the cavity related mirrors.
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
H1OMC PZT connector was replaced with the correct one. This was the final step for H1OMC.
Jeff and I packed the OMC and put it in the perikan case. It will be shipped tomorrow.
The other tools are also packed in the other box. Here is the list of the items
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Checked the PZT arrangement: Mighty Mouse Pin1&2 -> PZT2 (DCPD side), Mighty Mouse Pin3&4 -> PZT1 (QPD side)
DCPD response: 
Illuminate DCPD1 (T) -> DCPD B responded in MEDM
Entry  Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy 
Masks / Wipes => done
Entry  Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos 
LHO OMC installation photos
Entry  Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC misalignment.pdf
Relationship between mirror misalignment and cavity mode shift was calculated.
The technique described in T0900647 by Sam Waldman was used.
The angles and displacement of the mirrors and beams are defined in the attached figure.